浅谈旧桥桥面加固改造的方法

浅谈旧桥桥面加固改造的方法
浅谈旧桥桥面加固改造的方法

浅谈旧桥桥面加固改造的方法

发表时间:2011-10-26T11:16:19.017Z 来源:《中国科技教育·理论版》2011年第7期供稿作者:王雅辉李广鸽[导读] 随着交通量和重型车辆的增加,桥面铺装的早期损坏已成为影响公路使用功能的发挥和诱发交通事故的原因之一。

王雅辉李广鸽河南省栾川县公路管理局 471500

摘要本文对水泥混凝土桥面开裂原因进行了分析,对设计、施工应注意的几个问题和需要采取的一些预防措施作了论述,以供参考。关键词桥面开裂加固改造

随着交通量和重型车辆的增加,桥面铺装的早期损坏已成为影响公路使用功能的发挥和诱发交通事故的原因之一。这不仅妨碍了正常交通,影响了桥面的美观,更容易造成交通事故,也给维修工作带来了很大困难。有些公路桥通车后不久桥面就发生损坏,严重影响了行车安全和舒适性,以及桥梁的使用寿命。为了使旧桥桥面的加固改造工作顺利开展,应采用行之有效的技术措施,防止一些不切合实际的做法,这就需要认真总结过去旧桥桥面加固的实践经验,认真研究旧桥桥面加固、维修技术,扎扎实实,对症下药。本文对水泥混凝土桥面开裂原因进行了分析,对设计、施工应注意的几个问题和需要采取的一些预防措施作了论述,以供参考。

桥面补强层加固法是在桥面经过一定的处理后使桥面补强层加固,新浇筑的钢筋混凝土补强层与原桥跨结构形成组合结构,从而提高桥梁的承载能力.桥面补强层加固的常用方法有:加铺钢筋网与混凝土;加铺钢筋网与膨胀混凝土;加铺钢筋网与钢纤维混凝上等,其中加铺钢筋网与混凝土最为常用。其特点是;施工简便,经济有效。但在桥面补强的同时,恒载亦有增加,应通过计算判断桥面增厚后是否可以提高桥梁的承载能力。若恒载的增加影响更大,则可考虑采用其他加固方法。同时,为减少补强层增加的恒载,往往必须先将原有桥面铺装层凿除。桥面补强层的作用

公路桥梁的桥面行车道板与铺装层,都直接承受车辆荷载的作用,应力集中显著。加上行车道板计算跨径较小,所受的应力变化和冲击影响也较大。由于桥梁承载能力不开避免地取决于横向分布荷载的能力,而桥面沿宽度分布荷载的能力,取决于纵、横向的相对抗弯刚度和抗扭强度,现有的许多中小跨径旧桥的桥面板一般设计为独立承受部分车辆荷载的构件,且采用小的横隔梁,使之存在固有的强度缺陷。由于横向刚度差,当桥梁超载时,桥面板由于挠曲开裂而首先损坏。另外,对于桥梁的承载能力来说,荷载的位置也是重要的,最佳的分布在荷载对称于纵向中心线。然而,由于横向体系不是无限刚性的,直接位于车辆下的纵向杆件较边杆件承受较大比例的荷载。

桥面板是桥梁的主要构件中承受荷载和应力最大的构件之一,因而也是最早和最易出现破坏的结构。常见的病害有:磨耗、裂缝、漏筋、锈蚀、剥离,严重时出现碎裂、脱落、洞穴和沉陷等。

在旧面板上,或是在凿除了原桥面板铺装层后,重新加铺一层钢筋混凝土补强层,既能修补已出现的裂缝、碎裂等病害,又能增强梁板的抗弯能力,改善铰接梁板的荷载横向分布,从而提高桥梁的承载能力。

桥面补强层加固法的适用性:桥面补强层加固有施工简便、加固效果明显的特点,适用于中、小跨径的梁式和拱式桥,对较大跨径加固效果则不明显,必须与其他加固方法配合使用。另外,在单车道桥梁采用本方法时要封闭交通,或要增设临时便桥;可能使枯面标高增加、引道坡度增大、以及恒载增加,这些都应事先充分考虑到。

桥面补强层加固设计的前提是:补强层能与主梁结合良好,能够形成一个整体而共同受力,因此施工时凿除原有铺装后,在铺筑新铺装层时为保证新老混凝土结合良好,必须在原梁上植筋或埋设锚栓。考虑到新浇混凝土的收缩等原因,新的桥面铺装上必须设置钢筋网。加固设计时还应考虑下列因素肯产生梁底应力的增大:

1、补强层作为新增力的恒载;

2、新、老混凝土引起的收缩差。

桥面补强层加固的常用方法有:

加铺

1、钢筋网与混凝土;

2、钢筋网与膨胀混凝土;

3、钢筋网与钢纤维混凝土等。

采用最多的是钢筋网与混凝土。

施工操作程序

1、凿除旧桥面铺装层,并凿毛接合面;

2、埋设锚固钢筋或螺杆;

3、大梁整体维修处理;

4、接合面表面处理,主要是清扫、干净、涂粘结材料等工作;

5、安装桥面补强钢筋网;

、浇筑混凝土补强层;

7、养生至设计强度后开放交通。

施工措施

桥面补强层加固法能否达到预期效果,关键取决于新旧混凝土能否牢固地形成一个整体。因此,为确保新旧结构共同受力的可靠性和耐久性,需要从施工工艺上采取适当的措施,以提高新旧混凝土的粘结程度。

1、对旧桥面进行凿毛处理,先凿去桥面铺装,然后再凿去部分梁顶面混凝土,使表面粗糙,呈齿状形,箍筋外露,凹槽约2-3cm左右。

2、对结合面进行适当处理,采取清扫、冲洗等措施,并对梁顶病害进行处理。

3、在预埋锚固筋时,先用钢筋探测器探测钢筋混凝土保护层厚度和钢筋位置(以避免钻孔时损坏梁的主筋),一般可按纵横间距为50cm交叉布置,并按计算孔深用电钻钻孔,然后清孔并注入植物胶或化学锚固胶,再埋人膨胀螺栓作为抗剪栓钉。

4、为使新旧混凝土有更好的粘性,在凿毛后的混凝土面上涂抹一层环氧胶液胶结剂或双组份界面剂。

旧桥拆除专项施工方案

旧桥拆除专项施工 方案

南皮向阳桥改建工程 旧 桥 拆 除 方 案

新乡市恒达建筑安装工程有限公司

旧桥拆除专项施工方案 一、编制依据 1.《建筑拆除工程安全技术规范》JGJ147— 2.《安全防范工程技术规范》(GB50348- ) 3. 施工图纸 4. 我单位多年来累积的施工经验 二、旧桥概况 向阳二桥位于沧州市南皮县乡道 CH14-王桥村公路上(路线编码 CH17130927),路线等级四级,桥梁中心桩号 K1+534,桥梁编码 CH17L00 0927,与水流方向自西向东成90°夹角,旧桥为3x10m钢筋混凝土双曲拱桥,重力式墩台,全宽 5.5m,净宽4.5m,沥青混凝土桥面,修建于1975年,桥梁病害较为严重,上部承重构件损坏,评定为四类桥,因此对该桥拆除改建。 三、施工准备 1.踏勘现场,了解建筑物或市政设施拆迁情况,对与工程相突的情况应及时报告建设单位,确定方案。 2.搭设临时设施,编制临时用水用电方案与有关部门联系。 3.根据方案确定交通封路及交通疏导、路线、修筑临时战备道路。

4.经调查施工现场无地下管线。 4.拆桥施工机具、机械进场。 5.施工管理人员进场后,会同各管线单位做好现场的移交工作。 6.做好安全防护,对拆除后产生的可回收旧料做好分类堆放,及时运走。 四、施工方案 1.施工技术措施 经我公司专业人员实地考察,本着确保安全、环保、高效拆除的思想,我公司结合多年的实践经验,认为该桥梁应采用全机械作业方式进行拆除。 2.拆除工程施工工艺框图 施工准备 现场勘查 人员到位设备进场

3.拆除方法 旧桥拆除破碎时先将废弃物排入河道,再用挖机清除。三座桥桥面为现浇砼桥面,桥跨度较小,拟采用挖掘机拆除桥梁,采用液压破碎锤作业对桥面人行道栏、桥面、柱进行破碎,用挖掘机将废弃物挖运。拆除步骤从上而下依次为:护栏、破碎桥面、基础。 桥为钢筋砼,我公司采用破碎拆除法进行拆除,挖机必须随时待

危桥改造工程施工组织设计

危桥改造工程施工组织 设计 标准化管理部编码-[99968T-6889628-J68568-1689N]

娄星区青龙桥危桥改造工程 项目编号:2015-025 施 工 组 织 设 计 编制单位:湖南省新化公路桥梁建设有限公司 时间:二O一五年十一月二十日 施工组织设计目录 第一章总体概述:施工组织总体设想、方案针对性及施工段划分 第二章施工现场平面布置和临时设施、临时道路布置 第三章施工进度计划和各阶段进度的保证措施 第四章各分部分项工程的完整施工方案及质量保证措施

第五章安全文明施工及环境保护措施 第六章项目管理班子的人员配备、素质及管理经验 第七章劳动力、机械设备和材料投入计划 第八章关键施工技术、工艺及工程项目实施的重点、难点和解决方案 第九章冬雨季施工、已有设施、管线的加固、保护等施工措施 第十章新技术、新产品、新工艺、新材料的应用附表: 附表一拟投入本工程的主要施工设备表 附表二拟配备本工程的试验和检测仪器设备表 附表三劳动力计划表 附表四计划开、竣工日期和施工进度网络图 附表五施工总平面图 附表六临时用地表 附表七施工单人员情况一览表 附表八拟委任的项目经理资历表 附表九拟委任的项目总工资历表

第一章总体概述:施工组织总体设想、 方案针对性及施工段划分 第一节工程概况 一、工程项目名称、位置、工程概况 1、项目名称:娄星区青龙桥危桥改造工程。 2、位置:娄星区大埠桥。 3、工程概况:本工程为娄星区青龙桥危桥改造工程,桥梁主桥为2-20m预应力混凝土简支空心板,全桥均位于直线上,无超高及加宽,技术标准如下: 1)设计荷栽:公路-Ⅱ 2)桥面宽、长:7.5m=净-6.5m(行车道)+2*0.5M(防撞栏杆) 全长46.5M 3)地震设防烈度;VI度 4)桥下净空:2.41M,满足排涝要求 5)右交角:90度 二、结构形式 1、上部构造: (1)2*20M米空心板,横向布置5片,共10片。 (2)支座采用圆板式橡胶支座。 (3)桥面在桥台处设两道E-40弹性伸缩缝。桥面铺装15㎝厚C40商品砼。 2、下部构造:

桥梁加宽改建施工指南(1)

桥梁加宽改建 一、基本要求 1、本内容适用于T梁、空心板及小箱梁桥的加宽改建。 2、收集旧桥的设计、竣工资料和地质资料,对全线原有桥梁构造物进行归类分析和现场调查,进行必要的研究、论证,以选择合理可行的施工方案。 3、桥梁的拼接加宽宜采用与原桥同跨径、同结构型式,力求标准化、装配化、外观一致性。 4、在桥梁加宽改建时,应将拟实施的技术方案与施工期的交通组织统筹考虑,做到技术方案与交通组织方案的协调统一,努力实现“施工过程不中断交通”的目标,将施工期对现有交通的影响程度降到最低。 二、上部构造与下部构造均不连接 1、一般规定 (1)下部盖梁和上部梁板新旧结构间采用在连接处设纵向缝完全分离的形式,如图1.1所示,加宽后新旧结构间各自受力、互不影响。

图1.1 上部构造与下部构造均不连接示意(2)加宽桥与原桥各自受力明确、互不影响,减小连接的施工难度,桥墩基础的沉降差异对上部结构的受力影响小。 (3)汽车荷载作用和基础沉降差异,桥梁新旧结构连接处往往会出现纵向裂缝宽度扩大,新旧结构间有明显的挠度差等病害。由造成桥面沥青混凝土铺装破坏,增加后期养生费用;而且由于新旧结构明显的挠度差影响行车舒适性、使行车安全性受损。 2、施工工艺 上部构造与下部构造均不连接施工工艺流程见图2.1。

图2.1 上部构造与下部构造均不连接施工工艺流程 三、上部构造与下部构造均连接 1、一般规定 (1)为使加宽桥与原桥形成完整的整体,减小各种荷载(包括基础不均匀沉降、汽车活载、温度荷载等)作用下新老桥连接处产生过大的变形,减小上、下结构某些部位的内力,上部结构与下部结构均采用连接,如图1.1所示。 (2)将加宽桥梁的上部结构与原桥对应部位横向通过植筋、浇筑湿接缝等方式连接起来,原桥下部结构的桥墩、桥台帽梁及系梁也通过植筋技术将钢筋和加宽部分新桥相应部位钢筋连接,然后浇筑混凝土,将新老桥梁连为一体。

标旧桥拆除专项施工方案

标旧桥拆除专项施工方 案 公司内部档案编码:[OPPTR-OPPT28-OPPTL98-OPPNN08]

旧桥拆除施工方案 一、编制依据 1、施工投标文件 2、《中华人民共和国安全生产法》 3、《建设工程安全生产管理条例》 4、《建筑拆除工程安全技术规范》JGJ147-2004 5、山东省淮河流域重点平原洼地南四湖片(菏泽-巨野)治理工程巨野1标段施工图纸 二、工程概况 本工程位于菏泽市巨野县内,主要建设项目内容为河槽清淤、堤防修筑、桥梁、涵洞改建、扬水站等,具体项目工程施工包括:清淤,复堤,改建涵洞3座,泵站1座,改建桥梁3座。 本次治理范围桩号为0+000-16+140,治理长度为 km,治理后将达到5年一遇除涝,20年一遇防倒漾标准。 改建涵洞3座分别为:高楼北涵洞,黄王庄涵洞,刘楼涵洞;改建谢集泵站;改建桥梁3座,分别为:城角刘桥,南高楼桥,冯楼桥。拆除旧桥3座。三、旧桥拆除施工计划 结合老桥结构特点,我项目部拟采用机凿法施工。机凿法施工必须满足以下几个条件:①桥下容许塌落,老桥下河道无通航需求,且目前水位比较低,无重大洪水隐患;②塌落引起的震动不致对周边环境造成安全级严重噪音影响;③桥梁跨径及肋断面较小,破碎锤可以轻易凿断肋。施工步骤如下:交通封闭 -平衡拆除栏杆和桥面结构 -用破碎锤依次凿断腹和角-继续清理桥台基础。依次达到坍入桥下的目的。整个坍塌过程比较平稳,没有对周边造成任何影响。最后,利用

履带挖掘机在两端道路上对塌落下来的残骸进行清除,用挖掘机或装载机将破碎出的混凝土和砌体装车运至指定的弃土场。 (二)拆桥工期 每个拆桥总工期为4个工作日,桥梁拆除2天,运输2天时间。 四、旧桥拆除前施工准备 (一)旧桥勘察 项目部组织相关人员及有关专家对大桥现状进行勘察,深入了解旧桥的基本概况及结构形式,并对旧桥现状进行评估分析。 (二)道路交通管制及导行 为确保安全,我部在旧桥拆除施工阶段,分别修筑临时道路,共过往行人及车辆,上口宽度为6米,坡度为1:3。在临时道路路口分别设置限行标志及交通导行标牌。 (2)在旧东侧上游用围挡对施工区域进行全封闭围挡,设立警示牌、反光标志。 (3)在旧桥东西两侧各设置一名专职交通引导员对进入施工区域的车辆进行交通引导。 (三)河道封闭 在大桥拆除施工前,项目部与有关部门进行协调。排干河道内明水,对捕鱼者等的一切活动进行疏导、劝退,在距大桥50m拉起警示带,悬挂警示标志。(四)拟投入的机械设备

T梁桥旧桥拆除施工方案

T梁桥旧桥拆除施工方案 1(总4页) -CAL-FENGHAI.-(YICAI)-Company One1 -CAL-本页仅作为文档封面,使用请直接删除

小山二号桥拆除方案 本方案适用于小山电站二号桥旧桥拆除,根据小山电站二号桥施工组织设计,为确保旧桥拆除作业人员安全及河道环境保护,旧桥T 梁拆除作业均采用汽车吊吊装,移位至指定位置进行破碎拆除清理。 主要设备 工艺流程图 吊装作业地点选择在围蔽区域1#桥台区域、地面为道路面、周围作业半径无架空电线和坑穴沟渠。本工程位于县道松湾线K1+450处,施工区域场地宽阔,周围无高压架空线,吊装条件较好。现场吊机的使用,主要为吊装旧桥T 梁构建,构建的平均重量为18t ,施工区域长约100m ,宽约30m ,为吊装的机动灵活性,故选择轮胎汽车吊。 1.工艺流程图 2.

了解老桥的基本概况及各部分构件的工程量,掌握桥梁的结构及受力特点,作为编制拆除方案的基础,了解现场环境的特殊性。 2)测量放样 测量旧桥轴线、用油漆标出每条铰缝位置和墩台位置,并做好相应的标记。 3)拆除桥面系 开工前把桥梁范围内的管线、水管等实地调查清楚,报请业主部门进行处理。采用挖掘机破除钢筋砼护栏及其它附属设施。 4)拆除桥面系铺装砼层 在原桥面上铺有20cm厚砼层,可用挖掘机破碎,人工配合挖掘机清渣,废渣运至弃土场弃置。 5)凿除原钢筋砼层 原旧桥钢筋砼面层有一层钢筋网片粘结,拆除时用挖掘机破碎,若混凝土碎块间有钢筋网连接,用氧焊切除。挖掘机清除混凝土废渣,运至业主指定弃土场弃置。 6)吊车吊除T梁 桥面铺装层废渣清理干净后,在梁面上标出铰缝位置,采用电锤及电镐沿铰缝位置破碎,把每片T梁分离开来。用50吨吊车从外到内逐片把T梁吊到岸边分解区,随即用挖掘机进行破碎分解T 梁。 T梁拆除顺序:从外往内拆除 7)T梁破碎分解及石碴处理 T梁吊运在岸上(在路面围闭作业区域),用挖掘机进行碎破分解,人工用氧焊切割砼块间连接的钢筋,钢筋砼分解成10cm以下的石碴,用装载车运至弃土场弃置。

旧桥改造施工方案(2)

目录 第一章编制依据与原则 (1) 1.1 编制依据 (1) 1.2 编制原则 (1) 第二章工程概况 (2) 2.1 大桥概况. (2) 2.2 工程概况. (2) 2.2.1 加固改造的基本要求如下 (2) 2.2.2 设计技术标准 (3) 2.2.3 项目主要负责人 (3) 2.2.4 主要工程数量表 (3) 2.3 工程特点、重点、难点 (3) 2.3.1 工程特点、重点和难点 (3) 2.4 设备、人员动员周期和设备、人员、材料运到施工现场方法 (3) 第三章桥梁工程施工主要加固改造内容 (4) 3.1 上部构造. (4) 3.2 下部构造. (4) 3.3 基础工程. (4) 3.4 主要人员安排(见表02 表) (5) 第四章主要施工方法和工艺 (6) 4.1 改造加固施工顺序 (6) 4.1.1 陀市桥改造施工之前先进行临时汽车便道的施工,待完成可通车后,再 全封闭陀市桥进行改造施工 (6) 4.1.2 依据设计图纸并结合现场情况进行旧桥拱上建筑、桥台桥墩顶部部分的 拆除。 6 4.1.3 主拱圈施工 (6) 第五章分项工程的施工方案 (16) 5.1 汽车便道施工方案 (16) 5.1.1 工程概况 (16) 5.1.2 便道施工方案 (17) 5.2 悬挂吊架搭设方案 (17) 5.2.1 编制依据 (17) 5.2.2 工程概况 (18) 5.2.3 施工部署 (18) 5.2.4 搭设方案 (19)

5.2.5 搭设流程 (21) 5.3 钢筋制作与安装方案 (21) 连州市G323线城南大桥绿化工程施工组织设计 5.3.1 工程概况 (21) 5.3.2施工部署 (21) 5.3.3施工方法 (22) 5.3.4质量保障措施 (26) 5.3.5 安全保证措施 (26) 5.4植筋方案 (27) 5.4.1 工程概况 (27) 5.4.2施工部署 (28) 5.4.3施工方法 (30) 5.4.4质量保证措施 (32) 5.4.5施工安全措施 (32) 5.5主拱圈砼工程方案 (32) 5.5.1 工程概况 (32) 5.5.2施工部署 (33) 5.5.3施工方法 (35) 5.6其它部位改造施工工序 (36) 5.7质量保障措施 (36) 第六章确保工程安全、质量和工期的保障和措施 (37) 6.1安全组织机构保证 (37) 6.2安全保障体系框图 (38) 6.3安全生产重点注意的事项 (40) 6.4质量目标及管理 (40) 6.4.1建立健全质量保证体系 (40) 6.4.2 提高全员质量意识 (40) 6.4.3狠抓工序质量,确保整体质量 (41) 6.4.4选派具有丰富施工经验的队伍 (41) 6.4.5开展标准化作业 (41) 6.4.6 严格技术标准、切实尊重监理 (42) 6.4.7严把材料关 (42) 6.4.8技术措施 (42) 6.5确保工程质量的措施 (43) 6.5.1为确保上述目标的实现,并创造优良工程,具体拟采取以下管理 措施 (43)

常州三跨简支板梁桥改造工程投标施工组织设计技术交底工程施工建筑组织设计模板安全监理方案实施细则

雪堰镇__桥改造工程 道路桥梁工程施工组织设计 第一章、施工方案说明 一、工程概况 雪堰镇__桥改造工程位于常州市武进区雪堰镇,__桥横跨__河,__河为Ⅶ级航道。主要工程内容:⑴拆除老桥一座;⑵新建桥梁一座; ⑶桥梁两侧接线断了改造。 ㈠、桥梁工程 1、设计荷载:公路-Ⅱ级; 2、桥梁规模:本设计采用三跨简支板梁桥,10+20+10=43m;本桥平面线型处于直线上,纵断面处于R=350m的竖曲线上,桥梁全长43.58m。 3、本桥上部结构采用10m、20m预应力砼空心板梁,下部结构采用柱式桥墩,U型重力式桥台,扩大基础。 4、桥面横坡1.5%由墩台帽调整。 5、桥台采用GYZF4150 ×30mm四氟滑板橡胶支座,桥墩采用GYZ150×28mm(10m)和GYZ2 200×42mm(20m)板式橡胶支座。 6、高程系统:本工程标高系统采用85国家高程基准。 桥梁主要工程数量有: C25砼挡土墙C30砼C40砼C50砼钢筋

M3M M3M3M3吨 142.71645.2139.94139.78146.9238.92 ㈡、道路工程 1、道路等级:乡镇道路; 2、道路结构:20cm 10%灰土,32cm 水泥稳定碎石,乳化沥青下封层,22cm 水泥混凝土。 道路主要工程数量有: 混凝土路面面积 2087平方米 路 面长度 356.7米 二、编制依据 1、雪堰镇__桥改造工程施工招标文件; 2、雪堰镇__桥改造工程施工图; 3、雪堰镇__桥改造工程招标标前会议纪 要及补充通知; 4、国家地方、行业的技术规范及相应的法律、法规; 5、本公司以往施工类似工程的经验及施工力量; 6、《公路桥涵设计通用规范》(JTJ021-89); 7、《公路桥砖石及混凝土桥涵设计规范》(JTJ022-85); 8、《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTJ023-85); 9、《公路桥涵地基与基础设计规范》(JTJ024-85); 10、 其他有关设计、施工规范。 三、施工方案总体说明

(完整版)旧桥维修施工方案

桥梁维修工程) 专项施工方案 编制单位:**建设集团有限公司 编制人: 审核人: 审批人: 编制日期:二〇一四年月 目录 1 ······························································································第一章编制依 据·········· 1 ··········································································

················第二章工程概 况··············· 1 ·······················································································第一节工程概况及地理位置 1 ····················································································第三章施工部 署···················· 1 ···············································································第一节·人员组 织·················· 2 ···························································第二节··················施工准 备····················· 2 ······································第三节···································材料用量计 划··················· 3 ························第四节··············································劳动力需用计划··················· 4 ···········第五节························································主要施工机具计划··················· 4 ···第六节······························································主要施工进度计划·····················4······························································第四章施工工艺、方法和技术························4···························································第一节处理方案··········································· :1. B2桥根据设计提出的桥梁现状病害,桥维修内容如下4··························································桥根据设计提出的桥梁现状病害,桥维修内容如下:2. B65··························································5···················································第二节维修材料及指标··········································混凝土 1.5 ·················································································································································钢材 2.5 ·····················································································································································浆砌片石 3.5 ·············································································································································.注入水泥原浆 45 ···································································································································.垫层砾(碎石)55·······························································································································5······················································第三节施工工艺、方法和技术要求························ .墩台基础处理 5 ····································································································1 ·······························.墩台身处理 7 ···················································································2 ····················································.上部结构8·························································································

旧桥拆除安全专项施工方案

旧桥拆除安全专项施工方案 一、工程概况1、于沟西桥(K165+588.7)设计拆除老桥,新建4*13M预应力砼空心板桥,90°,桥面宽度为净15+2*0.5M,灌注桩基础,柱式墩台;双山中桥(K162+637.3)为5*13M钢筋砼空心板桥,110°,上流庄桥(K171+144.2) 为7*13M钢筋砼空心板桥,90°;本次设计拆除老桥上部结构,更换13M预应力砼空心板新板,重做铺装、护栏、伸缩缝、支座垫石等。本方案适用于以上于沟西中桥的全桥拆除及双山中桥和上流庄桥的桥板拆除工程。2、老桥拆除工程特点(1)本工程有一座老桥整体拆除及两座桥梁的桥板拆除,拆除过程中如何组织好施工顺序是本施工方案必须详细周密考虑的核心问题,也是老桥能否按期完成拆除的关键问题所在。(2)拆桥期间桥下水道必须维持正常行洪,在施工过程中要尽量减少对桥下水路的影响。(3)由于这几座桥均处于路线中段,两岸居民往来频繁,拆桥前要首先修好便道或确定绕行路线,并在两端设置完善的施工标志,保证过往车辆安全通行。二、施工组织机构及资源配置1、施工拆除项目组织机构设置根据工程特点、施工内容、工期要求,本着强化现场施工管理,确保拆除工作高效、快速、安全完成的目的,组建以施工负责人为首的拆除施工队,组织、指挥、协调各工种作业的各项事宜。施工队将根据工期安排、实时进度、周边环境变化等因素,实行动态管理、随时调剂。2、施工组织机构技术负责人: ***施工负责人:***专职安全员:***技术工:6人壮工:50人3、施工准备工作(1)技术准

备技术准备分为内业技术准备工作和外业技术准备工作。本工程内业技术准备工作主要包括:a、认真阅读原桥设计图纸,学习施工规范;b、编写实施性施工方案;c、备齐必要的参考资料;d、对施工人员进行上岗前的技术和安全培训。外业技术准备工作主要包括;a、现场详细调查与地质、水文踏勘;b、确定有关保证河道畅通的施工方案;c、调查现场有关地下电缆、房屋、树木等情况,做好施工前期准备工作。(2)临时设施布置施工现场总体规划布置原则:布置合理,节省投资,减少用地,因地制宜,就地取材,方便施工,尽量利用原有设施。(3)施工用电尽量利用周围电网接入。 三、主要施工方案及施工组织安排1、主要拆除方法:为确保桥梁拆除过程中的安全,拆除时不能按常规实施控爆拆除,故确定采用综合拆除法,即利用机械、人工相结合施工技术,由上至下对桥进行解体拆除。2、拆除总体作业顺序(1)、护栏拆除:对桥面上的附属工程项目,主要以人工使用风镐配合小型混凝土破碎机由中间向两端依次将老桥护栏拆除并清运出场。(2)、桥面铺装及填料拆除:这部分拆除以小型机械为主,人工风镐配合将绞缝混凝土钢筋凿除、切断,将废渣运至指定区域。(3)、桥板拆除:待桥面铺装拆除完毕后,即可拆除桥板。利用机械将桥板破碎,将碎料及时挖运出现场。施工时注意在各区段同时对称作业,确保老桥各部分受力均匀。(4)、下部结构拆除:由于河中水位较浅,墩台的拆除可直接使用破碎机进入河道中墩台处实施凿除作业,碎渣再用挖掘机、自卸车清除出河道,破碎时由

旧桥改造施工方案

一、工程简介因xxx年xx路桥梁维修改造工程K268+400xx中桥工程是上世纪末修建的,各种原因,现已对行车安全带来极大隐患,极易发生重大险情,根据省厅意见,公路管理处及时提出对其进行改造加固,以确保国省干线公路行车顺适、在xx 安全。二、主要设计要求桥面板混凝土重新做桥面铺装,并更换伸缩缝,本工程需要更换中行道板,抗裂纤维混凝防水砼,伸缩缝混凝土采用 C50C40,桥面铺装采用C40强度等级护撞护栏)。米土,伸缩缝采用GQF-C2(60)型伸缩缝。桥面宽度为净12+2×0.5(三、主要工程量33伸缩本工程主要工程量:现浇混凝土桥面板65.1 m;;桥面铺装94.64 m 道。缝2 四、分项工程施工顺序.分项工程施工顺序1 根椐本工程特点具体施工顺序如下:钢筋制安 浇筑桥面板安装桥面板模板旧桥板拆除 桥面铺装施工伸缩缝安装。 2.全桥主要项目施工工艺流程图如下: 施工准备 旧桥面板拆除 桥面板施工 桥面铺装

伸缩缝安装 竣工验收 五、进度计划安排 1.施工准备及临时设施建设: 安排5天,占用计划工期5天。 2.老桥拆除: 安排10天,占用计划工期10天。 3.桥面板施工 安排16天,占用计划工期16天 4.桥面铺装及附属工程: 按排17天,占用计划工期17天。 5.竣工清场: 按排2天,占用计划工期2天。 详见分项工程施工进度计划横道图 天。50综上所述,完成整个工程需工期 详见分项工程施工进度计划横道图 六、项目经理部组织机构设置 为优质按期完成该桥梁的施工任务,我们将以有水平、有能力、有建造同类桥梁实际经验的领导及施工人员充实进来,组成以项目经理牵头的领导组织机构,对该工程质量、安全、工期进行总体安排及控制。 项目经理部拟设项目经理1人,技术负责1人,项目部内设计划财务、物资设备、技术测量、质量安全、试验专职认人员。 七、主要项目施工方案及施工顺序 (一)、施工测量 高程控制:对老桥桥梁中心标高进行引测,并假设其标高值(+13.0米),新建桥梁中心标高按埋设点假设标高进行推算放样,埋设点在桥梁附近埋设不少于2点,在施工中经常复核确保无误。测量结果包监理工程师审核无误后方可使用。(二)、桥面板施工 1.本次共需拆除原混凝土桥面板中板8块,边板1块,拆除时应注意对原有下部结构进行保护,如对原下部结构造成损坏,应报监理工程师检查,并制定修补措施进行修补。因原设计采用预制桥面板,因工期原因,申请变更为现浇桥面板,故应在接到驻地监理工程师便更令后,方可进行现浇桥面板施工。 2.施工顺序:①安装橡胶支座。②支设模板。③钢筋制作安装。④混凝土浇注。 ⑤养护 3.施工方法: ①.现浇桥面板施工采用吊模施工,底模采用樟松板(厚4cm),下设10*15cm 方木,间距80cm,上铺多层板,桥面上部采用20cm槽钢,间距80cm,用Φ25

重力式U型桥台危桥改造工程施工组织设计

六、施工组织设计 工程概况 1、工程名称:2012年安费塘桥及万岗桥危桥改造工程 2、建设内容:安费塘桥位于长丰县下塘镇境内合岗路大房郢水库路段。本次改造将原有老桥拆除,新建一座两跨13m的梁板桥,桥梁设计全长34.4m,桥梁宽8.5m,桥台采用重力式U型桥台,明挖扩大基础;上部设混凝土防撞护栏,并在两侧道路加设警示桩等。万岗东桥位于长丰县境内,老桥为一跨6m石拱桥,矢跨比为12,全宽4.6m,净宽3.3m,本次维修加固为要桥面增防撞护栏,并在两侧道路加设警示桩等。预算投资约140万。 3、工程地点:长丰县境内; 4、计划工期:合同工期为180个日历天; 5、质量要求:合格。 第一章、各分部分项工程施工方案与技术措施 第一节施工测量 一、总体测量工作程序 测点交接→测点复测→建立施工导线网→布置水准控制点→测定桥梁中线→局部放样。 二、原测量控制网(点)的复测 开工前对建设、设计单位移交的平面控制点和高程控制点,按原测设的网型和等级,并按《工程测量规范》GB的有关技术要求进行复测。复测和计算成果符合精度要求后,报监理工程师认可,其点位才能使用。 三、控制系统的建立 针对本标工程的特点,建立现场平面及高程控制系统,以便于在施工全过程中进行测量的控制。 (1) 平面控制系统 拟采用导线测量的方法建立等级为一级的平面控制系统,即方位角闭合差10为测定系数,测距相对中误差≤130000,系统布设时,以业主提供的控制点为导线起始方向,沿本工程外围布设一环形闭合导线,并联测业主提供的控制点。导线点的埋设规格采用GB《工程测量规范》附录的金属标志图设置。导线点的位置应通视条件良好,间距50~

旧桥拆除施工方案要点

旧桥拆除施工方案要点 xx〔2016〕7号签发人:xx 关于上报桥梁拆除专项施工方案的报告 xx二路驻地监理处: 我部溢洪河桥、六干排桥拆除专项施工方案已制定完成~现报予贵处~请予审批。 附件:溢洪河桥、六干排桥拆除专项施工方案 2016年5月10日 东二路北外环路口至北二路路口段改建工程项目经理部 2016年5月10日印发 xx4份 1 旧桥拆除施工方案 一、工程概况: 在本次拆除工程中拆除2座桥梁,分别是K5+804.0溢洪河桥和K8+048.8六干排桥。溢洪河桥为3孔10米,桥梁全长30米,桥宽为16.3米,上部结构为10m钢筋混凝土空心板,下部结构采用柱式墩台、桩基础。六干排桥为5孔8米,桥梁全长40米,桥宽为14.5米,上部结构为8m钢筋混凝土空心板,下部结构采用柱式墩台、桩基础;桥面铺装为钢筋混凝土,桥面附属构造物包括防撞护栏等。施工时我单位选择长年从事建筑物拆除施工的专业施工队伍,通过对旧桥现场考查,制订安全合理施工方案。计划工期:2016年5月14日-2016年5月22日。 二、施工前期准备

现况2座旧桥均位于改建的东二路上,桥梁拆除的初步顺序为:溢洪河旧桥——六干排旧桥,根据现场实际情况可调整机械设备。拆除施工时将桥两端施工现场用围挡彻底封闭,外围所有通行路口均采用彩钢板围挡封闭,安排专人进行看护,并设置醒目禁行标志,禁止车辆及行人通行,严禁非施工人员进入施工现场;拆除施工前熟悉周围现场、探明地下各种管线和构筑物,避免在拆除施工中破坏地下不明管线或其它构筑物。 施工顺序:交通便桥预留在桥梁东侧,综合考虑首先对旧桥西半幅拆除,此次拆除宽度约10米(旧桥总宽16米),东半幅部分6米采用搭设架杆做安全防护,桥梁南北通长40米(桥长32米),扶手上贴反光条,并设置安全网,临时保证非机动车辆及行人通行。预拆除的部分,桥头两侧采用围挡封堵。待东侧交通便桥完成后,桥梁全面封堵,对桥梁整体拆除。 1、成立施工安全管理领导小组,安全责任落实到人; 组长:xx 副组长:xx 小组成员:xx、xx乃文、xx、xx 2、为确保施工的顺利进行、认真做好技术准备工作,熟悉施工现场,组织施工人员进行安全教育和施工技术交底; 3、根据现场实际勘查情况及要求,准备施工机械设备、材料,明确施工需要的场地和机械设备及被拆除物的倒运地点; 4、建立健全施工现场的各项管理规章制度和安全技术措施。 2 三、施工方法及顺序 结合现场实际情况,板桥拆除拟采用人工配合机械的方法施工(施工用机械附后)。经分析其结构,按拆除顺序如下方案:

旧桥拆除专项施工方案

南皮向阳桥改建工程 旧 桥 拆 除 方 案 新乡市恒达建筑安装工程有限公司

旧桥拆除专项施工方案 一、编制依据 1. 《建筑拆除工程安全技术规范》JGJ147—2004 2. 《安全防范工程技术规范》(GB50348-2004 3. 施工图纸 4. 我单位多年来累积的施工经验 二、旧桥概况 °夹角,旧桥为3x10m钢筋混凝土双曲拱桥,重力式墩台,全宽5.5m,净宽4.5m,沥青混凝土桥面,修建于1975年,桥梁病害较为严重,上部承重构件损坏,评定为四类桥,因此对该桥拆除改建。 三、施工准备 1. 踏勘现场,了解建筑物或市政设施拆迁情况,对与工程相突的情况应及时报告建设单位,确定方案。 2. 搭设临时设施,编制临时用水用电方案与有关部门联系。 3. 根据方案确定交通封路及交通疏导、路线、修筑临时战备道路。 4. 经调查施工现场无地下管线。 4.拆桥施工机具、机械进场。 5. 施工管理人员进场后,会同各管线单位做好现场的移交工作

6?做好安全防护,对拆除后产生的可回收旧料做好分类堆放, 及时 四、施工方案 1. 施工技术措施 经我公司专业人员实地考察,本着确保安全、环保、高效拆除的 思想, 我公司结合多年的实践经验,认为该桥梁应采用全机械作业方 式进行拆除。 2. 拆除工程施工工艺框图 施工准备 3. 拆除方法 旧桥拆除破碎时先将废弃物排入河道,再用挖机清除。三座桥桥 面为现浇砼桥面,,桥跨度较小,拟采用挖掘机拆除桥梁,采用液压破 碎锤作业对桥面人行道栏、|桥面、柱进行破碎,用挖掘机将废弃物挖 人员到 位 桥为钢筋砼 我公司采用破碎拆除法进行拆除 ,挖机必须随时待 机拆除, 不会产生大的震动,也不会产生大的噪声,对周围的建筑物、 构筑物不会有任何影响。 设备进场 运。拆除步骤从上而下依次为:护栏、破碎桥面、基础 命,将堵塞河道的废弃物挖组废施工确保拆除物不将河面堵塞 ,保证 河水畅流。

危桥改造施工方案

危桥改造施工方案、方法与技术措施 一、施工准备 1、生产准备 (1)清除工程范围内的所有障碍物; (2)修筑临时施工便道; (3)按施工总平面布置图位置修筑临时设施,安装施工及生活用水、用电管线并试通; (4)按材料进场计划备料并运至施工现场。 2、技术准备 (1)认真进行施工图纸阅读、审查,参加设计交底和图纸会审,开工前澄清施工图中所有疑问。 (2)组织有关人员熟悉与本工程有关的施工及验收规范、质量检验评定标准等规范性文件。 (3)编制施工组织设计及作业设计,按施工组织设计及作业设计要求,组织所有施工人员进行学习,对专业人员进行技术培训。 (4)按现场条件做好座标平面控制桩及引测适用的临时水准点,按设计要求进行工程轴线放样。 测量放样: 1、控制点的测设 对勘测设计部门的测量交底进行复核,复核结果经监理复核认可后方可使用。根据业主所交的导线桩按照施工需要加密控制网,为了保证控制网的可信性,将根据现场条件把控制点都选定在施工作业范围外地势较高处,做到各控制点通视性良好,符合施工需要。控制点选定后,经过实测和导线闭合的平差计算把整个工程范围内的控制点坐标定下来。控制网采用经纬仪测设。 2、中心线、轴线的测量:以道路中心为基准测放出桥梁的中心线,以设计图纸提供的桥墩、桥台位置有经纬仪放出精确的墩、台中心线位置并以设计图纸提供的相交角度用经纬仪测放出墩、台立柱、盖梁的横轴线。在桥位两侧布置墩、台轴线控制点,在设定控制时要充分考虑施工对场地的需要,把控制点布置在不

影响施工的地方,桥位两侧各布置2点,并用砼护桩。注意相邻桥台位置和距离的校核和斜交角方向核对,相邻桥台距离精度确保±5mm并记录下控制点之间的距离及点到桥位点的距离。桥台纵横轴线测设完毕后经现场监理复核认可后方可使用。丈量跨度和预制梁的钢尺均需经过校核鉴定。 ①桩基测量放样:根据墩、台纵横轴线用钢尺测设四根边角桩位,并用钢尺复核这四根桩的相对位置无误后,根据这四个点用钢尺测设其他桩位。 ②墩、台测量放样:根据桩基轴线测设墩、台纵横轴线。纵横轴线用红色三角标注在已浇制完毕的承台上。 ③台帽盖梁测量放样:台帽盖梁是控制跨径和桥面标高的重要项目,因此盖梁测设时必须确保精度。具体测设时可根据桥台纵横轴线测设,并丈量跨径以确保架梁位置。 ④梁位置的测量: 根据施工图,首先测设桥梁纵横轴线和桥台横轴线,然后按照纵横轴线划出梁位,并测出跨径。 ⑤桥面系的测量: 采用坐标法和常规测设方法相结合的手段来测设。首先根据主线平面线型要素表用坐标法测设要素点位置(中线和边线),即测设直线和曲线的起讫点。然后用常规测设方法根据要素点位置,按照施工需要测设线上各点,直线用通视法,曲线用偏角法。 3、临时水准点的测量 根据勘测设计部门提供的国家水准点进行施工用临时水准点的设置,临时水准点的设置距离以测高不加转点原则,一般不大于200m。临时水准点必须与设计水准点复测闭合,其允许闭合差控制在±20√Lmm(L为水准线长度公里数)。另我临进水准点必须设置在施工范围以外,不受施工影响的位置,并应坚固稳定,同时每隔一定时间对其进行复核,以免由于临时水准点的升降而影响施工质量。 4、标高测量 标高测量均采用自动整平水准仪进行操作。 1)根据施工图纸计算和测设桥台标高,桥面标高。 2)桥面铺装、栏杆标高测设必须按照断面图,横断面图来进行放样,必须

老桥拆除施工方案

G104滁州至汊河段改建一级公路工程三期 老 桥 拆 除 施 工 方 案 编制_____ 审核_____ 合肥公路桥梁有限责任公司滁州至汊 河段改建工程G104三期五标段项目部 日期:

第一章编制说明 一、本桥拆除方案编制依据 1 施工招标文件及承包合同书; 2公路桥涵施工技术规范; 3 公路桥涵设计技术规范; 二、编制说明: 1 本方案编制时经项目部、公司有关部门讨论通过,经监理工程师和业主组织专家审查通过后,方能予以实施; 2 本方案通过后由合肥公路桥梁有限责任公司滁州至 汊河段改建工程G104三期五标项目经理部负责实施。 第二章西阳桥、二道河桥老桥概况 一、老桥概况: 西阳桥位于G104国道K4+665段,全长86m,桥型为四孔20mT梁的西阳桥,桥面纵坡0.2%,桥面行车道宽14m,人行道宽2*0.5m,桥面总宽15m,设计荷载等级为公路—Ⅱ级;地震烈度:桥位区地震动峰加速值为0.05g;护栏:防撞护栏。二道河桥位于G104国道K6+793段,全长54m,桥型为双孔24m空腹圬工拱的二道河桥,桥面纵坡为0.2%,桥面行车道宽14m,人行道宽2*0.5m,桥面总宽15m,设计荷载等级为公路—Ⅱ级;地震烈度:桥位区地震动峰加速值为0.05g;护栏:防撞护栏,左幅挑梁自来水管道通过。因工程建设需要,需将老桥拆除。

二、西阳桥、二道河桥老桥现状: 经现场调查,老桥存在以下几个问题: 1 沿线桥梁建设年代久远,混凝土碳化侵蚀严重,部分梁板混凝土脱落,钢筋保护层、混凝土强度等均无法确定,基础工程地质情况不清楚。且老桥及加宽后桥梁建设年代相差较远,结构耐久性存在差异。 2 原有桥梁设计荷载(公路二级)等级较低,满足不了此次设计荷载等级要求。 3 此次调查范围内大多数桥梁未设置伸缩缝,导致梁端处前面铺装出现横向裂缝;桥面排水基本瘫痪,排水不畅。 4 二道河桥桥台出现鼔凸现象,重要部件主拱圈存在较大错台。 5 梁端头渗水严重,跨中部分混凝土开裂、缺损和露筋且锈蚀比较严重;原有拱桥拱脚开裂,且渗水严重,存在安全隐患。 6 西阳桥右幅最外侧T梁的肋板砼老化剥落严重,影响桥梁安全,且桥台和桥墩右幅的帽梁砼老化剥落露筋严重。 三、竣工图纸审阅 项目部组织拆桥有关人员进行老桥竣工图会审,认真阅图,了解老桥的基本概况及各部分构件的工程量,掌握桥梁的结构及受力特点。 四、施工前期准备

旧桥护栏改造方案

云南某地旧桥护栏改造方案 忠 旺 灯 光 护 栏 目录: 一、前言 二、改造概述 三、设计方案 四、质量检测

云南某地旧桥护栏改造方案 一、前言 对于桥梁护栏,如果一成不变,没有任何美化,那么就不能与自然景观和人文景观相协调,所以,在满足安全使用的条件下,我们可以对桥梁护栏进行美化,要需要注意些什么呢? (一)美化时,需要充分考虑桥梁护栏的通透性,因为从公路内部景观的角度来看,车内驾驶人员所看到的是连续移动的景观,包括桥梁护栏的形状和色彩,而不是细部结构,那么就要求桥梁护栏具有良好的通透性,以便与周围的景色相协调。 (二)美化桥梁护栏要采用与人有亲和力的设计和材料,对可能与车辆或行人接触的部分要妥善处理,避免对人造成伤害。另外,桥梁护栏美化要降低刚度桥梁护栏的存在感,通过采用组合式桥梁护栏,种植藤类植物,来遮盖砼墙和降低砼桥梁护栏表面的亮度等措施,那么就可以降低刚性桥梁护栏对行车造成的压抑感。

二、改造概述 工程概述 XX桥两侧栏杆为钢筋混凝土栏杆,由我公司负责将钢筋混凝土栏杆更换为金属栏杆,增加灯光效果,美化桥梁护栏外观。 经过现场实际调查,原有防护栏杆总长度约126m,栏杆高1.2m,防护栏杆为C30钢筋砼结构。 二、设计方案 根据业主要求现设计方案如下图 效果图如下:

三(一)施工方案 1.栏杆拆除 1.1栏杆拆除 栏杆拆除主要内容为立柱、栏板及踢脚钢筋混凝土的拆除。 防护栏杆采用人工拆除的,确保既有桥梁的结构及稳定性不受破坏。防护栏杆采取分段凿除、分段清理的方式进行拆除。 按照先栏板后立柱、最后踢脚的顺序逐节分段拆除,钢筋混凝土利用电锤配合风镐人工破碎,钢筋采用手持式切割机割除。破碎后的混凝土块及残渣分段集中、人工装车。 1.2植栓面清理 对要植栓的断面按施工缝处理,对作业面进行浮渣清理,并用清水冲洗。 2.栏杆安装 2.1预埋件施工 预埋件安装施工顺序为:定位放线→钻孔→清孔→注胶、植栓→固化、保护→拉拔力试验→预埋钢板安装。 (1)定位放线

木桥改造方案

团泊光合谷湿地木桥改造 施 工 方 案 天津金盛威市政工程有限公司 2013年12月6日

目录 一、工程概况 (1) 二、施工方法及步骤 (1) 三、施工要点 (2) 四、安全文明施工 (4)

团泊光合谷湿地木桥改造方案 一、工程概况 本工程位于团泊光合谷湿地接待中心附近,因通航需要,经研究决定需对湿地接待中心附近木桥进行通航改造。桥梁改造后为推拉式,原木桥全部采用木质结构,推拉桥结构全部采用钢结构,上方铺设防腐木板。 二、施工方法及步骤 本工程采用推拉式桥梁设计,在原桥中间位置拆除4米长的桥面及相应桥墩(图1),清淤至符合通航条件,在桥面前半部铺设轨道,其上安装推拉钢结构平台,当平台开启时通航船只(图2),当平台与另一侧桥面闭合时通过行人(图3)。 (图1)需拆除位置 (图2)推拉桥敞开状态

(图3)推拉桥闭合状态 三、施工要点 1、材料准备 本工程所需钢材及构件均符合国家质量标准,材料通过货比三家的原则进行采购。 2、钢结构制作及安装 钢结构平台采用镀锌方管进行焊接,前半部为60镀锌方管焊接的钢桁架结构,长度为4.5米,后半部为80镀锌方管焊接结构,长度为5.5米,面层满铺防腐木板。(如图)

3、桥面轨道铺设及试运行 轨道安装:本工程采用8号国标轨道,轨道镶嵌在150槽钢中,并与槽钢进行焊接固定,槽钢放置在桥面两侧,且与桥面木板下方设置的槽钢用钢板进行连接。在轨道两端各设置一道限位器,防止行走过程中脱离轨道;当桥面闭合或者敞开时,推拉平台通过设在两端的铁销与原桥面连接固定,以防止在通行过程中出现晃动或位移。 试运行:当轨道铺装完成后,推拉桥面放置在轨道上进行试运行,如出现问题应及时拟定方案进行解决,如没有问题发生则对原桥面进行下一步拆除作业。 4、原桥桥面拆除及加固 首先划定拆除范围,在拆除过程中禁止一切车辆及行人通过,对桥上的设施进行逐个拆除,当拆除过程中桥梁出现隐患时应立即停止拆除,待确定隐患排除后再进行后续作业。 当划定的范围拆除完成后应对拆除后两端端头进行加固,之后再对航道进行清淤。