胶东调水工程宋庄泵站优化调度运行决策分析

54水科学与工程技术2017年第4期

调水工程宋庄泵站优化调度运行决策分析

李志强,杨星龙,王勇

(山东省胶东调水工程寿光管理站,山东寿光262700)

摘要:宋庄泵站是胶东调水工程的第一级泵站,在多年的调度运行中,针对泥沙沉积、地表沉降、冬季冰凌等多种因素影响,提出了宋庄泵站调度运行中存在的问题及解决办法。

关键词:泵站;地表沉降;冰凌;气蚀;调度运行;决策

中图分类号:TV7 文献标识码:B 文章编号:1672-9900(2017)04-0054-03 Optimization of operation and decision of Songzhuang pumping station of

Jiaodong Water Diversion Project

LI Zhi-qiang,YANG Xing-long,WANG Yong

(Shouguang Management Station of S handong Province Jiaodong Water Diversion Project, Shouguang 262100, China) Abstract:Songzhuang pumping station is the first level pumping station of Jiaodong water diversion project, in the operation management of years, this paper analyzes various factors of sediment, surface subsidence, winter ice etc., and puts forward the solutions to optimize the dispatch and operation of Songzhuang pumping station.

Key words:p umping station ;settlement of ground surface ;ice ;cavitation ;operation ;decision

l胶东调水工程及宋庄泵站概况

i.i肢东调水工程(原引黄济青工程)

南水北调东线工程中山东“T"字■调水太动脉 的重要组成部分,是实现山东水资源优化配置,缓解 胶东地区水资源供需矛盾,改善当地生态环境的重要

水利基础设施。胶东调水工程输水线路总长482km,其中利用引黄济青段工.程172km2,新建输水线路 322km。通过原引黄济青弓丨黄丨珂,经宋庄、笨耨泵站提 水,新建5级提水泵站给烟台门楼水库和威海米山水

库供水。

1.2宋庄泵站

山东省胶东调水工程(原山东省引黄济青3:程)

已建成的育级菜站,是整个工輕的童荽节点之一,位 于寿光市田柳镇宋庄村西北500m处,1987年动I,1989年建成通水&泵站为堤身式结构,肘型进水流 道,虹吸式出水流道,真空破坏阀断流,厂房分主、副r房、出水室3部分主厂房自上而下分别为:电机层、联轴議、水泵屬、流道泵站设计扬程9.37m,设 计流灣为35m3/s,采羯12CJS-100轴流菜2台和 1400HD-9混流泵5台,配套TL720-16A730同步机。另有2台26HB-40卧式混流泵为调节机组。泵站由 35kV专线供电,有各型变压器5台,供电总容羹 9300kVAfl

2影响宋庄泵站调度运行的因素

2.1 泥沙於私的影响

在调水过程中,虽然利用渠首沉砂池对来水进 行了沉砂处理,彳且近几年来,由于调水任务急,任务 重,输水流量大,水流速度快,导致水体的沉淀时间 _,泥沙带入下游的量大量增加,输水河道泥沙淤积 非常产重。2015年10月份,宋庄泵站组织施工力量进 行了彻底清淤,但到2016年12月,进水池淤泥又达4m 以上,淤泥层断面达到进水池断面的50%,由于来水 受阻,从而导致水泵进水口处水流流态轰乱,出现漩 涡,进人水中的气体增加,水泵气蚀现象加剧,严重