Design phase of the project cost

management

Abstract

Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives.

Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy,

Even under the WTO and China's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.

As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.

Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority, and so on.

With the historical process, after recovery, reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic development, the system's many problems have also exposed. Generally speaking, the budget estimate is based on direct participation in the management of national economic activity as a precondition. enterprise is not the actual economic entities. Due to the characteristics of the planned economy, and, at the time under the conditions of productivity, will inevitably become a shortage in the economy.

In severe shortage of commodities under the conditions, as long as a certain level of investment, will be certain outputs. In this environment, the project planning and technical argumentation there can be no economic analysis. State control of the project cost constitute key factors equipment and materials prices, wages and taxes of artificial distribution. In this relatively stable economic environment, the budget estimate for the system approved project cost, help the government to carry out investment plans to play a major role.

As the socialist market economic system established, requires us to predict project investment and control. In recent years, international investment project developed to the requirements of prior pre-control and in the middle of control. China, the traditional practice in an objective light on the cause decision-making, implementation heavy, light the economy and technology,

First, the consequences of victimization,Due to the technical personnel of the project technical and economic concepts and a weak awareness of cost control, cost

management makes the quality difficult to raise. Project Cost control is difficult to achieve long-term goals.

Second, the various stages of the project management view of the above circumstances, My first academia in the 1980s made the whole process of cost management and control concept, building departments will study the feasibility of projects and the budgets and final accounts to two extended at the request of the corresponding regulations put our cost management concepts and methods referred to a new height.

Our task now is to be modern and cost management in line with China's national conditions of the market economy system goal, learn from the advanced experience of the developed countries, and establish sound market economic laws of project cost management system, efforts to increase the project cost levels. An investment decision-making phase of the project cost management construction project investment decision-making stage is proposed project proposals; conduct a feasibility study to determine investment estimation and the final preparation of design task. At this stage, the project's technical and economic decision-making, of the construction project cost of the project after the completion of the economic benefits have a decisive influence, The construction cost is an important stage control.

China's current stage of the project cost for the project management for the purpose of clearing price, and focusing only on the construction process of cost control, neglected before the start of the project investment decision-making stage of cost control. Investment decision-making phase of investment projects is estimated an important basis for decision-making. It has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. Because of this phase is the preliminary work of projects, the information can not be fully, comparable works more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at this stage do something.

The various stages of the project cost control in the decision-making phase

project cost control. Right project planning phase of the cost, many owners have the wrong understanding that the lower the cost the better. Cost control is not a unilateral issue, and should be a number of factors, a combination of practical, comprehensive consideration. The construction project investment decision-making stage, the project's technical and economic decision-making, Cost of the project after the completion of the project and the economic benefits, with a decisive role in project cost control is an important stage, rationally define and control the direction of the project cost of accurate positioning and building Optimization guiding role.

In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investment and can form a good proportion. Otherwise, invest more, less effective, resulting in loss of control and waste of investment.

At present, some of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientific proof. Feasibility Study untrue, false or engineering functions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in the study for the project after the smooth functioning buried a lot of hidden problems, lead to insufficient follow-up funds for the project and had to extend the time limit so that the project could not have planned the use of cost-effective, even become hopeless completion of the beard works.

Therefore, in order to phase in the investment decision-making effectively control construction costs, we must do the following aspects:

ⅰImplementation of the construction project and corporate accountability, Construction of the project from planning to implementation of the entire process and the use of the funds to repay responsibilities to the people. in addition to establishing a legal system and the project supervision matching mechanism by the departments in charge of the industry and supervision departments for setting up a monitoring group to oversee the use of funds.

ⅱA realistic approach to market analysis, to avoid the blindness of the project

decision-making, reduces and reduces investment risk. Fully consider building projects in the future market competitiveness, design task more scientific and reliability.

ⅲCapital financing must have a formal commitment document, the parties must do investment funds in place, and funds must have documents to ensure that the project can be approved after the scheduled implementation. To the various loan conditions should be carefully analyzed to minimize the burden of interest and repayment pressure.

ⅳTo strengthen the engineering geology, hydrology, geology and land, water, electricity, transport, environmental projects such as external conditions for the work of depth to make the investment estimate there are sufficient grounds.

Taking extensive investigation and research, comparison of similar projects, seriously functional analysis, multi-program comparison and choice. After full technical appraisal and economic evaluation, and the final technologically advanced, functional and reliable. Reasonable economic projects, thus calculate a more accurate and realistic estimation of the amount of investment, so that the project cost from the start positioning in a more reasonable level.

The design phase of the project cost control for a long time, China's building control very effective, - investment projects is not uncommon, this will affect owners of investment returns, it adds to the owners and within budget, as well as difficulties in fund owners, the impact on the future management or the owners make payments in arrears, and so on. Hence, the control of the project cost is of great significance, however the project cost is the primary means of control design,

Currently most of the property owners in the design stage seldom works on cost control, and they found that the cost of the design will not have a great impact, it is wrong, on the contrary, Design phase of the project cost control is the most important step. Because it determines engineering design, construction methods, materials and equipment types, models of the project cost is of critical significance, design optimization phase of the program or minor changes, project cost will have a

significant impact, Design phase of the project cost control of the total project cost of 70%. Following is how to control the project from design to create the Law: ⅰAs the owners must design, the design selected on the quality level is a direct impact on the quality of product design level, and the design quality products in the level of direct influence on the pricing of the works. Different design units on the same project design are different. the same item of different design institute works between certain aspects of the project cost on the existence of differences between, We assume that with a design from two different design institute to design, Construction plans after the completion of a requested advisory unit cost to do the budget, certainly different design institute the total cost of the project is absolutely not the same, and most of the difference between the two over 10% even more than 30%, and not necessarily high cost than the design of low cost, and good design is often low cost, We all know that different people have different design styles and different levels, the design works naturally, therefore chosen to design units is the control on the first step. Through tender to select the design of the units is a good method, the tender documents to elaborate on this particular aspect of the requirements, cost control targets, and so on.

2设计阶段的工程造价控制

长期以来,我国建筑控制很有效,因此,控制工程造价具有重要意义, 但工程造价的主要方法是控制设计。

目前大部分的业主在设计阶段很少工程的成本控制,而他们认为成本的设计不会有太大的影响,这是不对的,相反的,设计阶段的工程造价控制是最重要的一步。因为它决定了工程设计、施工方法、材料和设备的种类,优化设计阶段的程序或小的变化, 工程造价将会产生重大影响,设计阶段的工程造价控制项目总成本的70% 。以下是如何控制工程从设计到管理。

2.1 作为业主,必须重视设计

设计选定的质量水平直接影响产品质量的设计水平, 而设计产品质量的水平,直接影响定价的工程量。不同的设计单位对同一项目的设计是不同的。同一项目的不同设计研究院工程之间某些方面的工程造价就存在分歧之间,我们假设设计由两个不同的设计院设计, 施工图完成后,所要求的咨询单位成本做预算。当然不同设计院的项目的总成本是绝对不一样的, 大部分两者的差异超过10% ,甚至超过30% , 而不一定是成本高,比设计成本低,良好的设计往往是成本低,我们都知道,每个人有不同的设计风格,不同层次的设计作品自然因此选择设计单位,是管制的第一步。通过招标选择设计单位,是一个很好的方法,在招标文件中详细说明这方面的要求,成本控制目标等等。

否则,在以后的设计过程中设计单位会提出增加成本的设计要求;通过招标项目的设计进入市场,为选择最好的设计单位。

2.2 提倡设计招投标和设计优化战役模式设计单位评估

由专家组成, 按照适用,经济,美学原理和先进技术, 结构合理,以满足建筑节能和环保的要求,综合评价的优点,规划设计, 择优确定中选方案。

成功的投资计划估计将接近一般建设工程范围内的投资。这意味着两个设计合约,将帮助设计方案的选择和竞争机会,以确保获选设计先进的技术,独特的新颖性,适应性,以及控制工程造价。设计单位要努力提高自身素质,该项目设计巧妙构思, 当代降低工程成本上动脑筋,以提高设计质量, 力争把设计阶段的工程造价控制批准的投资上限。

2.3 加强设计阶段

以加强监督专员,以确定一个合理的设计, 成熟的技术,减少在施工阶段主要设计变化和在节目中, 在有效控制了工程造价将扮演一个角色。工程的设计,如果工程监理介入排除不利因素,一般可排除80%的错误。在整个建设过程中的成本控制,在开始施工时尽量节约投资20%,关键施工阶段的识别和控制成本。

监督的设计阶段,包括: 设计院的设计图纸和说明,协助业主处理不同设计方案的经济, 资本开支与发展的初步估计,以确保投资能够得到最有效的利用。与业主,监理,包括:

根据设计院提供的设计图纸和说明,协助业主处理不同的设计方案经济,资本支出发展的初步规划,以确保投资能够得到最有效的利用;与业主不同的设计方案, 需要计算自己的材料和设备进行成本分析和研究, 对设计人员的费用,以协助他们在投资限额范围内设计,以节省投资。寻求一次性投资少,经济好的设计方案,取得最合理的经济指标。

2.4积极推动所谓的上限限额设计

即使批准的设计任务书和投资估算,在保证功能要求的前提下。初步设计和概算控制, 据初步批准的预算总额为设计和施工图设计控制。而每一个专业,每一个都有一个门槛设计的一个目标。在设计过程中,设计师要进步多方案,优化设计, 确保设计在技术上是先进,合理,创新,时尚,而不是打破限制投资的目标, 从而杜绝了工程设计,提高安全系数和设计标准, 或只考虑技术可行性的计划,而非经济理性的现象, 这项工程的费用,以确保有效控制。

又称价值工程的价值分析,是一种现代科学管理技术, 是一个新的技术经济分析的是产品的功能分析,以节约资源,降低成本的目的,一个有效的方法。它弥补了传统的成本管理单纯强调降低成本和质量管理只强调改善质量缺陷,建设,有利于解决长期存在的时间长,浪费大,质量差,成本高的问题。价值工程法一般分为三个步骤:评估的面向对象技术和经济评分评分;计算对象的技术和经济指标; 计算几何设计的物体,平均从比较中选择最佳的设计。

3 建设项目实施阶段的单位工程造价管理

控制工程成本,是合理的该项目达到质量标准的前提下,在投资决策阶段, 设计及建造阶段的项目,把项目审批出现在管制范围内,力争在各项建设工程合理使用人力, 物力和财力资源,以取得良好的投资效益和社会效益。

项目成本控制和管理是一个动态的过程。动态的市场经济,使投资在确定与

控制变得更为复杂,这将要求施工单位对工程造价管理的项目贯穿整个过程中,它必须有一个全面的焦点。

执行阶段的项目。实施阶段的工程造价管理是实施全过程项目管理。项目实施阶段的工程造价管理可分为三个部分:投标管理施工管理和结算管理。

3.1 招标施工阶段的施工单位招标制度

控制工程造价的有效手段,申办组织,可以提高成本效益的工程,并确保工程质量, 缩短建设周期,投资回报, 施工单位可充分利用招标的手段,有效控制成本。

施工编号10月7部令发布了“合同与施工合同定价管理” 明确指出,在工程招标使用库存。这就要求建设单位进行招标, 在招标文件中,不仅包括通常的内容如债券投标前附表,招标债券合同的条件、合同协议条款、合同格式、技术规格、图纸、招标文件及其他参考格式,还必须提供工程清单招标作为参考文件的重要组成部分。

建设单位在招标文件中的工程量清单, 按照国家或地方颁布的规则的计算方法,统一的项目划分, 统一计量单位,统一的工程计算规则按设计图纸加以计算和统计安排,取得名单。数量应遵循的筹备工作客观,公正,科学,合理的原则。编写者必须有一定的知识的工程设计和施工经验, 以及材料与机械施工技术全面的科学知识,为了计算容积的工程无重大遗漏。此基础上,必须符合国家规定的工程计算规则与分包工程处工程单位,并按照设计图纸,设计必不可少的爱情招标文件规定计算量的项目应该有一个综合测试,作品必须简单,虽然不露出现错误定价项目,要保证正确的工程。应该要求的不同等级分开工程部,情况则有所不同, 我们可能有不同的价格,为项目分开。这就要求编写清单编制人员,认真研究设计图纸, 分析招标文件中包括的工作内容及不同的技术要求, 大家熟悉的过程,并到现场认真调查,预计,以使施工的情况下,会对价格项目得以打破。此外, 因为项目清单计算数额的项目是不完整的工程,并考虑利益施工单位,显然付出代价相同的总体价格该工程量清单的数量,实际建设是一个具有实际意义。

在评价和审查的投标应做的单位,个人总报价和综合评估价格不符合要求的个体显示物价符合要求, 与最低总价不能解释单一,价低。投标人往往知道总成

本,以维持相同的情况下, 该计划很可能会改变较小的项目,以降低价格。变化可能较大项目的价格上升,以达到竣工结算工程,将增加为目的。我们也做价格和相应数量的工程技术综合评估的大批量项目注重价格分析。价格会做与工作内容,施工计划,是一个全面的技术评价过程中, 因而倾向于选择施工单位。建设施工阶段的合同成本控制基础。签订严密的施工合同,同时加强施工合同管理,可以保证合同价是合理的, 合法性,减少履行合同的纠纷,维护双方利益的合同,有效地控制了工程投资费用。

在签约前,做好管理合同文件, 合同及补充合同协议。工作往来等单一内容提出了延长合同,并解释完整必须得到维护, 除了建立了技术档案,执行合同的动态分析分析结果采取积极主动的措施。

3.2施工阶段

施工阶段的施工方案,是基于预算或建安工程合同价的目标,控制工程造价。现阶段养护余地小,但可能性是浪费很大。从而控制成本的项目给予足够的重视。

3.2.1 建筑计划

加强技术经济比较施工方案是施工组织设计进行了重新的工作内容,合理的施工方案,缩短建设工期,确保三峡工程质量, 提高经济效率,施工方案正确,从技术和经济评价进行了比较, 通过定性和定量分析,质量,时间,成本三项技术和经济指标,是理智的, 并有效地使用人力,物力和财力,取得较好的经济效益,良好的施工管理人员之间的关系, 全面成本管理是一个重要途径。

3.2.2 严格涉及更改项目预算控制在概算内

施工造成的变化,原因有很多,包括工程设计不良,使工程合同与图纸不符规定;当前市场供应的材料不符合标准规格的设计要求。这些问题已离开初级工程造价的因素。因此,在施工过程中,我们必须加紧海关变化通过任何更改设计,扩大建设规模,提高设计标准,增加建设内容, 最好实行“分级控制,限额签证”制度。有权变更设计,尤其是涉及到成本的设计变更,必须经设计单位, 建设单位现

场代表,监理工程师共同签字,并应提前这种变化,减少损失, 因为已完成或部分完成的项目将进行拆除工作的内容, 这势必造成重大变更损失。因此,建设单位应指派工程造价管理专业人员常驻施工现场,掌握在任何时候控制工程造价的变化。

3.2.3 工程现场签证手续

通过严格控制建设项目的监督制度, 建立专门的部门, 专业人员使用的专业项目管理,以避免项目管理人员只是签证不是经济帐的现象。投资失控造成严重后果,严重改变签证程序,要采取建设,监理方、工地代表共同签名的方式,以确保变更,签证的真实性,合法性, 经济和避免欺诈的现象,由此产生的纠纷。

在施工过程中,建设单位要加强现场施工管理, 督促施工方按图施工,严格控制变更的谈判,代用材料, 现场签证,以及各种预算外额外劳动力成本的必要修改,应做一次后发生变化的及时变化,计算的工作量和费用的情况发生了巨大变化,以把握在任何时候项目的费用水平,以避免积压的工作,真正的工程造价。

施工单位代表到现场监督,做好记录,特别是隐蔽记录和签证, 减少结算及格现象。不少工程现场签证是没有这么严重,给工程带来了非常大的麻烦, 导致相当大的经济损失, 现场签证的严格管理,施工阶段的工程成本控制的关键。

3.2.4 工程量清单,严格审查

对项目的审查清单监理工程师名单的措施来控制工程。工程量清单提供的措施清单,是为了完成建设项目, 发生在施工前和工程施工过程中技术,生活,安全等方面的非工程实体。在这个阶段,因为许多项目都是在施工图及施工现场不完善的招标等到施工招标的工程设计和现场实况,有更好的机会。监理工程师地址收集第一手资料,逐项考核鉴定,不作修改。

3.2.5 控制材料消耗,合理确定材料价格

工程造价控制材料价格的控制是主要的, 材料费在工程中往往占有很大的比重,一般占预算费用的70% 。占直接成本的80%。有必要在施工阶段严格按照

中英文参考文献格式

中文参考文献格式 参考文献(即引文出处)的类型以单字母方式标识: M——专著,C——论文集,N——报纸文章,J——期刊文章,D——学位论文,R——报告,S——标准,P——专利;对于不属于上述的文献类型,采用字母“Z”标识。 参考文献一律置于文末。其格式为: (一)专著 示例 [1] 张志建.严复思想研究[M]. 桂林:广西师范大学出版社,1989. [2] 马克思恩格斯全集:第1卷[M]. 北京:人民出版社,1956. [3] [英]蔼理士.性心理学[M]. 潘光旦译注.北京:商务印书馆,1997. (二)论文集 示例 [1] 伍蠡甫.西方文论选[C]. 上海:上海译文出版社,1979. [2] 别林斯基.论俄国中篇小说和果戈里君的中篇小说[A]. 伍蠡甫.西方文论选:下册[C]. 上海:上海译文出版社,1979. 凡引专著的页码,加圆括号置于文中序号之后。 (三)报纸文章 示例 [1] 李大伦.经济全球化的重要性[N]. 光明日报,1998-12-27,(3) (四)期刊文章 示例 [1] 郭英德.元明文学史观散论[J]. 北京师范大学学报(社会科学版),1995(3). (五)学位论文 示例 [1] 刘伟.汉字不同视觉识别方式的理论和实证研究[D]. 北京:北京师范大学心理系,1998. (六)报告 示例 [1] 白秀水,刘敢,任保平. 西安金融、人才、技术三大要素市场培育与发展研究[R]. 西安:陕西师范大学西北经济发展研究中心,1998. (七)、对论文正文中某一特定内容的进一步解释或补充说明性的注释,置于本页地脚,前面用圈码标识。 参考文献的类型 根据GB3469-83《文献类型与文献载体代码》规定,以单字母标识: M——专著(含古籍中的史、志论著) C——论文集 N——报纸文章 J——期刊文章 D——学位论文 R——研究报告 S——标准 P——专利 A——专著、论文集中的析出文献 Z——其他未说明的文献类型 电子文献类型以双字母作为标识: DB——数据库 CP——计算机程序 EB——电子公告

中英文论文对照格式

英文论文APA格式 英文论文一些格式要求与国内期刊有所不同。从学术的角度讲,它更加严谨和科学,并且方便电子系统检索和存档。 版面格式

表格 表格的题目格式与正文相同,靠左边,位于表格的上部。题目前加Table后跟数字,表示此文的第几个表格。 表格主体居中,边框粗细采用0.5磅;表格内文字采用Times New Roman,10磅。 举例: Table 1. The capitals, assets and revenue in listed banks

图表和图片 图表和图片的题目格式与正文相同,位于图表和图片的下部。题目前加Figure 后跟数字,表示此文的第几个图表。图表及题目都居中。只允许使用黑白图片和表格。 举例: Figure 1. The Trend of Economic Development 注:Figure与Table都不要缩写。 引用格式与参考文献 1. 在论文中的引用采取插入作者、年份和页数方式,如"Doe (2001, p.10) reported that …" or "This在论文中的引用采取作者和年份插入方式,如"Doe (2001, p.10) reported that …" or "This problem has been studied previously (Smith, 1958, pp.20-25)。文中插入的引用应该与文末参考文献相对应。 举例:Frankly speaking, it is just a simulating one made by the government, or a fake competition, directly speaking. (Gao, 2003, p.220). 2. 在文末参考文献中,姓前名后,姓与名之间以逗号分隔;如有两个作者,以and连接;如有三个或三个以上作者,前面的作者以逗号分隔,最后一个作者以and连接。 3. 参考文献中各项目以“点”分隔,最后以“点”结束。 4. 文末参考文献请按照以下格式:

独特的品牌战略【外文翻译】

外文翻译 原文 Strategies for distinctive brands Material Source: Journal of Brand Management Author:Judith Lynne Zaichkowsky ABSTRACT Brand identity complements brand equity and it forms an important part of the strategic management of brands. Identity elements include a well-known brand name, logo, font type, symbols, colour, shape, as well as unique product and benefit descriptions. These different elements can contribute to distinct consumer perceptions of various brands in the marketplace and help to differentiate brands from competitors. Brand managers need to start with a vision of what they want their brand to represent and then use the appropriate identity elements to build the brand. Some brand identity components may be influential to choice at the subconscious level of consumers, and therefore the understanding of individual psychological processes of perception and social meaning is required by brand managers. Keywords: brand equity ; brand identity ; logos ; brand names ; packaging INTRODUCTION Much literature in the area of branding has focused on brand equity and its importance to strong brands. Although everyone agrees that understanding and creating brand equity is essential for marketing, very little academic attention is paid to understanding the importance of brand identity and its relation to brand equity and brand management. Brand identity is the visual picture and meaning derived from the visual impact of the brand. For the consumer to identify brands with their respective manufacturers, the brands must be sold with distinctive features supplied by that particular manufacturer. Strong and unique links to one source is what complements and protects brands from being interchangeable in the marketplace. Brand differentiation, or identity, may be achieved through a well-known brand name, logo, typeface, symbol, colour, shape, distinctive design of the package or product, as well as product benefit descriptions known as unique selling points

工程管理专业毕业设计外文翻译(外文+翻译)

Study on Project Cost Control of Construction Enterprises By: R. Max Wideman Abstract With the increasing maturity of construction market, the competition between construction enterprises is becoming fierce. The project profit is gradually decreasing. It demands that all construction enterprises enhance their cost control, lower costs, improve management efficiency and gain maximal profits. This paper analyses the existing problems on project cost control of Chinese construction enterprises, and proposes some suggestions to improve project cost control system. Key Words :Construction enterprises, Project management, Cost control After joining the WTO, with Chinese construction market becoming integrated, the competition among architectural enterprises is turning more intense. Construction enterprises must continually enhance the overall competitiveness if they want to develop further at home and abroad construction market. Construction Enterprises basically adopt the "project management-centered" model, therefore, it is particularly important to strengthen project cost control. 1.The Current Domestic Project Cost Classification and Control Methods Cost refers to the consumption from producing and selling of certain products, with the performance of various monetary standing for materialized labor and labor-consuming. Direct and indirect costs constitute the total cost, also known as production cost or manufacturing cost. Enterprise product cost is the comprehensive indicator to measure enterprise quality of all aspects. It is not only the fund compensation scale, but also the basis to examine the implementation of cost plan. Besides, it can provide reference for product pricing According to the above-mentioned definition and current domestic cost classification, construction project cost can be divided into direct costs and indirect costs. Direct costs include material cost, personnel cost, construction machinery cost, material transportation cost, temporarily facility cost, engineering cost and other direct cost. Indirect costs mainly result from project management and company's cost-sharing, covering project operating costs (covering the commission of foreign projects), project's management costs (including exchange losses of

中英文论文参考文献标准格式 超详细

超详细中英文论文参考文献标准格式 1、参考文献和注释。按论文中所引用文献或注释编号的顺序列在论文正文之后,参考文献之前。图表或数据必须注明来源和出处。 (参考文献是期刊时,书写格式为: [编号]、作者、文章题目、期刊名(外文可缩写)、年份、卷号、期数、页码。参考文献是图书时,书写格式为: [编号]、作者、书名、出版单位、年份、版次、页码。) 2、附录。包括放在正文内过份冗长的公式推导,以备他人阅读方便所需的辅助性数学工具、重复性数据图表、论文使用的符号意义、单位缩写、程序全文及有关说明等。 参考文献(即引文出处)的类型以单字母方式标识,具体如下: [M]--专著,著作 [C]--论文集(一般指会议发表的论文续集,及一些专题论文集,如《***大学研究生学术论文集》[N]-- 报纸文章 [J]--期刊文章:发表在期刊上的论文,尽管有时我们看到的是从网上下载的(如知网),但它也是发表在期刊上的,你看到的电子期刊仅是其电子版 [D]--学位论文:不区分硕士还是博士论文 [R]--报告:一般在标题中会有"关于****的报告"字样 [S]-- 标准 [P]--专利 [A]--文章:很少用,主要是不属于以上类型的文章 [Z]--对于不属于上述的文献类型,可用字母"Z"标识,但这种情况非常少见 常用的电子文献及载体类型标识: [DB/OL] --联机网上数据(database online) [DB/MT] --磁带数据库(database on magnetic tape) [M/CD] --光盘图书(monograph on CDROM) [CP/DK] --磁盘软件(computer program on disk) [J/OL] --网上期刊(serial online) [EB/OL] --网上电子公告(electronic bulletin board online) 很显然,标识的就是该资源的英文缩写,/前面表示类型,/后面表示资源的载体,如OL表示在线资源 二、参考文献的格式及举例 1.期刊类 【格式】[序号]作者.篇名[J].刊名,出版年份,卷号(期号)起止页码. 【举例】 [1] 周融,任志国,杨尚雷,厉星星.对新形势下毕业设计管理工作的思考与实践[J].电气电子教学学报,2003(6):107-109. [2] 夏鲁惠.高等学校毕业设计(论文)教学情况调研报告[J].高等理科教育,2004(1):46-52. [3] Heider, E.R.& D.C.Oliver. The structure of color space in naming and memory of two languages [J]. Foreign Language Teaching and Research, 1999, (3): 62 67. 2.专著类

建设部文献中英文对照

贯彻落实科学发展观大力发展节能与绿色建筑 (2005年2月23日) 中华人民共和国建设部 节能建筑是按节能设计标准进行设计和建造、使其在使用过程中降低能耗的建筑。 绿色建筑是指为人们提供健康、舒适、安全的居住、工作和活动的空间,同时在建筑全生命周期(物料生产,建筑规划、设计、施工、运营维护及拆除过程)中实现高效率地利用资源(能源、土地、水资源、材料)、最低限度地影响环境的建筑物。绿色建筑也有人称之为生态建筑、可持续建筑。 一、发展节能与绿色建筑的重要意义 建筑作为人工环境,是满足人类物质和精神生活需要的重要组成部分。然而,人类对感官享受的过度追求,以及不加节制的开发与建设,使现代建筑不仅疏离了人与自然的天然联系和交流,也给环境和资源带来了沉重的负担。据统计,人类从自然界所获得的50%以上的物质原料用来建造各类建筑及其附属设施,这些建筑在建造与使用过程中又消耗了全球能源的50%左右;在环境总体污染中,与建筑有关的空气污染、光污染、电磁污染等就占了34%;建筑垃圾则占人类活动产生垃圾总量的40%;在发展中国家,剧增的建筑量还造成侵占土地、破坏生态环境等现象日益严重。中国正处于工业化和城镇化快速发展阶段,要在未来15年保持GDP年均增长7%以上,将面临巨大的资源约束瓶颈和环境恶化压力。严峻的事实告诉我们,中国要走可持续发展道路,发展节能与绿色建筑刻不容缓。 绿色建筑通过科学的整体设计,集成绿色配置、自然通风、自然采光、低能耗围护结构、新能源利用、中水回用、绿色建材和智能控制等高新技术,具有选址规划合理、资源利用高效循环、节能措施综合有效、建筑环境健康舒适、废物排放减量无害、建筑功能灵活适宜等六大特点。它不仅可以满足人们的生理和心理需求,而且能源和资源的消耗最为经济合理,对环境的影响最小。 胡锦涛同志指出:要大力发展节能省地型住宅,全面推广节能技术,制定并强制执行节能、节材、节水标准,按照减量化、再利用、资源化的原则,搞好资源综合利用,实现经济社会的可持续发展。温家宝和曾培炎同志也多次指出,建筑节能不仅是经济问题,而且是重要的战略问题。 发展节能与绿色建筑是建设领域贯彻“三个代表”重要思想和十六大精神,认真落实以人为本,全面、协调、可持续的科学发展观,统筹经济社会发展、人与

工程管理工程造价中英文对照外文翻译文献

中英文资料对照外文翻译 Design phase of the project cost management Abstract Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives. Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy, Even under the WTO and China's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.

中英文参考文献格式

中英文参考文献格式! (細節也很重要啊。。)来源:李菲玥的日志 规范的参考文献格式 一、参考文献的类型 参考文献(即引文出处)的类型以单字母方式标识,具体如下: M——专著C——论文集N——报纸文章J——期刊文章 D——学位论文R——报告S——标准P——专利 A——文章 对于不属于上述的文献类型,采用字母“Z”标识。 常用的电子文献及载体类型标识: [DB/OL]——联机网上数据(database online) [DB/MT]——磁带数据库(database on magnetic tape) [M/CD]——光盘图书(monograph on CD ROM) [CP/DK]——磁盘软件(computer program on disk) [J/OL]——网上期刊(serial online) [EB/OL]——网上电子公告(electronic bulletin board online) 对于英文参考文献,还应注意以下两点: ①作者姓名采用“姓在前名在后”原则,具体格式是:姓,名字的首字母. 如:Malcolm R ichard Cowley 应为:Cowley, M.R.,如果有两位作者,第一位作者方式不变,&之后第二位作者名字的首字母放在前面,姓放在后面,如:Frank Norris 与Irving Gordon应为:Norri s, F. & I.Gordon.; ②书名、报刊名使用斜体字,如:Mastering English Literature,English Weekly。二、参考文献的格式及举例 1.期刊类 【格式】[序号]作者.篇名[J].刊名,出版年份,卷号(期号):起止页码. 【举例】 [1] 周融,任志国,杨尚雷,厉星星.对新形势下毕业设计管理工作的思考与实践[J].电气电子教学学报,2003(6):107-109.

医学文献中英文对照

动脉粥样硬化所导致的心脑血管疾病是目前发病率和死亡率较高的疾病之一。在动脉粥样硬化的形成过程中, 内皮细胞病变是其中极其重要的因素,最显著的变化是动脉内皮功能紊乱, 血管内皮细胞的损伤和功能改变是动脉粥样硬化发生的起始阶段。 Cardiovascular and cerebrovascular disease caused by atherosclerosis is one of diseases with higher mortality and morbidity at present . In the formation of atherosclerosis, the endothelial cell lesion is one of the most important factors, in which, the most significant change is endothelial dysfunction. In addition, the injuries and the changes of vascular endothelial cells are the initial factors of atherosclerosis. 许多因素会导致血管内皮细胞受损, 主要包括脂多糖(Lipopolysaccharides , LPS)、炎症介质、氧自由基等。其中脂多糖因其广泛的生物学作用, 越来越引起研究者的关注。LPS 是一种炎症刺激物, 是革兰阴性杆菌细胞壁的主要组成成分,其通过刺激血管内皮细胞,引起其相关细胞因子和炎性因子的表达紊乱,尤其是Ca2+ 和活性氧簇(Reactive Oxygen Species , ROS的合成和释放发生改变诱导细胞氧化应激内环境紊乱。大量研究表明, LPS 直接参与动脉粥样硬化的形成过程, 特别是动脉粥样硬化血管炎症的初始阶段, LPS可通过直接作用或间接影响的方式激活并损伤内皮细胞,从而引 起血管内皮细胞形态与功能的改变。 Many factors induce vascular endothelial cell damage, including lipopolysaccharides (LPS), inflammatory mediators and oxygen free

品牌营销外文翻译

品牌营销外文翻译文献(文档含中英文对照即英文原文和中文翻译) 译文: 品牌 消费者总有关于产品可用性、质量和可供选择的价格的不完全信息。这样的“不完美的信息”导致他们依靠那些减轻获取产品信息的费用的品牌。由于依靠名牌和伴生的公司名誉,每次购买时,消费者没有搜寻或调查产品就能做出合理的购买。 许多经济学家惊叹这样一个事实:消费者在名牌上投入了如此的信赖。问题是,如同这些经济学家看见的,消费者的信赖给了公司建立超出他们能收取的价格的品牌“市场力量”。因为这些经济学家宣称要“真实地”辨别产品,当公司以独特的名牌、相关的广告和积极的竞争来“区分”他们的产品,他们能够比其他人得到更多。名牌引导消费

者在不同的产品之间进行那些经济学家认为的人为的分别。公司因为品牌而受到尊敬,因此,名牌能使企业在提高价格的情况下而不会失去重大的销售额。 品牌导致消费者经常根据现实世界和“完美的”信息世界之间的比较而付出不必要的多余地的高价,那里同一个行业内的每个公司都承担出售相同的、没有品牌的“同类”产品。这些是在“完善的竞争模型,”作的假定,及有时供经济学家使用的简化的构建。虽然不完美信息是完全自然的和不可避免的。许多经济学家认为完善的竞争的绝佳状态是衡量政策是否理想的评判标准。那是因为在完善的竞争之下公司没有任何力量抬高交易价格。如果公司提高了他们的产品的价格甚至只比市场价格高一分,它都将什么也卖不出去。因此,在完全竞争情况下,消费者不会支付更高一分的价格购买在其他任何地方以更低的价格能买到的相同的产品。毫不奇怪,假定同类产品是理想的,导致以品牌区分产品而减少消费者福利的不正确涵义。那么,反过来,导致由哈佛经济学家爱德华·H 1956年主张的政策——商标不应该被强制执行。 但是,越来越多的经济行业认识到了假定产品是相同的存在着问题。你无法理解由没有下降的品牌效应为其服务的经济目的假定,我们居住在消费者都知晓的完全信息的世界。实际上,消费者没有充分的掌握信息,并且他们也知道他们并没有掌握完全的信息。因此,他们重视公司的名誉——并且他们愿意支付更多在那些一直供应高质量产品、拥有良好声誉的生产商的产品上。通过这种做法,消费者不会不合理行动。他们简单地设法保护自己没有必须用许多时间去学习获得关于各个公

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

英文引用及参考文献格式要求

英文引用及参考文献格式要求 一、参考文献的类型 参考文献(即引文出处)的类型以单字母方式标识,具体如下: M——专著C——论文集N——报纸文章 J——期刊文章D——学位论文R——报告 对于不属于上述的文献类型,采用字母“Z”标识。 对于英文参考文献,还应注意以下两点: ①作者姓名采用“姓在前名在后”原则,具体格式是:姓,名字的首字母.如:MalcolmRichardCowley应为:Cowley,M.R.,如果有两位作者,第一位作者方式不变,&之后第二位作者名字的首字母放在前面,姓放在后面,如:FrankNorris与IrvingGordon应为:Norris,F.&I.Gordon.; ②书名、报刊名使用斜体字,如:MasteringEnglishLiterature,EnglishWeekly。 二、参考文献的格式及举例 1.期刊类 【格式】[序号]作者.篇名[J].刊名,出版年份,卷号(期号):起止页码. 【举例】 [1]王海粟.浅议会计信息披露模式[J].财政研究,2004,21(1):56-58. [2]夏鲁惠.高等学校毕业论文教学情况调研报告[J].高等理科教育,2004(1):46-52. [3]Heider,E.R.&D.C.Oliver.Thestructureofcolorspaceinnamingandmemo ryoftwolanguages[J].ForeignLanguageTeachingandResearch,1999,(3):62–6 7. 2.专著类 【格式】[序号]作者.书名[M].出版地:出版社,出版年份:起止页码. 【举例】[4]葛家澍,林志军.现代西方财务会计理论[M].厦门:厦门大学出版社,2001:42. [5]Gill,R.MasteringEnglishLiterature[M].London:Macmillan,1985:42-45. 3.报纸类 【格式】[序号]作者.篇名[N].报纸名,出版日期(版次). 【举例】 [6]李大伦.经济全球化的重要性[N].光明日报,1998-12-27(3). [7]French,W.BetweenSilences:AVoicefromChina[N].AtlanticWeekly,198 715(33). 4.论文集 【格式】[序号]作者.篇名[C].出版地:出版者,出版年份:起始页码. 【举例】 [8]伍蠡甫.西方文论选[C].上海:上海译文出版社,1979:12-17. [9]Spivak,G.“CantheSubalternSpeak?”[A].InC.Nelson&L.Grossberg(e ds.).VictoryinLimbo:Imigism[C].Urbana:UniversityofIllinoisPress,1988, pp.271-313.

平面设计中英文对照外文翻译文献

(文档含英文原文和中文翻译) 中英文翻译 平面设计 任何时期平面设计可以参照一些艺术和专业学科侧重于视觉传达和介绍。采用多种方式相结合,创造和符号,图像和语句创建一个代表性的想法和信息。平面设计师可以使用印刷,视觉艺术和排版技术产生的最终结果。平面设计常常提到的进程,其中沟通是创造和产品设计。 共同使用的平面设计包括杂志,广告,产品包装和网页设计。例如,可能包括产品包装的标志或其他艺术作品,举办文字和纯粹的设计元素,如形状和颜色统一件。组成的一个最重要的特点,尤其是平面设计在使用前现有材料或不同的元素。 平面设计涵盖了人类历史上诸多领域,在此漫长的历史和在相对最近爆炸视觉传达中的第20和21世纪,人们有时是模糊的区别和重叠的广告艺术,平面设计和美术。毕竟,他们有着许多相同的内容,理论,原则,做法和语言,有时同样的客人或客户。广告艺术的最终目标是出售的商品和服务。在平面

设计,“其实质是使以信息,形成以思想,言论和感觉的经验”。 在唐朝( 618-906 )之间的第4和第7世纪的木块被切断打印纺织品和后重现佛典。阿藏印在868是已知最早的印刷书籍。 在19世纪后期欧洲,尤其是在英国,平面设计开始以独立的运动从美术中分离出来。蒙德里安称为父亲的图形设计。他是一个很好的艺术家,但是他在现代广告中利用现代电网系统在广告、印刷和网络布局网格。 于1849年,在大不列颠亨利科尔成为的主要力量之一在设计教育界,该国政府通告设计在杂志设计和制造的重要性。他组织了大型的展览作为庆祝现代工业技术和维多利亚式的设计。 从1892年至1896年威廉?莫里斯凯尔姆斯科特出版社出版的书籍的一些最重要的平面设计产品和工艺美术运动,并提出了一个非常赚钱的商机就是出版伟大文本论的图书并以高价出售给富人。莫里斯证明了市场的存在使平面设计在他们自己拥有的权利,并帮助开拓者从生产和美术分离设计。这历史相对论是,然而,重要的,因为它为第一次重大的反应对于十九世纪的陈旧的平面设计。莫里斯的工作,以及与其他私营新闻运动,直接影响新艺术风格和间接负责20世纪初非专业性平面设计的事态发展。 谁创造了最初的“平面设计”似乎存在争议。这被归因于英国的设计师和大学教授Richard Guyatt,但另一消息来源于20世纪初美国图书设计师William Addison Dwiggins。 伦敦地铁的标志设计是爱德华约翰斯顿于1916年设计的一个经典的现代而且使用了系统字体设计。 在20世纪20年代,苏联的建构主义应用于“智能生产”在不同领域的生产。个性化的运动艺术在俄罗斯大革命是没有价值的,从而走向以创造物体的功利为目的。他们设计的建筑、剧院集、海报、面料、服装、家具、徽标、菜单等。 Jan Tschichold 在他的1928年书中编纂了新的现代印刷原则,他后来否认他在这本书的法西斯主义哲学主张,但它仍然是非常有影响力。 Tschichold ,包豪斯印刷专家如赫伯特拜耳和拉斯洛莫霍伊一纳吉,和El Lissitzky 是平面设计之父都被我们今天所知。 他们首创的生产技术和文体设备,主要用于整个二十世纪。随后的几年看到平面设计在现代风格获得广泛的接受和应用。第二次世界大战结束后,美国经济的建立更需要平面设计,主要是广告和包装等。移居国外的德国包豪斯设计学院于1937年到芝加哥带来了“大规模生产”极简到美国;引发野火的“现代”建筑和设计。值得注意的名称世纪中叶现代设计包括阿德里安Frutiger ,设计师和Frutiger字体大学;保兰德,从20世纪30年代后期,直到他去世于1996年,采取的原则和适用包豪斯他们受欢迎的广告和标志设计,帮助创造一个独特的办法,美国的欧洲简约而成为一个主要的先驱。平面设计称为企业形象;约瑟夫米勒,罗克曼,设计的海报严重尚未获取1950年代和1960年代时代典型。 从道路标志到技术图表,从备忘录到参考手册,增强了平面设计的知识转让。可读性增强了文字的视觉效果。 设计还可以通过理念或有效的视觉传播帮助销售产品。将它应用到产品和公司识别系统的要素像标志、颜色和文字。连同这些被定义为品牌。品牌已日益成为重要的提供的服务范围,许多平面设计师,企业形象和条件往往是同时交替使用。

品牌营销战略参考文献和英文文献翻译

品牌营销战略参考文献和英文文献翻译 目录外文文献翻译..............................................................................................1 摘要..........................................................................................................1 1. 品牌战略内涵与其功能意义.......................................................................2 2. 我国企业品牌发展概况..............................................................................3 2.1 国内品牌与国外品牌相比存在着很大的差距............................................3 2.2 品牌发展缺乏整体规划. (4) 2.3 产品质量低下品牌个性不足缺乏创新和发展能力.....................................4 2.4 品牌发展策略存在误区. (4) 3. 企业品牌策略选择..................................................................................6 3.1 树立正确的品牌竞争意识着力提高品牌竞争能力......................................6 3.2 搞好品牌定位培养消费者品牌偏好与品牌忠诚.. (6) 3.3 遵循品牌设计规律注重品牌形

工程管理专业建筑项目招投标Building-engineering-bidding毕业论文外文文献翻译及原文

毕业设计(论文)外文文献翻译 文献、资料中文题目:建筑项目招投标 文献、资料英文题目:Building engineering bidding 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

本科毕业设计外文翻译 Building engineering bidding Yang Cao a,*, Shuhua Wang b, Heng Li a aDepartment of Building and Real Estate, Hong Kong Polytechnic University, Hong Kong, China bState Key Laboratory of Novel Software Technology, Nanjing University, Nanjing 210093, China Abstract Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good benefits, have to control their cost and improve management to enhance the capacity of adapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. bidding documents should be well formulated ,which is the improtment to a successful bidding and direct influence the success or failure of the bidding work.Becasue the success or failure of the bidding for the survival and development of enterprise has a direct impact, so we have a high quality, improve the bid documents of the unit, prevent invalid and successful pass mark appear, become a research topic. [key] : bidding drawbacks of unfair competition countermeasures Bidding is a form of project transactions, project bidding process is to determine the successful bidder and the cost of the process and the price of the project, project bidding work of a very important link, do a good job bidding to determine the price, we can effectively control construction costs, and create a fair and equitable market environment, create orderly competition mechanism. Bidding in construction activities, construction enterprises in order to tender invincible works to be successful, And from the contracted projects profitable, it needs to integrate various subjective and objective conditions, the tender research strategy determine tender. Tender