文档库 最新最全的文档下载
当前位置:文档库 › 基坑墙(桩)顶水平位移监测方法

基坑墙(桩)顶水平位移监测方法

基坑墙(桩)顶水平位移监测方法
基坑墙(桩)顶水平位移监测方法

城市建筑┃岩土·基础工程┃U RBANISM A ND A RCHITECTURE ┃G ROUND F OUNDATION E NGINEERING

155

基坑墙(桩)顶水平位移监测方法探索

Explore the Monitoring Method of Horizontal Displacement in Pit Top of the Wall (Pile)

■ 夏汉庸1

郭利刚2

■ Xia Hanyong 1

Guo Ligang 2

[摘 要] 基坑开挖期间,墙(桩)顶水平位移监测数据对基坑整体变形的判断尤为重要,根据施工场地条件及所采用的仪器设备精度等因素,采用适宜的监测方法能够很大程度上提高监测精度,减少监测时间。本文介绍了几种常用的墙(桩)顶水平位移具体监测方法、数据处理过程以及监测过程中的注意事项。

[关键词] 基坑墙顶水平位移监测

[Abstract] During the excavation of pit, the monitoring data of wall (pile) top horizontal displacement is particularly importa- nt to judge the overall deformation of pit. According to some aspects of the conditions of the construction site and the accur- acy of used equipment, using appropriate monitoring methods can greatly improve the monitoring precision and reduce the monitoring time. In this article, the author describes several co- mmon top of the wall (pile) horizontal displacements of the sp- ecific monitoring methods, data processing and the monitoring process considerations.

[Keywords] pit top of the wall, horizontal displacement, moni- toring

基坑墙顶水平位移是指因基坑开挖引起的围护结构墙顶监测点移动轨迹在垂直于基坑边方向上的水平分量。由于基坑开挖场地条件的限制,墙(桩)顶水平位移监测费时费力且监测精度不高,在监测方法选择错误的情况下,甚至有可能出现监测数据出错的状况发生,事倍功半。本文就目前施工过程中常用的几种墙(桩)顶水平位移监测方法进行了总结和进一步的探索。 一、 视准线法

1. 监测点布置(见图1)

(1)在基坑的每一直线边的两端不受开挖变形影响的地方各埋设1个工作基点A、B;

(2)在A、B 两点连线的基坑围护墙顶按设计要求埋设工作测点C;(工作测点选点时可在A 或B 点安置仪器,后视另一工作基点再确定各测点位置,以使各工作测点较准确地位于A、B 的连线上)

图1监测点布置

2. 监测方法

(1)监测时,在一个工作基点上(如A 点)设站,后视另一工作基点(如B 点),固定仪器的照准部;

(2)用带毫米刻划的直尺的零点对准工作测点

中心,大致垂直基坑边并水平地放置;

(3)用已固定照准部的仪器望远镜直接读取直尺的刻划值d,d 的符号根据点与视线的关系确定,既工作测点位于视线的基坑边为正,反之为负。

3. 数据处理

(1)C 点当次位移变化量△i 通过下式计算可得:

△i =d i -d i-1(1-1)。

(2)累计位移值可用当次读数减初始读数求得,也可用各次位移值累加求得:

△累i =d i -d 0(1-2), 或△累i =∑△(1-3)。

式中:△i—监测点第i 次位移变化量; d i 、d i-1、d 0—第i 次、i-1次、初次监测时监测点偏离视线量;

△累i —监测点第i 次累计位移量。 (3)特点

观测方便,计算简单。 (4)适用范围

适用于矩形基坑,工地周边视野开阔,工作基点有条件布设在不受基坑变形影响的地方。 二、 极坐标法

1. 测点布置

(1)在基坑以外不受变形影响的地方设置工作基点A、B,A-B 距不小于A 点到最远工作测点的距离;

(2)在需要监测的基坑边设置工作测点。 2. 基本监测方法

在A 点安置全站仪,后视B 点,按坐标测量方法设置好仪器,然后观测工作测点C 的坐标值X、Y。当使用经纬仪观测时,则观测仪器站点到工作测点的平距及水平角,再计算工作测点的坐标。

3. 数据处理 (1)矩形基坑

矩形基坑可用测前换算或测后换算两种方法处理。

1) 测前换算就是在监测前把A、B 两点的统一坐标换算成坐标轴线与所监测的基坑平行的假定坐标,然后根据假定坐标对各工作测点进行坐标监测,直接测取各工作测点的假定坐标值,根据此坐标值用简单加、减法计算各点的位移变化量。

工作基点坐标换算:

图2 工作基点坐标

图中A 点的统一坐标X A 、Y A 可用下式换算成假定坐标x A 、y A :

x A =X A ·cosα+Y A ·sinα(3-1), y A =-X A ·sinα+Y A ·cosα(3-2)。

式中:x A 、y A —A 点在假定坐标系统中的纵横坐标值;

X A 、Y A —A 点的统一坐标值;

α— 统一坐标系纵轴与假定坐标系纵轴间夹角。

平行于y 轴基坑边工作测点当次位移量的计算:

小值边△C=x i -x i-1(3-3), 大值边△C=x i-1-x i (3-4)。

平行于x 轴基坑边工作测点当次位移量的计算:

小值边△C=y i -y i-1(3-5), 大值边△C=y i-1-y i (3-6)。 累计位移量计算: 累C=∑△C(3-7)。

也可利用上述当次位移量计算公式,把第i-1次观测假定坐标值换成初始假定坐标值进行计算。

式中:△C—监测点当次位移量,大、小值是以基坑两边的假定坐标值相比较来区分;

累C—监测点累计位移量;

x i 、y i —监测点第i 次观测假定坐标值; x i-1、y i-1—监测点第i-1次观测假定坐标值。 2) 测后换算就是每次根据A、B 两点的统一坐标测出各工作测点的统一坐标值,再根据统一坐标系与选取的假定坐标系轴线夹角和两次观测所得的坐标值差计算位移量。

工作测点位移量换算:

图3 工作测点位移量坐标

图中XOY 为统一坐标轴,X′与基坑边垂直且正向指向基坑内边的假定坐标系纵轴。

当C 点由于基坑变形由C 位置移到C′位置时,其位移引起的C 点在垂直于基坑边的位移量△C 可根据两次测得的C 点坐标值由下式计算而得:

△C=(X i -X i-1)cosα+(Y i -Y i-1)sinα(3-8) 监测点的累计位移量可选用下式计算而得:

(下转第162页)

基坑监测方案

XXXXXXX地块 基坑围护监测方案 XXXXX勘察院 二0一八年一月

XXXXXXX地块 基坑围护监测方案 项目负责: 校对: 审核: 监测单位:XXXXXX勘察院 监测资质:工程勘察综合类甲级单位地址:XXXXXXX 2018年1月8日

目录 一、项目概述 (4) 二、监测目的 (4) 三、监测执行规和依据 (5) 四、监测项目及容 (5) 五、监测点的布设 (5) 1.深层土体水平位移监测 (5) 2.地下水位观观测点 (6) 3.坑顶沉降及水平位移监测点 (7) 4.冠梁水平位移监测点 (7) 5.立柱沉降观测点 (8) 6.支撑轴力监测点 (8) 7.周边管线、桥梁、建筑物沉降观测点 (8) 8.坑外地面沉降监测点 (8) 六、监测项目的实施 (9) 1、监测控制网的布设 (9) 2、深层土体位移(测斜)监测 (10) 3、地下水位监测 (12) 4、竖向位移观测 (12) 5、水平位移观测 (13) 6、钢支撑轴力监测 (14) 七、监测周期、频率 (14) 八、监测控制指标(报警值) (15) 九、监测设备 (15) 十、本工程监测人员的配备 (16) 十一、监测成果反馈 (16) 十二、质量及安全保证措施 (16) 附: 1、单位资质证书 2、监测人员职称证书 3、监测点平面布置图

一、项目概述 本项目拟建的XXXXX地块位于XXXXXXX东侧、XXXXXX西侧、XXXXXX南侧。总用地面积XXXXXX平方米,建筑面积XXXXXX平方米。本项目主要拟建物包括XXXXXX住宅(18F)、XXXXXX地下室及其他配套设施。 本基坑开挖深度为3.51米-4.61米,坑中坑二次开挖0.59-1.81米。 基坑围护方法:本基坑采用SMW工法桩+钢支撑的围护方式。 基坑西侧开挖边界距离用地红线最近约2.5米,基坑南侧开挖边界距离用地红线最近约2.3米,西侧的用地红线为肛肠医院已建围墙。基坑东侧开挖边界距离用地红线最近约4米,东侧紧贴用地红线有自来水管线及电力管线,基坑开挖边界距离管线最近约6米。基坑北侧开挖边界距离用地红线最近约14米左右,红线外有电力、电信等市政管线。 按照有关规,本基坑安全等级为二级。 二、监测目的 通过监测工作,可以达到以下目的: ①、及时发现不稳定因素 由于土体成分和结构的不均匀性、各向异性及不连续性决定了土体力学性质的复杂性,加上自然环境因素的不可控影响,必须借助监测手段进行必要的补充,以便及时采取补救措施,确保基坑稳定安全,减少和避免不必要的损失。 ②、验证设计、指导施工 通过监测可以了解周边土体的实际变形和应力分布,用于验证设计与实际符合程度,并根据变形和应力分布情况为施工提供有价值的指导性意见。 ③、保障业主及相关社会利益 通过对周边环境监测数据的分析,调整施工参数、施工工序、重车进出以及停靠位置,确保地下管线的正常运行,有利于保障业主及相关方的利益。 ④、积累地区性基础工程施工经验 通过对围护结构、周边环境等监测数据的分析和整理,了解施工期间各监测对象的实际变形情况及所受的影响程度,分析基坑施工特征,为地区性类似的工程积累经验。

基坑深层水平位移监测方案

基坑深层水平位移监测方案 1概述 深层水平位移主要用于大地运动,如可能产生在不稳固的边坡(滑坡)或挖土工程周围的测向运动等,也可以用来监测软土地基处理,堤坝,芯墙稳定性,钻孔设置的偏差,打桩引起的土体位移,以及回填筑堤和地下工程的土体沉陷,也可用于沿海、江边重力存放物场的土层变化等。 2 仪器设备 测斜仪(一般测斜仪由探头、电缆、数据采集仪(读数仪)组成。探头的传感器型式有伺服加速度计式、电阻应变片式、钢弦式、差动电阻式等多种型式,目前使用最多的是伺服加速度式。国内有航天部33 所生产的CX 系列,国外有美国SINCO 公司的数字测斜仪,瑞士的PRIVEC 等) 内壁有导槽的测斜管(测斜管道由以下几部分组成:测斜管、连接管、管座、管盖。测斜管是用聚氯乙烯、ABS 塑料、铝合金等材料制成,管内有互成90 度四个导向槽,国产塑料测斜管尺寸多为:内径Φ58mm,径Φ70mm、长度分2m,3m,4m 三种。塑料连接管多采用市场上出售的聚氯乙烯塑料管制成,还可用软的万能接头相连。连接管的尺寸为内径Φ70mm,外径Φ82mm,长度分300,400mm两种。在管壁的两端铣制有滑动槽各4 条或仅一端铣制滑动槽4 条,各槽相隔90 度。管座位于测斜管底端,与管外径匹配,防止泥砂从管底端进入管内的一个安全护盖。管盖用于保护测斜管管口,防止杂物从管口掉入管内影响正常观测工作也由聚氯乙烯制成,其外形尺寸同管座。) 3监测仪器工作原理

测斜仪的工作原理是测量测斜管轴线与铅垂线之间的夹角变化量,从而计算出土层各点的水平位移大小。通常在坝内埋设一垂直并互成90°四个导槽的管子,当管子受力发生变形时,将测斜仪探头放入测斜管导槽内,逐段(一般50cm 一个测点) 量测变形后管子的轴线与垂直线之间的夹角θi ,并按测点的分段 长度,分别求出不同高程处的水平位移增量Δdi ,即Δdi = Lsinθi (1)由测斜管底部测点开始逐段累加,可得任一高程处的实际位移,即bi = ΣΔdi (2)而管口累积水平位移为:B = ΣΔdi (3)式中Δdi 为量测段内的水平位移增量;L 为量测点的分段长度, 一般常取015m ;θi 为量测段内管轴线与铅垂线的夹角;bi 为自固定点的管底端以上i点处水平位移;B 为管口在该次观测时的水平位移;n 为测斜孔分段数目,n = H/ 015 ,H 为孔深。测斜仪的工作原理见图 4设备安装和布置

基坑水平位移监测报告

基坑变形 监测报告 工程名称:

建设项目 一期基坑工程基坑变形监测报告现场监测人员: jjjjjj 二OO九年三月十八日 j

目录 一、工程概况 (4) 二、监测依据 (4) 三、监测项目与点位布置 (4) 5 5 5 6 8 9 17 25 26 5、测斜曲线图 (52) 6、侧向变形累计最大位移点位移~时间关系曲线图 (61) 7、地下水水位测试结果汇总表 (62) 8、总部经济区水位随时间变化图 (73)

9、监测点位平面布置图 (74) 一、工程概况 位于开创大道西南侧、揽月路以西一带,地处科学城中心区东部,西面毗邻初具规模的综合研发孵化中心,总建筑面积约34万平方米。该项目基坑安全等级为二级,按设计及规范要求并结合本项目的具体情况,本项目设置如下监测项目: 5、科学城总部经济区工程基坑支护监测点布置图。 三、监测项目与点位布置 1、基坑支护结构水平位移观测: 按设计要求,共布设31个监测点,编号为W1~W31,详见观基坑监测点布置图。

2、支护结构及土体侧向变形监测: 按设计要求,共布设27个监测点,编号为K1~K27,其中K2、K10、K15和K22为土体侧向变形监测点,详见基坑监测点布置图。 3、地下水位监测: 按设计要求,共布设19个监测点,编号为SW1~SW19,详见基坑监测点布置图。 3、地下水位监测采用钢尺水位计测得地下水位与管顶的距离,根据管顶高程即可计算地下水位的高程。将到开挖过程中地下水位与基坑开挖前地下水位高程进行比较,得到开挖过程中基坑周边地下水位的变化情况。 五、允许值及报警值 根据基坑支护设计要求,并结合工程实践经验,对该工程监测项目提出以下警戒

深基坑监测方案

佳惠·中央商厦 深基坑工程沉降、位移 监 测 方 案 编制人: 审核人: 审批人: 东星建设工程集团有限公司 2014年8月20日 目录 一、工程概况 (1) 二、监测目的与技术 (1) 三、基本原则 (2) 四、监测依据 (2) 五、监测项目内容 (2) 六、测试方法原理 (4) 七、监测工作布置 (5) 八、监测频率与资料整理提交 (6) 九、质量目标和保证措施 (6) 十、附图 (7)

一、工程概况 本工程由怀化市黄金屋房地产开发有限公司兴建。建筑用地面积5774平方米,总建筑面积92812.34平方米,建筑设计使用年限为50年,抗震设防烈度为6°。本建筑为框剪结构,地上二十五层,地下三层,耐火等级为一级,屋面防水等级为二级,建筑总高度为99.900m。本工程位于怀化市迎丰中路与鹤城区太平巷交汇处 本工程由于设计负三层地下室,导致基坑与周边落差较高,最高处近16米,施工安全隐患较大;地处城市中心地带,四周均为居民区,安全风险较大,本基坑工程在平面上呈不规则长方行,占地面积约13000 m2,设三层地下室,结构正负零相当于黄海高程214.96m,场地自然地面标高介于210.9~211.9m,在基坑支护设计中,地面标高取-0.30~0.50 m。基坑底标高取边承台底标高(-13.8m),则基坑开挖深度16.80~18.80 m。 根据工程地质勘察报告资料反映:基础以上主要由粉质粘土、卵石、强风化粘土岩、灰岩组成。 本工程地下水较丰富,主要由地下水、地表水及生活用水组成,地下水位受季节性影响变化较大;场地地形起伏较小, 本基坑工程重要性等级为一级,基坑工程采用复合喷锚网(护壁桩+锚杆+井字梁)为主的支护方案。 基坑周边为道路和民用建筑。 二、监测目的与技术要求 1、针对本工程的监测保护应考虑到以下各因素的影响: ①本工程施工周期较长,包括围护施工、基坑开挖及地下结构施工,而且基坑开挖面积较大,施工流程较多,对周围环境的保护要求较高。 ②本项目基坑紧邻怀化市迎丰中路,车流量大,对工程施工影响相当敏感,应严格控制土体的变形,确保安全和正常使用。

基坑水平位移监测

深基坑水平位移监测 测量深基坑水平位移可采用视准线法、小角度法、投点法、前方交会法、自由设站法、极坐标法等。本节简要叙述常用的小角度法、极坐标法及前方交汇法。 监测控制值: 监测频率: 基准点及测点布置要求: 监测基准点应在基坑开挖影响范围之外设立强制对中观测墩,且尽量通视各测点,观测墩使用混凝土浇筑地下1.4M地面1.2M,顶面长宽20CM*20CM,顶部嵌入焊接中心螺旋的钢板,螺旋与钢板垂直且均做防腐处理。监测基准点观测按三级平面控制要求施测,且每个月与高等级控制网联测一次。为防止观测墩被破坏,顶部应加钢保护盖。埋设示意图如下:

当采用精密的光学对中装置时,对中误差不宜大于0.5mm,且尽量通视测点。 在混凝土支撑、连续墙顶等混凝土结构上安装水平位移桩,可直接在结构上用冲击钻成孔插入水平位移桩,垂直放置,缝隙使用锚固剂填充,容易受施工破坏的地方应加保护装置。在土体等松软结构埋设水平位移测点应采用混凝土桩顶插入水平位移桩的形式,混凝土桩采用直径10CM地下50CM地面10CM,中心用钢筋加固。如有需要应加保护装置,并设置醒目标志。实物图如下: 仪器架设: 到达测量现场后打开仪器箱一段时间,使仪器温度与周围环境温度相适应,消除由环境温度带来的误差。检查设备是否完整,配件是否齐全,电源电力是否充足等。仪器架设时应注意仪器安全,在光滑的地面上架设全站仪时须在脚架上套绳索,防止脚架滑落损坏仪器。全站仪脚架高度与观测者肩高齐平,拧紧脚架螺旋,将脚架均匀架设在基准点上。取出仪器一手提全站仪手提柄,一手拧紧中心螺旋,将全站仪平稳架设在脚架上。 对中整平: 在有强制对中装置的观测墩上架设全站仪时,应一手提全站仪手提柄,另一只手旋转基座使仪器牢固地固定在观测墩上。调节基座脚螺旋使圆水准气泡居中,旋转仪器使管水准平行于两脚螺旋的连线,调节脚螺旋使管水准气泡居中,再将仪器旋转90°调节脚螺旋使管

基坑监测规范要求

基坑监测内容摘要 基坑围护体系随着开挖深度增加必然会产生侧向变位,关键是侧向变位的发展趋势如何。一般围护体系的破坏都是有预兆的,因而进行严密的基坑开挖监测非常重要。通过监测可及时了解围护体系的受力状况,对设计参数进行反分析,以调整施工参数,指导下步施工,遇异情可及时采取措施。应该说,基坑监测是保证基坑安全的一个重要的措施。 基坑监测规范要求如下: 一、监测点布置 1、土体的深层水平位移监测点宜布置在基坑周边的中部、阳角处及有代表性的部位;当测斜管埋设在土体中,测斜管长度不宜小于基坑开挖深度的 1."5倍,并应大于维护墙的深度。以测斜管底为固定起算点,管底应嵌入到稳定的土体中。 2、地下水位监测点的布置应符合下列要求: (1)、基坑内地下水位当采用深井降水时,水位监测点宜布置在基坑中央和两相邻降水井的中间部位;当采用轻型井点、喷射井点降水时,水位监测点宜布置在基坑中央和周边拐角处,监测点数量应视具体情况确定; (2)、基坑外地下水位监测点应沿基坑、被保护对象的周边或在基坑与被保护对象之间布置,监测点间距宜为20~50m。相邻建筑、重要的管线或管线密集处应布置水位监测点;当有止水帷幕时,宜布置在止水帷幕的外侧约2m处; (3)、水位观测管的管底埋置深度应在最低设计水位或最低允许地下水位之下3~5m。承压水水位监测管的滤管应埋置在所测的承压含水层中; (4)、回灌井点观测井应设置在回灌井点与被保护对象之间。 3、基坑周边环境监测点的布置应符合下列要求: (1)、从基坑边缘以外1~3倍基坑开挖深度范围内需要保护的周边环境应作为监测对象。

必要时尚应夸大监测范围。 (2)、位于重要保护对象安全保护区范围内的监测点的布置,尚应满足相关部门的技术要求。 (3)、建筑竖向位移监测点布置应符合下列要求: a、建筑四角、沿外墙每10~15m处或每隔2~3根柱基上,且每侧不小于3个监测点; b、不同地基或基础的分界处; c、不同结构的分界处; d、变形缝、抗震缝或严重开裂处的两侧; e、新、旧建筑或高、低建筑交接处的两侧; f、高耸构建筑基础轴线的对称部位,每一构筑物不应少于4点。 (4)、建筑水平位移监测点应布置在建筑的外墙墙角、外墙中间部位的墙上或柱上、裂缝两侧以及其他有代表性的部位,监测点间距视具体情况而定,一侧墙体的监测点不宜少于3点。 (5)、相邻地基沉降观测点可选在建筑纵横轴线或边线的延长线上,亦可选在通过建筑重心的轴线延长线上。其点位间距应视基础类型。荷载大小及地质条件,与设计人员共同确定或征求设计人员意见后确定。点位可在建筑基础深度 1."5- 2."0倍的距离范围内,由外墙向外由密到疏布设,但距基础最远的观测点应设置在沉降量为零的沉降临界点以外。 (6)、建筑裂缝、地表裂缝监测点应选择有代表性的裂缝进行布置,当原有裂缝增大或出现新裂缝时,应及时增设监测点。对需要观测的裂缝,每条裂缝的监测点至少应设2个,- 1 - 且宜设置在裂缝的最宽处及裂缝末端。

深基坑监测专项方案

(此文档为Word格式,下载后可以任意编辑修改!)(文件备案编号:) 施工方案 工程名称: 编制单位: 编制人: 审核人: 批准人: 编制日期:年月日

目录 1.工程概况 (1) 2.监测项目 (2) 2.1监测项目及工作量 (2) 2.2监测工期 (2) 3. 基坑支护监测方法 (2) 3.1测点布设 (2) 3.2水平位移观测 (3) 3.3沉降观测 (4) 3.4支护桩内力监测 (4) 3.5锚索内力监测 (6) 3.6水位监测 (6) 3.7深层水平位移 (7) 3.8巡视监测 (8) 4 .监测频率、报警值 (9) 4.1监测频率 (9) 4.2报警值的确定原则 (10) 4.3警戒值的确定 (10) 4.4报警 (11) 5.数据处理与信息反馈 (11) 5.1基本要求 (11) 5.2当日报表 (12) 5.3阶段性监测报告 (12) 5.4总结报告 (13) 5.5信息反馈 (13) 6.基坑监测应急预案 (14) 6.1监测措施、报警 (14) 6.2监测人员、监测仪器、材料及其他物资准备 (15) 7.监测工期保证措施 (15) 7.1进度保证 (15) 7.2修订进度计划 (16) 8.质量和安全保证措施 (16) 8.1质量保证措施 (16) 8.2安全保证措施 (16) 9.附件 (17)

1.工程概况 @@@@@@@@@@位于永城市芒砀路与光明路交叉口西北角,总建筑面积约39290㎡,项目包括1栋28层公寓楼及5层裙房,主楼为筏板桩基础,裙楼为承台桩基础。本工程内容为基坑支护、降水工程,基坑东西长约55m,南北57.3m,基坑开挖深度为8.9-9.8m,基坑设计使用年限为18个月,基坑采用“桩锚+止水帷幕”联合支护结构。 场地北侧邻近一栋现有6层住宅楼,该楼基础为条形基础,下部为复合地基——水泥土搅拌桩,桩深5.5m,桩径400mm,经计算按照本工程±0.00算,桩底标高为-8.0m,搅拌桩伸出建筑外400mm,建筑结构为砖混结构,拟建基坑北侧地下室外墙距离距离用地红线12.6m,距离住宅楼边线12.8m。靠西侧有一污水管道,距离围墙1.5m。南北有一污水管道,管道埋深为1.5m,管径700mm,拟移除。北侧拟建一层临建距离地下室外边线6m。 场地西侧临两栋6层住宅楼,条形基础,埋深2.78m,建筑结构为砖混结构;一个一层小作坊;一栋2层的商店,拟建基坑西侧地下室外墙距离用地红线7.7m,距离建筑物9.5m。西北角处有一污水管道,距离北侧围墙3.4m,距离南侧已有建筑围墙2.6m。西侧靠中部及偏南部有3个污水井和一个自来水井距离地下室外墙6.0m左右,埋深大约在1.5m左右。 场地东侧为芒砀路,拟建基坑东侧地下室外墙距离用地红线 2.7m,距离场地临时围墙5.7m,距离市政道路中心线36.0m。中部距离最外轴线14m有一天然气管道,埋深大约在1.5m左右。 场地南侧为光明路,拟建基坑南侧地下室外墙距离用地红线 1.8m,距离场地临时围墙3.8m,距离市政道路中心线35.0m。中部距离建筑临时围墙9m处位移污水井,埋深大约在1.5m左右。靠西侧有一自来水管道拟移除。 本工程所在场地,地下水丰富,基坑开挖过程中必须进行降水。 基坑周围环境条件复杂,容易受到基坑开挖影响,基坑一旦出现状况,则会带来严重后果。根据《建筑基坑支护技术规程》JGJ120-99和《建筑基坑工程监测技术规范》GB50497-2009,基坑侧壁安全等级定为一级,安全监测类别定为一级。

基坑墙(桩)顶水平位移监测方法

城市建筑┃岩土·基础工程┃U RBANISM A ND A RCHITECTURE ┃G ROUND F OUNDATION E NGINEERING 155 基坑墙(桩)顶水平位移监测方法探索 Explore the Monitoring Method of Horizontal Displacement in Pit Top of the Wall (Pile) ■ 夏汉庸1 郭利刚2 ■ Xia Hanyong 1 Guo Ligang 2 [摘 要] 基坑开挖期间,墙(桩)顶水平位移监测数据对基坑整体变形的判断尤为重要,根据施工场地条件及所采用的仪器设备精度等因素,采用适宜的监测方法能够很大程度上提高监测精度,减少监测时间。本文介绍了几种常用的墙(桩)顶水平位移具体监测方法、数据处理过程以及监测过程中的注意事项。 [关键词] 基坑墙顶水平位移监测 [Abstract] During the excavation of pit, the monitoring data of wall (pile) top horizontal displacement is particularly importa- nt to judge the overall deformation of pit. According to some aspects of the conditions of the construction site and the accur- acy of used equipment, using appropriate monitoring methods can greatly improve the monitoring precision and reduce the monitoring time. In this article, the author describes several co- mmon top of the wall (pile) horizontal displacements of the sp- ecific monitoring methods, data processing and the monitoring process considerations. [Keywords] pit top of the wall, horizontal displacement, moni- toring 基坑墙顶水平位移是指因基坑开挖引起的围护结构墙顶监测点移动轨迹在垂直于基坑边方向上的水平分量。由于基坑开挖场地条件的限制,墙(桩)顶水平位移监测费时费力且监测精度不高,在监测方法选择错误的情况下,甚至有可能出现监测数据出错的状况发生,事倍功半。本文就目前施工过程中常用的几种墙(桩)顶水平位移监测方法进行了总结和进一步的探索。 一、 视准线法 1. 监测点布置(见图1) (1)在基坑的每一直线边的两端不受开挖变形影响的地方各埋设1个工作基点A、B; (2)在A、B 两点连线的基坑围护墙顶按设计要求埋设工作测点C;(工作测点选点时可在A 或B 点安置仪器,后视另一工作基点再确定各测点位置,以使各工作测点较准确地位于A、B 的连线上) 。 图1监测点布置 2. 监测方法 (1)监测时,在一个工作基点上(如A 点)设站,后视另一工作基点(如B 点),固定仪器的照准部; (2)用带毫米刻划的直尺的零点对准工作测点 中心,大致垂直基坑边并水平地放置; (3)用已固定照准部的仪器望远镜直接读取直尺的刻划值d,d 的符号根据点与视线的关系确定,既工作测点位于视线的基坑边为正,反之为负。 3. 数据处理 (1)C 点当次位移变化量△i 通过下式计算可得: △i =d i -d i-1(1-1)。 (2)累计位移值可用当次读数减初始读数求得,也可用各次位移值累加求得: △累i =d i -d 0(1-2), 或△累i =∑△(1-3)。 式中:△i—监测点第i 次位移变化量; d i 、d i-1、d 0—第i 次、i-1次、初次监测时监测点偏离视线量; △累i —监测点第i 次累计位移量。 (3)特点 观测方便,计算简单。 (4)适用范围 适用于矩形基坑,工地周边视野开阔,工作基点有条件布设在不受基坑变形影响的地方。 二、 极坐标法 1. 测点布置 (1)在基坑以外不受变形影响的地方设置工作基点A、B,A-B 距不小于A 点到最远工作测点的距离; (2)在需要监测的基坑边设置工作测点。 2. 基本监测方法 在A 点安置全站仪,后视B 点,按坐标测量方法设置好仪器,然后观测工作测点C 的坐标值X、Y。当使用经纬仪观测时,则观测仪器站点到工作测点的平距及水平角,再计算工作测点的坐标。 3. 数据处理 (1)矩形基坑 矩形基坑可用测前换算或测后换算两种方法处理。 1) 测前换算就是在监测前把A、B 两点的统一坐标换算成坐标轴线与所监测的基坑平行的假定坐标,然后根据假定坐标对各工作测点进行坐标监测,直接测取各工作测点的假定坐标值,根据此坐标值用简单加、减法计算各点的位移变化量。 工作基点坐标换算: 图2 工作基点坐标 图中A 点的统一坐标X A 、Y A 可用下式换算成假定坐标x A 、y A : x A =X A ·cosα+Y A ·sinα(3-1), y A =-X A ·sinα+Y A ·cosα(3-2)。 式中:x A 、y A —A 点在假定坐标系统中的纵横坐标值; X A 、Y A —A 点的统一坐标值; α— 统一坐标系纵轴与假定坐标系纵轴间夹角。 平行于y 轴基坑边工作测点当次位移量的计算: 小值边△C=x i -x i-1(3-3), 大值边△C=x i-1-x i (3-4)。 平行于x 轴基坑边工作测点当次位移量的计算: 小值边△C=y i -y i-1(3-5), 大值边△C=y i-1-y i (3-6)。 累计位移量计算: 累C=∑△C(3-7)。 也可利用上述当次位移量计算公式,把第i-1次观测假定坐标值换成初始假定坐标值进行计算。 式中:△C—监测点当次位移量,大、小值是以基坑两边的假定坐标值相比较来区分; 累C—监测点累计位移量; x i 、y i —监测点第i 次观测假定坐标值; x i-1、y i-1—监测点第i-1次观测假定坐标值。 2) 测后换算就是每次根据A、B 两点的统一坐标测出各工作测点的统一坐标值,再根据统一坐标系与选取的假定坐标系轴线夹角和两次观测所得的坐标值差计算位移量。 工作测点位移量换算: 图3 工作测点位移量坐标 图中XOY 为统一坐标轴,X′与基坑边垂直且正向指向基坑内边的假定坐标系纵轴。 当C 点由于基坑变形由C 位置移到C′位置时,其位移引起的C 点在垂直于基坑边的位移量△C 可根据两次测得的C 点坐标值由下式计算而得: △C=(X i -X i-1)cosα+(Y i -Y i-1)sinα(3-8) 监测点的累计位移量可选用下式计算而得: (下转第162页)

全站仪坐标法在深基坑水平位移监测中的精度分析与应用

第34 卷第6 期2011 年12 月 测绘与空间地理信息 GEOMATICS &SPATIAL INFORMATION TECHNOLOGY Vol.34,No.6 Dec.,2011 全站仪坐标法在深基坑水平位移监测中的 精度分析与应用 包民先1,2 (1.江苏省南京工程高等职业学校,江苏南京211135;2.江苏联合职业技术学院南京工程分院,江苏南京211135) 摘要:针对施工场地狭窄,无法运用传统方法进行变形观测的情况下,对深基坑的水平位移监测提出了全站仪 坐标法。对全站仪坐标法监测水平位移的精度进行分析,通过分析结果与工程实践,验证了对于不同等级要求 的基坑水平位移监测,只要选择适当的全站仪进行作业,即能保证精度符合要求,提高作业效率。 关键词:全站仪坐标法;极坐标法;自由设站法;水平位移监测;深基坑 中图分类号:TU198 文献标识码:B 文章编号:1672 -5867(2011)06 -0255 -03 Accuracy Analysis and Application of Total Station Coordinate Method in Horizontal Displacement Monitoring of Deep Foundation Pit BAO Min -xian1,2 (1.Nanjing Engineering Vocational College of Jiangsu Province,Nanjing 211135,China; 2.Nanjing Engineering Department of Jiangsu Union Technical Institute,Nanjing 211135,China) Abstract:It is proposed that the coordinate method should be used as the solution to the problems caused by narrower construction sites where the traditional methods are not applicable.An analysis is carried out on the accuracy of horizontal displacement monitoring by Total Station coordinate method.By engineering practice and results analysis,it verified the requirements for different levels of hori- zontal displacement of foundation pit.Only if the appropriate operating Total Station was selected,the method can meet the require- ments to ensure accuracy and improve operational efficiency. Key words:Total Station coordinate method;polar coordinate method;free station method;horizontal displacement monitoring;deep foundation pit 0 引言有建筑物或地下管线距离较近时,为保证这些已有建筑物和地下管线的正常使用,就必须对基坑的水平位移进 在高层建筑物的深基坑施工中,为了确保支护结构和相邻建筑物的安全,在施工过程中,要对深基坑变形情况进行随时监测,保障施工过程中深基坑支护结构及周围建筑物的稳定和安全。其中,深基坑围护结构墙顶的水平位移监测是非常重要的。可靠、及时、准确的观测数据对于施工过程的决策有着决定性影响。然而,实际施工现场往往场地非常狭窄,围挡外常有既有的道路和建筑物,围挡内有施工车辆等移动设备和临时堆积材料,基坑周边环境往往非常复杂。在施工场地范围及周围无法实施传统的监测方法进行水平位移观测,这一问题在目前深基坑的施工中广泛存在,具有普遍性。当基坑离原行定期监测,以便发现异常情况能及时采取处理措施,将水平位移限制在允许值之内。 基坑水平位移监测的常用方法主要有经纬仪视准线法、小角度法等,这些方法的特点是使用经纬仪即可进行观测,基于基坑附近有相对稳定的地面基准点为基础,并保证在监测点通视的条件下才能实施。但在观测基坑不 同边水平位移时需进行仪器搬站,观测所需时间较长。 常规的监测方法已不能适应城市深基坑施工的复杂环 境。目前,随着智能型全站仪的普及和应用,采用极坐标法或以极坐标法为基础的自由设站法(统称为全站仪坐标变化法,简称为全站仪坐标法),可直接测定任意方向 收稿日期:2010 -11 -25 作者简介:包民先(1977 -),男,山东海阳人,讲师,河海大学测绘工程专业硕士研究生,主要从事工程测量方面的教学与科研工作。

深层水平位移观测检测报告

深层水平位移观测 检测报告
xx-20xx-00xx
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 公司 二〇一三年 x 月

声明
ii

试验室名称:
委托/施工单位 工程名称
工程部位/用途 样品描述
主要仪器设备及编号
序号
深度 (m)
第 次位 移值
(mm)
深层水平位移试验检测报告
水平位移数据汇总表
第 次位 第 次位 第 次位
移值
移值
移值
(mm) (mm) (mm)
第 次位 移值
(mm)
第 次位 移值
(mm)
委托编号 样品编号 试验依据 判定依据
报告编号
位移-深度 —时间曲线
第 页共 页
ii
检测结论:
备 注:
试验:
审核:
签发:
日期:


日 (专用章)

目录
第 1 章 工程概况 ........................................................................................................................1 第 2 章 检测目的 ........................................................................................................................1 第 3 章 检测依据 ........................................................................................................................1 第 4 章 检测设备 ........................................................................................................................2
4.1 主要仪器设备 ...................................................................................................................... 2 4.2 主要仪器设备 ...................................................................................................................... 2 第 5 章 检测等级 ........................................................................................................................2 第 6 章 仪器工作原理及方法 ....................................................................................................3 6.1 仪器工作原理 ...................................................................................................................... 3 6.2 仪器使用方法 ...................................................................................................................... 4 第 7 章 检测数据处理 ................................................................................................................5 第 8 章 检测结论及建议 ..........................................................................................................11
iv

基坑开挖监测方案

1.工程概况 拟建综合楼工程项目为地下二层、地上八层(局部三层、五层),设地下室二层,预计开挖深度约为地面以下9.0m左右。挡土结构和支承结构为钻孔灌注桩,止水桩为高压旋喷水泥土桩,大量土方为支撑和支挡下挖土。 地理位置处于解放东路、茶局路交汇处西北角,场地为原供电局旧址。基坑四周建筑物密集,东侧为十层交通大厦,其余四周为4-5层砖混结构的住宅楼,紧邻基坑为110KV城中高压变电所,该所为本工程监测的重点。 设计单位:工程桩为机械工业部深圳设计研究院,围护桩为南京南大岩土工程技术有限公司,《岩土工程勘察报告》由宜兴市建筑设计研究院提供。 2.施工监测的重要性和目的 2.1施工监测的重要性 在基坑开挖的施工过程中,基坑内外的土体将由原来的静止土压力状态向被动和主动土压力状态转变,应力状态的改变引起维护结构承受荷载并导致围护结构和土体的变形,围护结构的内力(围护桩和墙的内力,支撑轴力或土锚拉力等)和变形(深基坑坑内土体的隆起、基坑支护结构及其周围土体的沉降和侧向位移等)中的任一量值超过容许的范围,将造成基坑的失稳破坏或对周围环境造成不利影响,深基坑开挖工程往往在建筑密集的市中心,施工场地四周有建筑物和地下管线,基坑开挖所引起的土体变形将在一定程度上改变这些建筑物和地下管线的正常状态,当土体变形过大时,会造成邻近结构和设施的失效或破坏。同时基坑相邻的建筑物又相当于较重的集中荷载,基坑周围的管线常引起地表水渗漏,这些因素又是导致土体变形加剧的原因。基坑工程设置于力学性质相当复杂的地层中,在基坑围护结构设计和变形预估时,一方面,基坑围护体系所承受的土压力等荷载存在着较大的不确定性;另一方面,对地层和围护结构一般都作了较多的简化和假定,与实际有一定的差异;加之,基坑开挖与围护结构施工过程中,存在着时间和空间上的延迟过程,以及降雨、地面堆载和挖机撞击等偶然因素的作用,使得现阶段在基坑工程设计时对结构内力计算以及土体变形的预估与工程实际情况有较大的差异,并在相当程度上仍依靠经验。因此,在基坑施工过程中,只有对基坑支护结构、基坑周围的土

基坑监测方案资料

海曙科技创业大厦基坑支护工程监测方案 一、编制依据 1.国家行业标准《建筑基坑支护技术规程》(JGJ120-99); 2.《建筑变形测量规程》(JGJ/T 8-97); 3.浙江省标准《建筑基坑支护技术规程》(DB33/T1008-2000); 4.宁波市建筑设计研究院勘察分院提供的《宁波天元大厦工程地质 勘察报告》; 5.《海曙科技创业大厦基坑支护工程施工图》(宁波市建筑设计研究 院); 6.宁波市城乡建委专家组编写的宁波市行业标准《宁波市软土深基 坑支护设计与施工暂行技术规定》; 二、工程概况 宁波海曙科技创业大厦基地位于宁波市海曙区,位于中山西路的北侧,南临花池巷,东靠亨六巷,西到布政巷。基地面积为8084平方米。总建筑面积为59916平方米。地上26层,地下2层,为剪力墙结构,采用孔灌注桩桩基础。 本工程±0.00相当于黄海高程3.8m,基坑开挖深度为约9.5m,基坑开挖面积6645m2,基坑四周延米350m。地下室采用排桩加两道混凝土支撑的支护形式。场地由宁波市建筑设计研究院勘察分院勘察。结构部分由宁波市建筑设计研究院一所设计。 三、监测人员

主要监测管理人员表

四、监测目的、内容、布设及要求 (一)监测目的 为了确保支护结构的安全施工,了解基坑开挖过程中支护结构的安全状况,验证支护结构设计对整个基坑施工过程和内部结构进行施工监测非常必要,监测还可以发现在设计中因地质等因素而没有考虑到可能在施工中影响安全的状况为及时对局部进行加固调整施工提供依据,同时可以根据监测资料总结工程经验,为提高设计水平提供依据。 (二)监测内容 1、深层土体位移观测 基坑侧向变形观测是基坑开挖支护施工过程监测中一项地下各处水平位移的监测方法,常用测斜仪进行测量,它是一种可以精确测量垂直方向土层或围护结构内部水平侧向位移的工程测量仪器,本次工程布设9个水平位移测量监测孔。 2、环梁及立柱水平位移观测 基坑开挖工程施工场地变形观测的目的是通过对设置在支护场地的观测点进行周期性的测量,求得各观测点坐标的变化量,提供评价支护结构和地基土的稳定性技术数据, 本次工程布设了33个环梁和立柱水平位移监测点。 3、环梁及立柱沉降测量 沉降测量是通过精密水准仪以某一起始点为基准测量各点每次高程变化得到各相应点的沉降量(可以用国家水准控制网中的水准控制

基坑监测报告(模板)

********* 基坑变形监测报告 2018年10月

********** 基坑变形监测报告 工程名称:****** 工程地点:****** 监测日期:2018年X月X日~2018年X月X日

目录 一、工程概况........................... 错误!未定义书签。 二、监测依据........................... 错误!未定义书签。 三、监测内容........................... 错误!未定义书签。 四、监测点布置和监测方法 ............... 错误!未定义书签。 五、监测工序和测点保护 ................. 错误!未定义书签。 六、报警值............................. 错误!未定义书签。 七、监测时长和频率 ..................... 错误!未定义书签。 八、监测成果及分析 ..................... 错误!未定义书签。 九、附表、附图......................... 错误!未定义书签。

一、工程概况 工程场地地处*******,北池一路西首路南侧,文昌馨苑居住区西侧。拟建*****及地下车库概况如下: 表1 工程概况 建筑物名称地上 /地 下 层数 高度 (m) 基础尺寸 (m2) 基底 标高 (m) 场地 整平标高 (m) 开挖 深度 (m) **** 11/2 约35 66.55×13.20 83.2 87.9 3.9 **** 11/2 约35 66.55×13.20 83.2 87.1-88.3 3.9-5.0 **** 0/1 5 3×3 83.2 87.9 3.9 基坑平面尺寸:89.1m(东西最大尺寸)×80.1m(南北最大尺寸) 基坑支护深度:3.9-5.0m 二、监测依据 1.《建筑地基基础设计规范》(GB5007-2002)。 2.《建筑基坑工程监测技术规范》(GB50497-2009)。 3.《工程测量规范》(GB50026-2007)。 4.《建筑变形测量规程》(JGJ/T 8-2016)。 5. 基坑支护方案、施工方案。 三、监测内容 1.基坑顶部竖向位移; 2.基坑顶部水平位移; 3.基坑周边地表竖向位移;

基坑监测方案

XXXXXXX地块基坑围护监测方案 XXXXX勘察院二0一八年一月

XXXXXXX地块 基坑围护监测方案 项目负责: 校对: 审核: 监测单位:XXXXXX勘察院 监测资质:工程勘察综合类甲级单位地址:XXXXXXX 2018年1月8日

目录 一、项目概述....................................... 错误!未定义书签。 二、监测目的....................................... 错误!未定义书签。 三、监测执行规范和依据............................. 错误!未定义书签。 四、监测项目及内容................................. 错误!未定义书签。 五、监测点的布设................................... 错误!未定义书签。 1.深层土体水平位移监测........................... 错误!未定义书签。2.地下水位观观测点............................... 错误!未定义书签。3.坑顶沉降及水平位移监测点....................... 错误!未定义书签。4.冠梁水平位移监测点............................. 错误!未定义书签。5.立柱沉降观测点................................. 错误!未定义书签。6.支撑轴力监测点................................. 错误!未定义书签。7.周边管线、桥梁、建筑物沉降观测点............... 错误!未定义书签。8.坑外地面沉降监测点............................. 错误!未定义书签。 六、监测项目的实施................................. 错误!未定义书签。 1、监测控制网的布设............................... 错误!未定义书签。 2、深层土体位移(测斜)监测....................... 错误!未定义书签。 3、地下水位监测................................... 错误!未定义书签。 4、竖向位移观测................................... 错误!未定义书签。 5、水平位移观测................................... 错误!未定义书签。 6、钢支撑轴力监测................................. 错误!未定义书签。 七、监测周期、频率................................. 错误!未定义书签。 八、监测控制指标(报警值)......................... 错误!未定义书签。 九、监测设备....................................... 错误!未定义书签。 十、本工程监测人员的配备........................... 错误!未定义书签。十一、监测成果反馈................................. 错误!未定义书签。十二、质量及安全保证措施........................... 错误!未定义书签。 附: 1、单位资质证书 2、监测人员职称证书 3、监测点平面布置图

相关文档