题目: 浅基础形式对工程造价的影响

-以某具体工程为例

姓名: 张延龙

学院: 工学院

专业: 工程管理

班级: 工程管理84

学号: 3148412

指导教师: 赵吉坤职称: 副教授

2012年3 月6 日

南京农业大学教务处制

浅基础形式对工程造价的影响

-以某具体工程为例

作者:张延龙指导老师:赵吉坤

摘要:本文着重介绍在相同地质情况下,满足强度要求的不同基础类型的力学性能分析,即符合基础设计的原则又能在经济上合理。以某具体工程为例,根据勘测资料,选择两种基础形式,进行基础承载力,沉降量计算及工程量计算,采用江苏定额,最后从价值工程等方面研究建造成本,最终选择最合理的基础类型,合理控制工程造价。

关键词:基础;工程造价;对照分析;

The construction costs impact analysis of base form

- be based on engineering project

Name: Zhang Yan-long Tutor: Zhao Ji-kun

Abstract:T his article Emphatically Introduces The same Construction geological conditions, settle for the request,and analyse the different type of the foundation Base Be good at both the principle of the foundation Base design and the economy. comparative analysis the shallow foun- dation , Controlling settlement composite pile foundation and pile foundation.chose the best fou- ndation Base and job practice. discuess the construction cost from the view of the value enginerr- ing.Finally,choose the best foundation Base and control construction costs

Key words:foundation Base; construction costs; contrast analysis

引言一个工程项目的建成,要消耗大量的人力、物力和资金。合理确定和控制工程造价,是工程项目建设的需要,也是提高投资效益的需要。工程造价通常指工程建设项目的建造价格。工程建设是物质资料的生产过程和消费过程。工程造价管理是工程项目管理的部分,是为工程项目管理服务的。在优化建设方案、设计方案的基础上,在建设程序的各个阶段,采用定的方法和措施,将工程造价的发生控制在合理的范围和核定的造价限额以内,以求合理地使用人力、物力和财力,取得较好的投资效益。而基础是满足建筑物承载力的关键,所以本文从几中不同基础的力学性能及建造价格上合理选择方案,以降低成本。

一、基础的定义及相关分类

(一)基础的定义

基础指建筑底部与地基接触的承重构件,它的作用是把建筑上部的荷载传给地基。因此地基必须坚固、稳定而可靠。工程结构物地面以下的部分结构构件,用来将上部结构荷载传给地基,是房屋、桥梁、码头及其他构筑物的重要组成部分。

(二)基础的历史发展

中国在建筑物的基础建造方面有悠久的历史。从陕西半坡村新石器时代的遗址中发掘出的木柱下已有掺陶片的夯土基础;陕县庙底沟的屋柱下也有用扁平的砾石做的基础;洛阳王湾墙基的沟槽内则填红烧土碎块或铺一层平整的大块砾石。到战国时期,已有块石基

础。到北宋元丰年间,基础类型已发展到木桩基础、木筏基础及复杂地基上的桥梁基础、堤坝基础,使基础型式日臻完善。在《营造法式》中对地基设计和基础构造都作了初步规定,如对一般基础埋深指出“凡开基址,须相视地脉虚实,②采用地基上梁和板的计算方法。其深不过一丈,地基土质较好的情况下能够满足设计要求。浅止于五尺或四尺,……”的规定。

(三)国内外对基础的研究

日本基础设计

日本是一个地震频繁的国家,在设计、施工方面有一定的实践经验。设计浅基础时,满足相关规定的垂直荷载和水平荷载组合作用下的基地应力,必须去报不得超过临时荷载下地基的容许强度。还须根据情况,必要时保证基础不致出现滑动等。同时应保基础底部持力层在由于的证作用下的设计外力所产生的倾覆力矩而形成的变化垂直力以及在最下层柱脚部位所传递的水平与力矩的作用下,均不致出现问题。

美国工程造价的计价原则

一、追求全生命周期的费用最小

在美国,在计算出工程造价后,一般还要计算工程投入运行后的维护费,作出工程寿命期的费用估算,并对工程进行全面的效益分析,从而避免片面追求低造价、而工程投产后维护使用费用不断增加的弊端。

二、广泛应用价值工程

美国的工程造价的估算是建立在价值工程基础上的,在工程设计方案的研究论证中,一般都有估价师的参与。以保证在实现功能的前提下,尽可能减少工程成本,是造价建立在合理的水平上,从而取得最好的投资效益。

鉴于基础在工程造价中的重要地位,近年来我国学者对基础形式及基础造价管理有了更多的研究。

我国学者贾晓青,张慧在《软土地基承载力计算及其影响因素中》以福州市某工程为例指出,地基承载力的研究往往可以归并入两个平行的研究体系,由此衍生出的相关概念看似相同,却有着不同的起源和适用条件。在这两种不同的视野下,分别考察软上地基承载力的影响因素,有可能为软土地基承载力的研究提供新的视角。选择不同的破坏模式和强度指标或者不同的统计方法和上性指标,都有可能对软上地基承载力计算结果产生影响。软上地基承载力值的得出,本质上更应该是一个设计的过程,而且这个过程体现了确定论和概率论的辩证统一。通过相关分析,选取能反映地基应力影响空间特性的土性参数,对不同软上地基承载力的计算公式的适用性做出评价,计算结果表明,汉森公式和斯肯普顿公式的计算结果更符合福州市的软土地基的工程实践。

我国学者范庆来在《浅基础在水平荷载与力矩荷载的作用下的承载能力》中通过计算得出结论,为了研究条形浅基础在水平荷载与力矩荷载的复合加载条件下的承载性能,文中通过二次开发,在有限元软件ABAQUS平台下引入了可以考虑强度各向异性的Tresca理想弹塑性本构模型。进而联合采用swipe加载模式和固定位移比加载模式,探讨了浅基础埋深、地基土不排水强度的各向异性对于浅基础破坏包络面的影响。计算结果表明:(1)当浅基础埋深与宽度之比大于0.5时,基础的破坏包络面出现显著倾斜,不满足Bransby等建议的包络面方程;(2)在H/H -M/M 的归一化荷载平面内,埋深与宽度之比D/B对于包络面的形状有较大影响,而在给定埋深情况下,地基土强度的各向异性对于包络面形状几乎没有影响;(3)在破坏包络面上,-H ≤H≤0。时,地基的破坏主要表现为勺形模式;0≤H≤H 、时,地基失稳模式则逐渐转变为勺形一楔体模式,基础所能承受的弯矩也由极限值M 增大为最大值M 二、;而后地基失稳以楔体模式为主,此时基础的水平承载力保持在H 不变,但是抵抗弯矩的能力在明显下降;最后地基破坏形式过渡成为反向勺形模式,基础所能承受的水平荷载逐渐由H 减小为H 。

二、建筑地基基础工程概述

(一)建筑地基基础工程概述

近年来,随着基本建设的飞速发展,我国的建筑地基基础工程有了长足的发展。在土建工程中,地基基础工程的地位非常重要。以建筑工程为例,地基基础工程在总造价和总工期中均占三分之一左右[1]。在实际工程中,地基基础问题往往是影响投资和制约工期的主要因素。这对业主来说是一个不容忽视的投资。因此,作为一个专业设计人员,必须在注意安全适用的同时,充分考虑到地基基础的经济因素。

昆明理工大学学者王振华在其《建筑地基基础工程造价管理研究》中指出建筑地基基础工程是土木工程的一个组成部分,其业务范围很广,工作内容主要包括建筑地基基础工程勘察、建筑地基基础工程设计、建筑地基基础工程施工和建筑地基基础工程监测四个方面[3]。而基础的选型即基础工程设计的选型是其中的一个重要因素。

(二)地基基础设计原则

根据(建筑地基基础设计规范)的要求,地基基础设计必须根据建筑物的用途和安全等级,建筑布置上部结构类型,充分考虑建筑场地和地基岩土条件,结合施工条件以及工期,造价等各方面的要求,合理地选择地基基础方案[4]。因地制宜,精心设计,以保证建筑物的安全和正常使用。具体地说,地基基础的设计和计算应该满足以下三项基本原则。

1.对防止地基地体剪切破坏和丧失稳定性方面,应具有足够的安全度。

2.应控制地基变形量,使之不超过建筑物的地基变形允许值,以免引起基础不利截面和上部结构的损坏,或影响建筑物的正常使用和外观。

3.基础的型式,构造和尺寸、除应能适应上部结构、符合使用需要,满足地基承载力(稳定性)和变形外,还应满足对基础结构的强度,刚度和耐久性的要求,尽量做到技术先进.安全适用,经济合理。[7]

天津大学工程学院王成华在《浅基础地面形状对沉降量影响研究》一文中指出,基础底面形状是影响基础沉降的重要因素之一。日前,因建筑多样化、结构形式多样化·场地条件受限以及临时性建筑的特殊要求等原因,基础底面形状繁多,其中常见的浅基础底面形状有:二角形、矩形、圆形、i1,多边形、L形、H形、T形、十形等。但是,关于基础沉降与任意基础形状之间关系的研究与报道还很少,故对这两者之间的规律性也很缺乏认识。而根据实际基础底面形状来分析和预测基础的沉降,具有重要的学术价值和实用意义。笔者分析了不同基础底面形状对沉降量的影响机理,提出了标准图形的概念,定义了沉降函数,并基于常用的分层总和法得出了一些关于基础底面形状与其沉降量之间的一般规律。

(三)地基处理的意义

天津市颐城市建筑设计有限公司姜浩在《浅谈地基基础处理》中指出,建筑物的地基所面临的问题有以下四力面:a强度及稳定性问题;b.压缩及小均匀沉降问题;c.渗漏问题;d液化问题。当建筑物的天然地基存在上述四类问题之一或几个时,即须采用地基处理措施以保证建筑物的安全与正常使用。我国地域辽阔,从沿海到内地,由山区到平原,分布着多种多样的地基土,其抗剪强度、压缩性以及透水性等因土的种类不同而可能有很大的差别,地基条件区域性较强。因而使地基基础这门学科特别复杂随着我国国民经济的发展,不仅事先要选择在地质条件良好的场地上从事建设,而有时也不得不在地质条件不良的地基上进行修建;另外,随着科学技术的日新月异,结构物的荷载日益增大,对变形的要求也越来越严,因而原来一般可评价为良好的地基,也可能在一定条件下,非进行地基处理不可。所以不仅要针对不同的地质条件、不同的结构物选定合适的基础形式、尺寸和布置力案,而且要善于选取最恰当的地基处理力法。利用换填、夯实、挤密、排水、胶结、加筋和热

学等力法对地基土进行加固,用以改良地基土的工程特性。

三、主要方向及存在的问题

如何做好建筑地基基础工程投资分析决策,优化地基基础工程设计、采用合理的基础形式及施工方法是我过建筑地基基础工程中所要解决的主要问题[8]。沈阳正基建筑设计有限公司根据以往工程实例认为,基础设计主要面临的问题就是地基的承载力问题,其高低决定了一个建筑物使用何种类型的基础[9]。一般多层砌体房屋传递到基础的墙底最大内力并不大,相对于大多数情况下的地基土,使用天然地基条件下的浅基础是最合理、最经济的方案[10]。在对于地基土软弱的情况下,通常的经验是天然地基基础最省,沉降控制符合桩基次之,纯桩基最贵。其实不一定,因为每个工程的自然地质条件不通。

上海大华造价工程有限公司及上海陆家嘴规划建筑设计有限公司结合具体工程分析了不同的基础类型对工程造价的影响。分析得出,通常沉降控制符合桩基或天然基础比纯桩基节省,但在某些地质条件下可能纯桩基比沉降控制符合桩基要节省。[11] 基础的选取要考虑到沉降量,江门市路桥集团第一工程有限公司,冯北洁在《浅基础最终沉降量分析与预测》中指出建筑物地基的沉降对于正常使用有很大影响,应用分层总和法计算地基的最终沉降量与实测的最终沉降量往往有较大的差距,因此有必要从已有的建筑物沉降观测资料中探求建筑物最终沉降量与建筑物及地基参数的关系,并将这种关系表示为沉降经验公式,作为预测和控制建筑物沉降量的依据.文中从弹性力学半空间理论出发,提出了浅基础建筑物最终沉降量的影响因素及其预测公式,与实测资料相比较,结果表明所提出的预测公式可基本正确预测出浅基础建筑物的最终沉降量.

当前各种文献研究只凭经验来确定工程量及造价的差异,尚无具体数值比较各种地基基础的差异。

四、结语

综合上述文献,建筑物的基础是建筑物安全的保证,同时也是工程造价中的主要部分,如何根据不通的地基条件,设计合理又经济的基础形式,兼顾施工方法。从管理控制,价值工程,统筹经济学方面来研究基础工程的最佳方案,还值得继续研究。

参考文献

[1] 郭超. 建筑工程建设造价控制浅谈[J]. 广东建材,2009(08).

[2] 陈军基础形式的合理选取[J].山西建筑,2008,2.

[3] 王振华建筑地基基础工程造价管理研究[D].昆明:昆明理工大学,2007:54.

[4] 杨卉;孙昱斌.基础类型对工程造价的影响[J].建筑施工,2007,29(11).

[5] 张汝翊某多层厂房桩基础、独立基础与条形基础三种基础形式的造价对比[J].科学之友,2010,

4.

[6] Mark Hall,Cyril Tomkins.A Cost of Quality Analysis of A Building Project:Towards A Complete

Methodology For Design And Build. Construction Manager ,2001.

[7] 叶伟胜. 价值工程在地基处理方案比选中的应用[J]. 铁道建筑,2004(02).

[8] 张子明,赵光恒. 成层地基上基础梁的计算[J]. 水利学报.,1986,02.

[9] Dr.Khaled Nassa..Cost Contingency Analysis for Construction Projects Using

Spreadsheets[J], 2002.

[10]赵永华.多层砖混结构住宅条形基础宽度设计的调整[J].中小企业管理与科技(下旬刊),2010(02).

[11] 张澜清.浅谈柱下独立基础设计[J]. 广东建材,2009(07).

[12]范庆来,栾茂田.浅基础在水平荷载和力矩作用下的承载能力[J].水力学报,2010,10.

[13]贾晓青,张慧.软土地基承载力计算及其影响因素分析[J].人民长江,2008,8(38).

工程管理毕业设计(论文)开题报告完整版

毕业设计(论文)开题报告 学生姓名:学号: 学院:土木工程与力学学院专业:工程管理 设计(论文)题目:广联达大厦投标书的编制指导教师: 2013 年3月16日

开题报告填写要求 1.开题报告(含“文献综述”)作为毕业设计(论文)答辩委员会对学生答辩资格审查的依据材料之一。此报告应在指导教师指导下,由学生在毕业设计(论文)工作前期内完成,经指导教师签署意见及所在专业审查后生效; 2.开题报告内容必须用黑墨水笔工整书写或按教务处统一设 计的电子文档标准格式(可从教务处网页上下载)打印,禁止打印在其它纸上后剪贴, 完成后应及时交给指导教师签署意见; 3.“文献综述”应按论文的格式成文,并直接书写(或打印) 在本开题报告第一栏目内,学生写文献综述的参考文献应不少于15篇; 4.有关年月日等日期,按照如“2002年4月26日”方式填 写。

1.结合毕业设计(论文)课题情况,根据所查阅的文献资料,每人撰写 1500字左右的文献综述(包括研究进展,选题依据、目的、意义) 文献综述 一、研究进展 1、在我国招投标的发展历程及其现状 随着我国在2000年1月1日颁布了《中华人民共和国招标投标法》,经过这些年来的实践证明,该法自施行以来,对规范市场秩序和鼓励竟争,保证建设工程质量标准, 加快工程建设进度,取得理想的经济效益,起到了积极作用。招投标活动当事人在建设 工程交易中心依据法定程序进行交易活动,各中介组织提供全方位服务的市场运行格局,我国的招标投标制度也日益成熟。 市场准入、市场竞争、市场交易等规则趋于规范和完善。企业资质和人员资格管理 逐步完善,工程项目经理动态管理;市场公平竞争规则通过不断的实施更加具体和细化。 建设工程交易中心为保障招标程序规范合法、保证招标全过程公开、公平和公正,确保 进场交易各方主体的合法权益得到保护做了大量工作,并在实施中不断改进。同时招标 代理机构是建筑市场和招标投标活动中不可缺少的重要力量。 工程招投标是通过市场竞争与交易,形成上程合同的过程。由于招标方式与工程招投标行为过程及上程合同的形成与执行都有着部分密切的内在联系.选择不同的招标方 式必然会对工程招投标的操作流程产生影响.进而影响工程招投标成本。本次课题研究就是通过 设计不同的方式方法,从中选择最优方案,编制招投标文件。工程招投标制度成本是招投标行为 主体双方以及其他相关参与方由于共同遵守相应的制度和规则。为此所必须付出的制度运行成本。 主要包括法律成本、监督成本、寻租成本、信用成本和时问成本等组成内容。 随着市场经济体制的建立,基建投资相应市场化,工程招投标制度已经在全国得到普及,成为工程管理降低工程成本,提高工程质量的重要措施。所谓招标投标是在投标者自愿的前提下,坚持公开公平、等价有偿,讲求信用的原则,通过各投标人技术水平、管理水平、成本控制和企业信誉的比较竞争,确定工程的最终承包方的一种经济行为。 招投标在实际工程中得以灵活的运用与实践,得益于微观经济学里的市场结构理

土木工程毕业设计文献综述钢筋混凝土框架结构

文献综述 钢筋混凝土框架结构 1.前言 随着经济的发展、科技进步、建筑要求的提升,钢筋混凝土结构在建筑行业得到了迅速发展。随着建筑造型和建筑功能要求日趋多样化,无论是工业建筑还是民用建筑,在结构设计中遇到的各种难题日益增多,钢筋混凝土结构以其界面高度小自重轻,刚度大,承载能力强、延性好好等优点,被广泛应用于各国工程中,特别是桥梁结构、高层建筑及大跨度结构等领域,已取得了良好的经济效益和社会效益。而框架结构具有建筑平面布置灵活、自重轻等优点,可以形成较大的使用空间,易于满足多功能的使用要求,因此,框架结构在结构设计中应用甚广。为了增强结构的抗震能力,框架结构在设计时应遵循以下原则:“强柱弱梁、强剪弱弯、强节点强锚固”。 2.现行主要研究 2.1预应力装配框架结构 后浇整体节点与现浇节点具有相同的抗震能力;钢纤维混凝土对减少节点区箍筋用量有益,但对节点强度、延性和耗能的提高作用不明显。与现浇混凝土节点相比,预应力装配节点在大变形后强度和刚度的衰减及残余变形都小;节点恢复能力强;预制混凝土无粘结预应力拼接节点耗能较小,损伤、强度损失和残余变形也较小。装配节点力学性能受具体构造影响很大,过去进行的研究也较少,一般说,焊接节点整体性好,强度、耗能、延性等方面均可达到现浇节点水平;螺栓连接节点刚度弱,变形能力大,整体性较差。因此,这一类节点连接如应用于抗震区,需做专门抗震设计。 2.2地震破坏 钢筋混凝土在地震破坏过程中瞬态震动周期逐步延长,地震动的低频成分是加剧结构破坏的主要因素,峰值和持时也是非常重要的原因。瞬态振型的变化与结构的破坏部位直接相关。结构破坏过程中,瞬态振型参与系数变化不大。结构瞬态振动周期

工程项目管理论文参考文献

工程项目管理论文参考文献 的著录格式是否规范反映作者经验和治学态度,以下是搜集整理的工程项目管理论文参考文献,供大家阅读查看。 参考文献一: [1]江军学.推行电子招标投标的思考--在《电子招标投标办法》框架下的行业电子招标投标[J].建筑市场与招标投标.2014(01) [2]汪才华.招标投标制度中存在的深层次问题法律思考之三[J].招标与投标.2013(05) [3]朱平儿.我国招标投标制度下存在的一些问题和展望[J].建筑市场与招标投 标.2013(06) [4]汪才华.招标投标制度中存在的深层次问题法律思考之二[J].招标与投标.2013(04) [5]汪才华.招标投标制度中存在的深层次问题法律思考之一[J].招标与投标.2013(03) [6]刘鹏.江西水利工程招标投标将全面实行行贿犯罪档案查询制度[J].中国水 利.2013(17) [7]陈天昊.从《招标投标法实施条例》的颁布看政府采购救济制度的完善--以法国经验为借鉴[J].西部法学评论.2012(06) [8]谢丽荟.菲迪克条款的应用[J].交通世界(运输.车辆).2012(12) [9]姜磊.EPC总承包应该考虑的几个问题--菲迪克(FIDIC)合同条款中几个重要解读与分析[J].科技致富向导.2012(23) [10]徐烽.我国工程承发包中的交易费用与工程造价分析[J].合作经济与科技.2012(15) [11]张海义.菲迪克价格条款的原理及应用[J].科技视界.2012(21) [12]朱建元.中国电子化招标投标制度建设[J].建筑市场与招标投标.2012(02) [13]肖方.浅谈建筑工程项目招投标中的问题及对策[J].建筑设计管理.2011(09) [14]李俊华.实施建设行业上中下游联动管理推进招投标两大目标的有机结合--东莞建设工程招标投标制度创新的实践与思考[J].建筑市场与招标投标.2011(02) [15]王秋芳.对当前建筑市场招投标评标方法的探讨[J].建设监理.2010(03)

工程管理专业毕业设计外文翻译(外文+翻译)

Study on Project Cost Control of Construction Enterprises By: R. Max Wideman Abstract With the increasing maturity of construction market, the competition between construction enterprises is becoming fierce. The project profit is gradually decreasing. It demands that all construction enterprises enhance their cost control, lower costs, improve management efficiency and gain maximal profits. This paper analyses the existing problems on project cost control of Chinese construction enterprises, and proposes some suggestions to improve project cost control system. Key Words :Construction enterprises, Project management, Cost control After joining the WTO, with Chinese construction market becoming integrated, the competition among architectural enterprises is turning more intense. Construction enterprises must continually enhance the overall competitiveness if they want to develop further at home and abroad construction market. Construction Enterprises basically adopt the "project management-centered" model, therefore, it is particularly important to strengthen project cost control. 1.The Current Domestic Project Cost Classification and Control Methods Cost refers to the consumption from producing and selling of certain products, with the performance of various monetary standing for materialized labor and labor-consuming. Direct and indirect costs constitute the total cost, also known as production cost or manufacturing cost. Enterprise product cost is the comprehensive indicator to measure enterprise quality of all aspects. It is not only the fund compensation scale, but also the basis to examine the implementation of cost plan. Besides, it can provide reference for product pricing According to the above-mentioned definition and current domestic cost classification, construction project cost can be divided into direct costs and indirect costs. Direct costs include material cost, personnel cost, construction machinery cost, material transportation cost, temporarily facility cost, engineering cost and other direct cost. Indirect costs mainly result from project management and company's cost-sharing, covering project operating costs (covering the commission of foreign projects), project's management costs (including exchange losses of

超越边界的bim工程管理毕业论文外文文献翻译

本科毕业论文 外文文献及译文 文献、资料题目:BIM Beyond Boundaries 文献、资料来源:Design Intelligence 文献、资料发表(出版)日期:2012.12.10院(部):管理工程学院 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期:2015.2.10

外文文献: BIM Beyond Boundaries September 10, 2012 · by Randy Deutsch Abstract: Opting for depth over breadth of expertise is a false choice that will lead individuals, organizations, the profession, and industry in the wrong direction. Keywords: BIM, expertise, anti-learning, master builder Several forces are converging to create an unprecedented and timely opportunity for organizations that have embraced building information modeling (BIM). These forces —including the rise of the expert, the growing complexity and speed of projects, and BIM’s increasing recognition as an enabler, catalyst, and facilitator of team collaboration — also present significant challenges that can be overcome with the right approach and mindset. At one time, being an expert meant knowi ng more than one’s competitors in a particular field. Firms that reinforced their expert culture hoarded information, which resulted in silos of expertise. Today, many firms are looking to hire people perceived as building and software technology experts, shortsightedly addressing today’s needs at the expense of tomorrow’s. While architects have always been trees with many branches, our current economic climate has discouraged them from being anything but palm trees: all trunk, no branches. And yet things change so quickly that those who went to bed experts are unlikely to wake up experts in the morning. Due to the speed and complexity of projects, we do not have time to acquire knowledge the old way — slowly, over time, through traditional means. Even when we supplement our book learning with conferences, webinars, and continuing education, it is impossible to keep up with the flow of new information in our industry. Expertise today is a much more social, fluid, and iterative process than it used to be. Being an expert is no longer about telling people what you know so much as understanding what questions to ask, who to ask, and applying knowledge flexibly and contextually to the specific situation at hand. Expertise has often been associated with teaching and mentoring. Today it’s more concerned with learning than knowing: less to do with continuing education and more with practicing and engaging in continuous education. Social media presents the would-be expert with both opportunities and challenges. Working

文献综述范例(土木工程)

四川大学锦城学院文献综述 节能建筑的基础理论与设计原理 专业土木工程 姓名张桐 学号 090350112 指导教师 二Ο一二年三月十九日

一.引言 1.“节能建筑”是什么? 节能建筑(energy-saving building)的定义为设计和建造采用节能型结构、材料、器具和产品的建筑物;在此类建筑物中部分或全部利用可再生能源。节能建筑是指遵循气候设计和节能的基本方法,对建筑规划分区、群体和单体、建筑朝向、间距、太阳辐射、风向以及外部空间环境进行研究后,设计出的低能耗建筑,其主要指标有:建筑规划和平面布局要有利于自然通风,绿化率不低于35%;建筑间距应保证每户至少有一个居住空间在大寒日能获得满窗日照2小时等。 节能建筑的有少消耗资源,高性能品质,减少环境污染,长生命用期,多回收利用的五大特征。 2.研究的重要性——21世纪建设科技的主旋律 中国的建筑节能,起步于上世纪80年代。改革开放后,建筑业在墙体改革及新型墙体材料方面有了发展。与此同时,一批高能耗的高档旅馆、公寓和商场出现了。如何在发展中降低建筑能耗,使之与当时能源供应较紧缺的现状相协调,成为相关部门关注的重点。为此,建筑节能工作首先从减少采暖能耗开始,1986年建设部颁布了《民用建筑节能设计标准》,要求新建居住建筑,在1980年当地通用设计能耗水平基础上节能30%%,《民用建筑节能设计标准》是我国第一部建筑节能设计标准,它的颁布,开启了我国建筑节能新阶段。以它提出的指标为目标,建筑节能的

设计、节能技术纷纷发展起来,一系列的标准和法规先后制定。 20世纪90年代,建筑节能的地位进一步提高,节能工作有效开展。1990年,建设部提出“节能、节水、节材、节地”的战略目标。1994年在《中国21世纪议程》中,建筑节能作为项目之一被郑重提出;从1994年起,国家对北方节能建筑实施免征固定资产投资方向调节税,一批节能小区相继建成。1995年《民用建筑节能设计标准》修订并于次年执行,修订后的《民用建筑节能设计标准》将第二阶段建筑节能指标提高到50%%。同年,建设部发布《建筑节能“九五”计划和2010年规划》,这个专门的规划以及1996年9月建设部发布的《建筑节能技术政策》和《市政公用事业节能技术政策》,为其后建筑节能的发展明确了方向,同时也表明建筑节能地位的空前提高。建筑节能的地位最终由1998年1月1日实施的《中华人民共和国节约能源法》确定下来,建筑节能成为这部法律中明确规定的内容。 21世纪的到来,在科学发展观的指引下,建设领域明确了必须走资源节约型、环境友好型的新型工业化道路,建设科技工作将“四节一环保”作为科技攻关的主要方向,取得了明显效果。目前我国已初步建立起了以节能50%%为目标的建筑节能设计标准体系,部分地区执行更高的65%节能标准。2008年《民用建筑能效测评标识管理暂行办法》、《民用建筑节能条例》等施行,《民用建筑节能条例》的颁布,标志着我国民用建筑节能标准体系已基本形成,基本实现对民用建筑领域的全面覆盖。

参考文献-工程项目管理

参考文献 [1]吴涛,丛培经.中国工程项目管理知识体系[M].北京:中国建筑工业出版社,2003. [2]梁世连.工程项目管理[M].北京:中国建材工业出版社,2004. [3]吴涛,丛培经.建设工程项目管理实施手册[M].2版.北京:中国建筑工业出版社,2006. [4]丁士昭.建设工程项目管理[M].北京:中国建筑工业出版社,2004. [5]成虎.工程项目管理[M].北京:中国建筑工业出版社,2001. [6]陆惠民,苏振民,王延树.工程项目管理[M].南京:东南大学出版社,2002. [7]丛培经.建设工程项目管理规范培训讲座[M].北京:中国建筑工业出版社,2003. [8]丛培经.工程项目管理[M].北京:中国建筑工业出版社,2005. [9]田金信.建设项目管理[M].北京:高等教青出版社. 2002. [10]自思俊.现代项目管理[M].北京:机械工业出版社,2005. [11]张金锁.工程项目管理学[M].北京:科学出版社. 2002. [12]丛培经.实用工程项目管理手册[M].北京:中国建筑工业出版社,2005. [13]桑培东.建筑工程项目管理[M].北京:中国电力出版社. 2004. [l4]蒲建明.建筑工程施工项目管理[M].北京:机械工业出版社,2003. [15]王要武.工程项目管理百间[M].北京:中国建筑工业出版社,2002. [16]戚振强.建设工程项目质量管理[M].北京:机械工业出版社,2004. [17J顾慰藉.建设项目质量监控[M].北京:中国建筑工业出版社,2004. [18]张毅.工程建设质量监督[M].上海:同济大学出版社,2003. [l9]王祖和.项目质量管理[M].北京:机械工业出版社,2004. [20]韩福荣.现代质量管理学[M].北京:机械工业出版社,2004. [21]赵涛,潘欣鹏.项目质量管理[M].北京:中国纺织出版社,2005. [22]顾勇新,吴获,刘宾.施工项目质量控制[M].北京;中国建筑工业出版社,2003. [23]李三民.建筑工程施工项目质量与安全管理[M].北京:机械工业出版社,2003. [24J陈乃佑.建筑施工组织[MJ.北京E机械工业出版社,2004. [25]许元龙.业主委托的工程项目管理[M].北京:中国建材工业出版社,2005. [26]郑海航.企业组织论[M].北京:经济管理出版社,2004. [27]许程洁,周晓静.建筑工程估价[M].北京:机械工业出版社,2004. [28]姜华.施工项目安全控制[M].北京:中国建筑工业出版社,2003.

工程管理工程造价中英文对照外文翻译文献

中英文资料对照外文翻译 Design phase of the project cost management Abstract Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives. Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy, Even under the WTO and China's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

土木工程毕业设计文献综述修订稿

土木工程毕业设计文献 综述 WEIHUA system office room 【WEIHUA 16H-WEIHUA WEIHUA8Q8-

XXXXXXXXX学院毕业论文(设计)文献综述 题目:宿舍楼 专业班级:学生姓名:学号 一、前言部分(说明写作目的,介绍有关概念、综述范围,扼要说明有关主题或争论焦点) 我选的毕业设计类型为XX市易联科技网络有限公司职工宿舍楼的设计,选用这种 具有强代表性、高实用性、中下档次的宿舍楼为我设计题目,是出于三方面的考虑: 1、宿舍楼建筑是工民建中,数量较多,又非常有代表性的建筑,宿舍楼的设计中需要的知识涵盖了本校土木工程专业所有设置的学科知识。 2、低档次宿舍楼的用料比较常规,结构规整,计算比较简单而易于计算。 3、这是我第一次运用专业知识进行实际工程的设计,在知识上有许多地方还存在不足,需要进一步的学习,在实践方面又毫无实践经验。 综合以上三方面因素考虑,为了既能达到工程实际的要求,又能把自己所学的知识尽可能多的得到应用,我特意把本次宿舍楼的设计定为中小企业的实际工程。这样,只要通过努力,我相信以自己现有的能力,我一定能保质保量的完成本次毕业设计。 二、主题部分(阐明有关主题的历史背景、现状和发展方向,以及对这些问题的评述) 根据业主的相关要求,本拟建工程为想XX市易联科技网络有限公司职工宿舍楼,预设计总建筑面积为,层数为6层的框架结构宿舍楼。本工程的±标高由现场确定,基础采用预应力混凝土管桩。 我在在设计中将主要会用到先前学习过的《工程图学》、《工程CAD》、《房屋建筑学》、《土力学与基础工程》、《砼与砌体结构设计原理》、《结构抗震》、《高层

建筑施工项目质量管理文献综述

建筑施工项目质量管理文献综述 摘要: 建筑施工项目质量管理是围绕建筑施工项日质量方面进行的指挥、 协调、控制等一系列活动。本文围绕建筑施工项目质量管理,对其特点、过程等展开了分析,并就当前问题提出了对策。 关键词: 建筑施工项目质量管理 The Problems and the Countermeasures in Bidding Management of the Construction Engineering Project Abstract: Dividing the bidding document into technical bidding and commercial bidding and scoring them respectively, then evaluating and awarding the bidding according to soma principles and the fixed procedures and it m ay be the promising solution to problems existing in the bidding. Construction engineering project; bidding; procedure。 正文 1、建筑施工项目质量管理及其特点 一般地,工程质量是指工程满足业主需要的,符合国家法律、法规、技术规范标准、设计文件及合同规定的特征综合。就建筑施工项目质量

而言,其特点主要有: 1.1. 使用性 所谓使用性,就是指建筑工程能够满足使用目的的各种性能。包括理化性能,如规格、尺寸、保温、隔热、隔音、耐酸、耐碱、耐腐蚀等;结构性能,如地基基础牢固程度、结构的足够强度、刚度和稳定性等;使用功能,如民用住宅要能满足居住的需要,工业厂房要能满足生产的需要等。 1.2. 安全性 所谓安全性,就是指建筑工程建成后在使用过程中保证结构安全以及保证人身和环境免受危害的程度。一般地,工程的结构安全度、抗震、防火、耐火、放腐能力以及抗核污染、抗爆炸波等能力,是否能够达到特定的要求,都是安全性的重要标志。 1.3. 经济性 所谓经济性,就是指建筑工程从规划、勘察、设计、施工到整个产品使用寿命周期内的成木和消耗的全部费用。 1.4. 可靠性 主要指工程在规定的时间和规定的条件下完成功能的能力。一般地,工程不仅要求在竣工验收时要达到规定的指标,而且在一定的使用期内要保持应有的正常功能,保证具有使用价值。 1.5. 环境适应性

工程管理开题报告文献综述范文

工程管理开题报告文献综述范文 宝宝们是不是都在为论文烦恼呢?开题报告、文献综述、外文翻译、抄袭检测软件,都在这啦...快点用起来吧~ 开题报告主要包括以下几个方面: (一)论文名称 论文名称就是课题的名字 第一,名称要准确、规范。准确就是论文的名称要把论文研究的问题是什么,研究的对象是什么交待清楚,论文的名称一定要和研究的内容相一致,不能太大,也不能太小,要准确地把你研究的对象、问题概括出来。 第二,名称要简洁,不能太长。不管是论文或者课题,名称都不能太长,能不要的字就尽量不要,一般不要超过20个字。 (二)论文研究的目的、意义 研究的目的、意义也就是为什么要研究、研究它有什么价值。这一般可以先从现实需要方面去论述,指出现实当中存在这个问题,

需要去研究,去解决,本论文的研究有什么实际作用,然后,再写论文的理论和学术价值。这些都要写得具体一点,有针对性一点,不能漫无边际地空喊口号。主要内容包括: (1)研究的有关背景(课题的提出):即根据什么、受什么启发而搞这项研究。 (2)通过分析本地(校)的教育教学实际,指出为什么要研究该课题,研究的价值,要解决的问题。 (三)本论文国内外研究的历史和现状(文献综述)。 规范些应该有,如果是小课题可以省略。一般包括:掌握其研究的广度、深度、已取得的成果;寻找有待进一步研究的问题,从而确定本课题研究的平台(起点)、研究的特色或突破点。 (四)论文研究的指导思想 指导思想就是在宏观上应坚持什么方向,符合什么要求等,这个方向或要求可以是哲学、政治理论,也可以是政府的教育发展规划,也可以是有关研究问题的指导性意见等。

(五)论文写作的目标 论文写作的目标也就是课题最后要达到的具体目的,要解决哪些具体问题,也就是本论文研究要达到的预定目标:即本论文写作的目标定位,确定目标时要紧扣课题,用词要准确、精练、明了。 常见存在问题是:不写研究目标;目标扣题不紧;目标用词不准确;目标定得过高, 对预定的目标没有进行研究或无法进行研究。 确定论文写作目标时,一方面要考虑课题本身的要求,另一方面要考率实际的工作条件与工作水平。 (六)论文的基本内容 研究内容要更具体、明确。并且一个目标可能要通过几方面的研究内容来实现,他们不一定是一一对应的关系。大家在确定研究内容的时候,往往考虑的不是很具体,写出来的研究内容特别笼统、模糊,把写作的目的、意义当作研究内容。 基本内容一般包括:①对论文名称的界说。应尽可能明确三点:研究的对象、研究的问题、研究的方法。②本论文写作有关的理论、名词、术语、概念的界说。

土木工程毕业设计文献综述

土木工程毕业设计文献综 述 Prepared on 22 November 2020

XXXXXXXXX学院毕业论文(设计)文献综述 题目:宿舍楼 专业班级:学生姓名:学号 一、前言部分(说明写作目的,介绍有关概念、综述范围,扼要说明有关主题或争论焦点) 我选的毕业设计类型为XX市易联科技网络有限公司职工宿舍楼的设计,选用这种具有强代表性、高实用性、中下档次的宿舍楼为我设计题目,是出于三方面的考虑: 1、宿舍楼建筑是工民建中,数量较多,又非常有代表性的建筑,宿舍楼的设计中需要的知识涵盖了本校土木工程专业所有设置的学科知识。 2、低档次宿舍楼的用料比较常规,结构规整,计算比较简单而易于计算。 3、这是我第一次运用专业知识进行实际工程的设计,在知识上有许多地方还存在不足,需要进一步的学习,在实践方面又毫无实践经验。 综合以上三方面因素考虑,为了既能达到工程实际的要求,又能把自己所学的知识尽可能多的得到应用,我特意把本次宿舍楼的设计定为中小企业的实际工程。这样,只要通过努力,我相信以自己现有的能力,我一定能保质保量的完成本次毕业设计。 二、主题部分(阐明有关主题的历史背景、现状和发展方向,以及对这些问题的评述) 根据业主的相关要求,本拟建工程为想XX市易联科技网络有限公司职工宿舍楼,预设计总建筑面积为,层数为6层的框架结构宿舍楼。本工程的±标高由现场确定,基础采用预应力混凝土管桩。 我在在设计中将主要会用到先前学习过的《工程图学》、《工程CAD》、《房屋建筑学》、《土力学与基础工程》、《砼与砌体结构设计原理》、《结构抗震》、《高层建筑结构》这几门课程的知识,须完成的建筑和结构一系列的设计图纸。主要的图纸任务如下:

项目管理文献综述

------------------------------------------------------------------------------------------------------------------------------- ------------- 关于项目风险管理的文献综述 一、引言 项目风险管理是为了最好地达到项目的目标,识别、分配、应对项目生命周期内风险的科学与艺术,是一种综合性的管理活动,其理论和实践涉及到自然科学、社会科学、工程技术、系统科学、管理科学等多种学科。项目风险管理的目标可以被认为是使潜在机会或回报最大化、使潜在风险最小化。 二、风险管理理论国内外研究 1.风险管理理论的发展 风险管理作为系统科学产生于本世纪初的西方工业化国家。比较系统的风险管理理论源于美国。1931年美国管理协会首先倡导风险管理,其后以学术会议及研究班等多种形式集中探讨和研究风险管理问题,但在这段时间内,风险管理的内容和范围都是十分狭窄的。1955至1964年,诞生了现代学术性和职业化的风险管理,此后,对风险管理的研究逐步趋向系统化、专业化、风险管理己逐渐成为一门独立的学科。 20世纪70年代中期风险管理方面的课程及论著数量大增,全美大多数大学工商管理学院普遍开设风险管理课程,RIMS开始建立欧洲及亚洲风险管理团体之间的联系,这导致全球性的风险管理专业联合体的形成,风险管理开始进入全球化阶段。在西方发达国家,各企业中都相继建立了风险管理机构,专门负责风险的分析和处理方面的工作。美国还成立了全美范围的风险研究所和RIMS等专门研究工商企业风险管理的学术团体。1983年在RIMS 年会上,各国专家学者经过广泛深入的讨论,通过了“危险性风险管理101准则”,作为各国风险管理的一般原则。1986年10月在新加坡召开的风险管理国际学术讨论会表明:风险管理已经走向全球,成为全球范围的国际性运动。 ---------------------------------------------------------精品文档---------------------------------------------------------

工程管理专业建筑项目招投标Building-engineering-bidding毕业论文外文文献翻译及原文

毕业设计(论文)外文文献翻译 文献、资料中文题目:建筑项目招投标 文献、资料英文题目:Building engineering bidding 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

本科毕业设计外文翻译 Building engineering bidding Yang Cao a,*, Shuhua Wang b, Heng Li a aDepartment of Building and Real Estate, Hong Kong Polytechnic University, Hong Kong, China bState Key Laboratory of Novel Software Technology, Nanjing University, Nanjing 210093, China Abstract Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good benefits, have to control their cost and improve management to enhance the capacity of adapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. bidding documents should be well formulated ,which is the improtment to a successful bidding and direct influence the success or failure of the bidding work.Becasue the success or failure of the bidding for the survival and development of enterprise has a direct impact, so we have a high quality, improve the bid documents of the unit, prevent invalid and successful pass mark appear, become a research topic. [key] : bidding drawbacks of unfair competition countermeasures Bidding is a form of project transactions, project bidding process is to determine the successful bidder and the cost of the process and the price of the project, project bidding work of a very important link, do a good job bidding to determine the price, we can effectively control construction costs, and create a fair and equitable market environment, create orderly competition mechanism. Bidding in construction activities, construction enterprises in order to tender invincible works to be successful, And from the contracted projects profitable, it needs to integrate various subjective and objective conditions, the tender research strategy determine tender. Tender

相关文档
相关文档 最新文档