文档库 最新最全的文档下载
当前位置:文档库 › 【2018最新】会议场地布置的五种方案参考-word范文 (1页)

【2018最新】会议场地布置的五种方案参考-word范文 (1页)

【2018最新】会议场地布置的五种方案参考-word范文 (1页)

【2018最新】会议场地布置的五种方案参考-word范文

本文部分内容来自网络,本司不为其真实性负责,如有异议或侵权请及时联系,本司将予以删除!

== 本文为word格式,下载后可随意编辑修改! ==

会议场地布置的五种方案参考

1.礼堂式:面向房间前方摆放一排排座椅,中间留有较宽的过道。

特点:在留有过道的情况下,最大程度地摆放座椅;观众没有地方放资料,也没有桌子可用来记笔记。

2.教室式:房间内将桌椅按排端正摆放或成"v"型摆放,按教室式布置房间根据桌子的大小而有所不同。特点:可针对房间面积和观众人数在安排布置上有一定的灵活性。

3.弦月式:房间内放置一些圆形或椭圆形桌子,椅子只放在桌子的一面,以便所有观众都面向屋子的前方。

4.方形中空式:桌子摆成方形中空,不留缺口。椅子摆在桌子外围。

5.马蹄形或"u"形:将桌子连接着摆放成长方形,但空出一个短边。椅子摆在桌子外围也可以内外都摆放。

场地布置方案()

施工场地布置方案 一、场地布置的主要原则。 1、布置根据 根据图纸、结合现场勘察情况,并考虑进度的总体安排,按照文明施工、安全生产的要求,对施工现场进行布置。现场的平面布置要考虑施工区域的划分、施工通道的布置、现场临时水电的布置、现场生产设施、现场办公以及生活区等内容,以保证现场生产的需要以及满足施工进度为前提。 2、布置原则 2.1合理布置各项施工设施,科学规划施工道路,尽量降低运输费用。 “有利于施工、方便生活、安全防火、和环境保护”要求。 3、施工总平面图 3.1施工围挡 进场后,视现场需要,必要时设立施工围挡,确保施工安全。 3.2施工现场便道 经现场踏勘,综合考虑本工程的现场条件,为保证车辆人员进出现场通畅,所需物资能及时运至现场。必要时在施工现场修建临时施工便道,并在适当位置设置出入口通道。 3.3材料堆场、材料库房。 材料堆场要设在临近出入口的位置,材料堆放要整齐。 3.4行政办公、施工区及临时设施的搭设 为满足现场施工需要,同时减小施工区对办公区的影响。现场内大致分为两个区,办公区,材料、机具堆码区。具体临设搭建要求为: (1)本工程用工高峰区达220人左右。 (2)现场设置办公室,会议室,设置独立厕所,单独设置进出的通道。 (3)办公室为开间3.6m,其进深为5m。 4、施工给排水平面布置 本工程施工用水按甲方指定点碰头取水。现场内排水主要依地势走向。污水经沉淀排入市政管网。排水范围包括生活污水排放和施工生产污水排放。

5、施工现场临时用电布置 本工程施工现场的电源位置由甲方及总包确定,供电现场供电线路按二个回路铺设,具体布置方式如下述: 5.1施工现场临时用电量确定及各支线路电缆线确定 5.2用电量的计算 本工程施工期间最大用电容量的确定以最高峰浇筑砼垫层和挡墙的施工阶段的施工用电量为准,这一期间投入较多的施工机械,应选择额定电容量为20KV(1)的配电房,方可满足现场施工用电要求。 5.3施工用电线路截面的确定:根据计算,查表得: (1)、办公、照明导线选择4mm2(2)X型铜芯绝缘线。 (2)、机械用电:选择一根20mm2的(2)X型铜芯绝缘线。 通州建总集团有限公司 横岭拆迁安置复建房三期4#-8#楼工程

会场布置方案

会场布置方案 (一)主席台布置 1.使用背景主题喷绘(长7米,宽4米) 2.座次安排: (1)使用“而”字型会议方式,设有主席台,主席台为发言席。 (2)第一排由公司董事长,总经理居中,其他领导按职务高低先左后右向两边顺排。 (3)其他人员跟着第一排依次排序 1.桌面:桌面台前摆放,会议文件,纸,笔,矿泉水,水果。 (二)会议场所布置 1?会标:将主题板设主席台后面。 2.花卉:发言席上摆上鲜花,第一排摆上鲜花。 3.光线:白天开会,光线太强可关上窗帘。 4.室温:控制适度的室温跟湿度。 (三)确定会议所需设备和工具 文具、台签、文件袋、纸笔、鲜花、笔记本、摄影机、麦克风、音响、会标。 (四)确定会议文件范围 欢迎词、会议议程、会议日程、签约合同文件,其他相关文件。 (五)会议文件的准备 (1)按与会人员数量准备,文件袋上标明“会议文件”在与会人员报道是发给与会者。 (2)会议证件的制作:系带式卡片,设代表证,工作证

、会场内外平面图布置 优秀企业成果经验高层研讨会 (主持台)(主席台) 1、迎宾区及条幅悬挂处; 2、左边为各企业文化展示区,右边是签到区; 3、嘉宾休息区; 4、礼仪接待区; 5、道具及餐饮供应区; 6、主会场; 7、主席台;&次会场(突发事项使用) 第三部分:会场布置 1、迎宾区设计:迎宾区域由气球拱门,横幅,地毯构成,由礼仪或行为艺术表演者担任, 红色的地毯配合着白色的灯光,在到场嘉宾走过气球拱门时,给到场来宾一种受人尊敬或耳 目一新的感觉。 2、休息区设计:在2个休息区内分别放置12张桌子,每张桌子配3-4把椅子共100个座位。休息区内桌子需适度密集,在休息区内需用少量白色彩灯布置照亮道路,区域内备上一些蜡烛灯,在来宾聊天休息之余可以点燃,以营造一种安逸,温馨的氛围。 3、会场整体设计:工作人员着统一正装,统一黑色正装打领带(礼仪除外)。 第四部分道具总汇 1、(长)10m X(宽)2m迎宾红地毯; 2、白色气球条; 3、白色小彩灯; 4、音响设备、灯光设备; 5、27张桌子,120把椅子不包括(酒水区和冷餐区); 6、主持台; 7、横幅0.6m x 5m ;

施工现场总平面布置方案综述-如何进行施工总平面布置

第一节现场概况及部署 一、现场概况 本工程现场场地较为狭小,周边道路狭窄,现场平面布置考虑充分利用现有场地,按功能划分施工区域及办公区域,施工各区域用围墙隔断,严格按照公司的现场管理手册执行,为保证现场的井然有序,采用隔断、油漆画线、标志板等方式表示区域的使用功能,施工现场平面布置详见附图。

二、部署 针对施工现场场地的实际因素,我公司特作如下部署: 1、在场地西北面(与**加工场紧邻)布置办公区供管理人员办公和工人住宿、生活卫生等设施,并按规定分区分隔。 2、我公司根据本工程施工总体部署对其不同施工阶段的划分,按照“方便施工,就近布置,见缝插针”的原则,将现场周边除建筑以外的空地合理利用,布置施工场地。 在现场的基础设施布置及数量见下表:

第二节现场平面分阶段布置及说明 一、下部结构施工阶段 1、平面布置: 我公司进场后根据遵义市安全文明施工要求标准进行围墙全封闭砌筑,在围墙的西北侧设大门、门卫值班室,并根据实际情况布置大型机械设备、小型加工设备以及施工用水用电等。 2、机械设备配备布置: 本阶段机械设备主要包括:塔吊、混凝土输送泵等,本工程布置1台塔吊,混凝土输送泵布置2台,布置在道路畅通靠近施工部位,并配置相应的泵管等。 3、加工场地布置: 我公司尽可能利用周边空闲场地进行钢筋、模板的加工,各施工标段循环进行施工,材料运输利用塔吊进行配合。 二、上部结构施工阶段 1、平面布置: 根据遵义市安全文明施工要求标准进行全封闭砌筑,在主出入口通道处设大门、门卫值班室,并根据实际情况布置大型机械设备、小型加工设备以及施工用水用电等。在土方回填完毕后,将围墙一周边界之间的空地全部硬化形成一条环形道路,作为施工机械、物资运输道路用。在场地内布置一处钢筋、木工加工区作为钢筋、模板加工场地。 2、机械设备配备布置: 机械设备配备有:塔吊、钢筋加工设备、木工加工设备、混凝土输送泵等。 3、加工场地布置: 在塔吊范围内合理布置钢筋、模板加工场地,并配备相应的加工机械。 三、装修施工阶段 保留原有围墙、大门以及现场临时施工通道,在场地内集中设立两台砂浆搅拌机用于装修阶段水泥砂浆的制备,砂浆拌制完毕后由翻斗车或小推车运至

临建场地布置施工方案

南京地铁七号线施工总承包D7-TA02标5工区 项目临建施工方案编制: 审核: 批准: 中铁上海工程局集团有限公司 南京地铁七号线工程D7-TA02标 土建五工区项目经理部 2017年11月

目录 1编制依据及原则.......................... 错误!未定义书签。 1.1编制依据 0 1.2编制原则 0 2工程概况 (1) 2.1临建施工概况 (1) 3施工部署 (1) 3.1施工现场条件 (1) 3.2主要工程数量 (2) 3.3施工总体部署 (2) 3.3.4施工进度安排 (9) 3.4施工资源配置 (9) 4临建施工 (10) 4.1施工流程 (10) 4.2项目驻地及民工院围挡 (11) 4.3项目驻地及民工院平整 (12) 4.4生活、办公区设施布置 (12) 5、质量保证措施 (16) 6、临建安全保证措施 (17) 7、施工现场文明施工 (18)

8、施工现场消防及交通保证措施 (20) 8.1消防保证措施 (20) 8.2维护交通措施 (20)

1编制依据及原则 1.1编制依据 (1)《施工现场临时建筑物技术规范》JGJ/T 188-2009 (2)《建设工程施工现场消防安全技术规范》GB 50720-2011 (3)《建设工程施工现场管理规定》中华人民共和国建设部令第15号 (4)《施工现场临时用电安全技术规范》JGJ46-2005 (5)《中铁上海工程局集团华海工程有限公司“职工小家”有形(标准化)建设指导手册》 (6)总包部下发南京地铁7号线部分标准化施工手册驻地及施工现场临建标准化手册 (7)本公司类似工程施工经验及本工程施工合同 (8)施工现场调查 1.2编制原则 (1)严格执行施工过程中涉及的相关规范、规程和技术标准。贯彻执行国家和地方政府的方针政策、法律法规。 (2)结合城市道路和可使用地块布置施工场地,对运输车辆的进出及走行线路合理规划,制定切实可行的交通组织方案。 (3)本着便民、利民的原则进行方案的选择,同时尽最大的可能为业主、周边环境、其他承包商提供方便。 (4)临时房屋及其他设施布置力求美观、安全、经济、合理、实用。

场地布置策划书

场地布置策划书 篇一:会场布置策划书 会场布置策划书 ——XX搜星大行动之人人乐平安夜 第一部分:概况 1. 会场布置主题:欢乐圣诞夜之梦想飞翔 2. 地点:南宁市太阳广场——人人乐超市新民店旁 3. 时间:XX年12月24 19:00—21:30 4. 主办单位:南宁星美文化艺术策划有限公司 5. 协办单位:南宁市人人乐超市新民店 6. 会场地形图: 7. 会场周边环境分析: 太阳广场地处新民路与民主路交汇处,为市中心二线地段,依托人人乐超市人流量较大。为使晚会得到市民最大的关注度和参与度我 们将在有限的会场内给观众创造更多的观看空间——我们将会场的观众区设置为固定观众区、流动观众区——使更多的走过路过的市民能在第一时间加入到我们的圣诞狂晚会中来。 第二部分:会场布置总体介绍 1. 会场布置创意: 会场布置遵从“欢乐圣诞”“放飞梦想”这两主题,其

中“放飞梦想”主题主要由幕布设计体现;“欢乐圣诞”则为会场布置的重点气氛营造。 2. 会场布置主色系——红色、绿色 为配合人人乐超市圣诞节店面装扮——人人乐超市此前已将超市店面设计为绿色系列的圣诞主题店面——因此这次会场布置的色系主要与绿色为主色调,打造一个绿色欢乐海洋的圣诞节会场。红色则代表着圣诞老人。 3. 会场布置分区: ①舞台区 ②评委席 ③观众区 ④工作区 会场分区地图: 第三部分:会场布置 1. 舞台设计: 舞台:长8米,宽6米,高米 舞台用红色地毯,在地毯上贴上白色的雪花做点缀。 用彩色气球条将舞台正面、舞台两侧、幕布两侧装饰——气球给人活跃的感觉,这样的装饰使得舞台看起来很喜庆。气球条是贴地面摆放。8+6+6+4+4=28米,一共需要28米长的气球条。

会场布置策划书

会场布置策划书 <2011年xxxxxx之人人乐春晚> 第一部分:概况 1.会场布置主题:生活路上总有人与你结伴而行 2.地点:xxx 3.时间:2011年1月24 4.主办单位:上海xxxxx 5.会场地形图:

第二部分:会场布置总体介绍 1.会场布置立意: 会场布置遵从“欢乐轻松”“热情洋溢”这两主题,通过各种装饰性饰物为会场营造重点气氛,烘托喜气洋洋的场面,同时促进内部互动性、为新一年度的工作奏响序曲。 2.会场布置主色系——红色、金色,绿色为辅助色 色系主要由红色为主色调,打造一个欢乐海洋的年会现场。 3.会场布置分区: 观众区 舞台区

第三部分:会场布置 1.舞台设计: 舞台:长7米,宽2.5米,高0.6米 舞台已有设备:投影仪,音响设备(音响的摆放根据实际情况具体分析); 初步设计: 1)用彩色气球条将舞台正面、舞台两侧、幕布两侧装饰——气球给人活跃的感觉,这样 的装饰使得舞台看起来很喜庆。 2)气球条的上层用绿色彩带环绕舞台正面,金色彩带装饰舞台侧面和舞台,会场顶部由 数个彩球衬托。 3)等各彩带装饰完毕,则用道具小雪花、贴纸等粘贴在彩带上或者周围为装饰到的地方。 ◆舞台背景: 使用气球制作KONYO形状(金色气球),外圈环绕圆形气球(绿色或蓝色相间),大小为2.5*2.5米,提前制作后然后粘贴于会场背景墙上,搭配各种饰物,例如霓虹灯,金色彩条,或者气球可以黏贴成的各种形状。 效果图: ◆舞台两侧横幅:

(10-12字之内的企业文化标语,体现公司文化或者此次活动主题) 舞台高度面: 使用七彩霓虹灯,闪烁交替,烘托舞台气氛,周围搭配气球制作的花瓣或者兔子形状,根据现场实际环境搭配 效果图:

施工场地布置方案

施工场地布置方案 This manuscript was revised by the office on December 10, 2020.

施工场地布置方案 一、场地布置的主要原则 1 布置根据 根据图纸、结合现场堪察情况,并考虑进度的总体安排,按照文明施工、安全生产的要求,对施工现场进行布置。现场的平面布置要考虑施工区域的划分、施工通道的布置、现场临时水电的布置、现场生产设施、现场办公以及生活区等内容,以保证现场生产的需要以及满足施工进度为前提。 2 布置原则 合理布置各项施工设施,科学规划施工道路,尽量降低运输费用。 科学确定施工区域和场地面积,尽量减少专业工种之间交叉作业。各项施工布置都要满足“有利于施工、方便生活、安全防火和环境保护”要求。 3. 施工总平面布置

施工围挡 进场后,视现场需要,必要时设立施工围挡,确保施工安全。施工现场便道 经现场踏勘,综合考虑本工程的现场条件,为保证车辆人员进出现场通畅,所需物资能及时运至现场。必要时在施工现场修建临时施工便道,并在适当位置设置出入口通道。 材料堆场、材料库房。 材料堆场 材料堆场要设在临近出入口的位置,材料堆放要整齐。 . 行政办公、施工区及临时设施的搭设 为满足现场施工需要,同时减小施工区对办公区的影响。现场内大致分为二个区,办公区,材料、机具堆码区。具体临设搭建要求为:

(1)本工程用工高峰期达220人左右。 (2)现场设置办公室,会议室,设置独立的厕所,单独设置进出的通道。 (3)办公室为开间4m,其进深为5m。 4. 施工给排水平面布置 本工程施工用水按甲方指定点碰头取水。现场内排水主要依地势走向。污水经沉淀排入市政管网。排水范围包括生活污水排放和施工生产污水排放。 5. 施工现场临电布置 本工程施工现场的电源位置由甲方及总包确定,供电现场供电线路按二个回路铺设,具体布置方式如下述: 施工现场临时用电量确定及各支线路电缆线确定 用电量的计算 本工程施工期间最大用电容量的确定以最高峰浇筑砼垫层和挡墙的施工阶段的施工用电量为准,这一期间投入较多的施工机械,应选择额定电容量为20KV⑴的配电房,方可满足现场施工用电要求。施工用电线路截面的确定:根据计算,查表得: ⑴、办公、照明导线选择4mm2⑵X 型铜芯绝缘线。 ⑵、机械用电:选择一根20 mm2的⑵X型铜芯绝缘线。 2011-12-25

现场平面布置及创意活动安排方案

泊岸别墅开盘活动现场布置及创意活动简介 1、现场布置平面示意 使用材质 : 铜制 乐器特色 : 音色丰富, 高音区介于单簧管和圆号间, 中音区犹如人声和大提琴音色, 低音区象大号和低音提琴.

萨克斯管(Saxophone)是一种管乐器,它的发明者是比利时乐器制作家-阿道夫.萨克斯(1814-1894) 根据当时欧洲盛行的波姆式长笛的发音原理,于1840年发明的一种既是木管乐器,又是铜管乐器的乐器。并以自己的名字命名,于1846年取得了专利。比利时人一直以此为自豪,甚至把萨克斯管印在钞票上。 此乐器用单簧片吹奏,开闭音孔的构造与双簧管差不多, 音域与双簧管相似, 应属木管乐器,但管体是铜制的又可属铜管乐器。它上细下粗音口向上,很像低音单簧管。从低音到高音有许多种萨克斯管,而且全是移调乐器。萨克斯管音色异常丰富迷人, 强吹奏时类似铜管,弱奏时类似木管,是一种管乐器类最好的合作伙伴。 法国作曲家比才、圣桑、威尔弟等都在自己的作品中使用了萨克斯管。萨克斯管又是爵士乐队小号乐队中不可缺少的乐器。 萨克斯管不但能出色地演奏古典音乐,而且更善于演奏爵士音乐、轻音乐,人们提到爵士乐时, 第一个想到的乐器便是萨克斯管。爵士乐的最大特点是即兴演奏,在演奏中使强弱拍倒置,采取连续切分音的手法, 使节奏变化无穷,音色上富有戏剧性,既激烈狂燥又安镑深沉,既滑稽又富于伤感。萨克斯管在音色上,在演奏滑音;颤音、吐音;超吹的特点方面,便适应了爵士乐即兴演奏的最大特点的需要。因此,即兴演奏也成为萨克斯管演奏者所追求的演奏特点。 乐器二:小提琴 小提琴不仅是管弦乐队中最重要的乐器,同样在室内乐,民谣乐,爵士乐等领域散发其迷人的魅力。因为它是多才多艺的, 既能唱出悠扬如诗般的曲调,又有时让人感到耳花缭乱。 小提琴属于弦乐器,音域至少三个八度,琴身由木材制成,琴弦则由纯钢制成。它的长度是多种多样的,但琴身常在36厘米左右。

现场总平面布置方案

C-17-006-3 深圳国际会展中心(一期)施工总承包工程 施工现场总平面布置方案 编制人: 审核人: 审批人: 中国建筑股份有限公司 年月日

施工现场总平面布置方案 目录 1 编制说明及依据 (1) 1.1 编制说明 (1) 1.2 编制依据 (1) 2 工程概况 (2) 2.1 工程总体概况 (2) 2.2 总平面布置现状 (3) 3 施工准备 (4) 4 总平面布置 (4) 4.1 布置原则 (4) 4.2 施工现场临建布置 (4) 4.3 专业设施、设备布置情况 (15) 4.4 场地交通组织概况 (16) 5 总平面管理 (17) 5.1 总平面管理计划 (17) 5.2 总平面供水和排水管理 (17) 5.3 总平面用电管理 (17) 5.4 施工用地管理 (18) 5.5 货物堆放定置管理 (18) 5.6 总平面布置管理 (18) 6 附件:各阶段总平面布置图 (19)

1编制说明及依据 1.1编制说明 本方案为现场总平面布置方案,施工现场临时设施的设计和布置均根据现场实际情况,充分考虑了对环境的影响、能源消耗、资源保护等方面,合理布置。其内容包括施工大门、围墙、出入口、现场办公区的设置,材料堆场、钢筋加工房、洗车池、地磅等配套设施的布置,场内交通组织情况及场内绿化等内容。 1.2编制依据 (1)《深圳国际会展中心(一期)工程施工组织设计》 (2)《深圳国际会展中心(一期)工程初稿施工图纸》 (3)《施工现场CI规范手册》(中国建筑股份制2010版) (4)《施工现场安全防护标准化图册》(ZJQ00-GL-029-2010) (5)《施工现场总平面布置图》 (6)《混凝土结构工程施工质量验收规范》(GB50204-2015)。 (7)《砌体结构工程施工质量验收规范》(GB50203-2011)。 (8)《水泥混凝土路面施工及验收规范》(GBJ97-87)

文明施工及场地布置方案

XXXXX项目 文明施工及场地布置专项 方案 XXXXX项目经理部 XXX年XX - 1 -

目录 1.工程概述········································································································ - 3 - 2.编制依据········································································································ - 3 - 3.安全文明施工·································································································· - 3 - 3.1文明施工组织机构设置 ············································································· - 3 - 3.2组织人员名单 ························································································· - 3 - 3.3组织人员职责 ························································································ - 4 - 3.4安全文明施工组织机构图 ·········································································· - 5 - 3.5联系方式 ······························································································· - 5 - 3.6安全文明施工管理措施 ············································································· - 6 - 3.6.1封闭管理······················································································· - 6 - 3.6.2施工场地 ······················································································ - 6 - 3.6.3材料堆放 ······················································································ - 6 - 3.6.4现场防火······················································································· - 7 - 3.6.5治安综合治理 ················································································ - 7 - 3.6.6施工现场标牌················································································· - 7 - 3.6.7宿舍管理 ······················································································ - 7 - 4.施工场地部署·································································································· - 7 - 4.1布置根据 ······························································································ - 7 - 4.2布置原则 ······························································································ - 7 - 4.2.1经济性原则: ··············································································· - 8 - 4.2.2实用性原则: ··············································································· - 8 - 4.2.3方便管理原则: ············································································ - 8 - 4.2.4安全性原则: ··············································································· - 8 - 4.2.5环保性原则: ··············································································· - 8 - 4.3、施工场地布置 ······················································································ - 8 - 4.3.1大门布置 ····················································································· - 8 - 4.3.2施工围挡 ····················································································· - 9 - 4.3.3施工现场便道 ··············································································· - 9 - 4.3.4、施工给排水平面布置 ···································································· - 9 - 4.3.5、施工现场临时用电布置 ································································· - 9 - 4.3.6、施工现场消防布置 ····································································· - 10 - 4.4临边防护、区域隔离围挡········································································ - 10 - 4.4.1大网片式工具化防护围栏 ······························································ - 10 - 4.4.2斜网片式工具化防护围栏 ······························································ - 11 - 4.5标示标牌 ···························································································· - 12 - 4.5.1安全警示标志 ············································································· - 12 - 4.5.2材料标识 ··················································································· - 12 - - 2 -

盾构施工场地临建布置方案

昆明轨道交通* **盾构区间临建方案 1.编制说明及依据 为高起点、高标准地建设好 * **盾构区间工程,按照总体施工方案的要求,根据昆明轨道交通有限公司及股份有限公司的相关管理标准及要求,编制了《昆明轨道交通 * **盾构区间临建方案》,以实现施工现场的标准化、规范化管理。 主要编制依据如下: (1)昆明地铁建设工程安全和文明工地标准; (2) 股份有限公司企业视觉识别系统管理手册; (3)昆明轨道交通3号线工程招标文件及投标文件; (4)施工设计图纸及其他收集的工程资料等。 2.工程概况 2.1区间概况 昆明市轨道交通3号线工程西标段起点石咀站,终点市体育馆站,线路沿春雨路、人民西路敷设,全长。 盾构区间施工 场地人民西路 春雨路 图2-1 **盾构区间位置示意图

昆明轨道交通3号线工程西标段 **盾构区间,区间工程起点为云南冶炼厂专有铁路线东侧的眠山站,沿人民西路向西南方向左拐,经过春雨路、昆瑞路和人民西路三路交汇处,进入春雨路, 并沿春雨路行进, 绕过大沙沟桥后抵达西山盐政管 理所东侧的马街站。 区间线路右线起止里程为YCK6+~YCK8+,长(含短链),左线为ZCK6+~ZCK8+,长(含长链)。全线长。 3驻地建设 **盾构区间项目经理部驻地建设 驻地建设分为现场驻地与经理部办公驻地,现场驻地主要用于现场管理人员住宿、工作,经理部驻地为生活区和办公区。 **盾构区间经理部办公及生活区租赁昌源中路路与石武客运专线交汇处的高新综合执法大楼5、6层。 图3-1 **盾构区间经理部办公楼位置示意图

图3-2 **盾构区间经理部办公楼外貌 图3-3 5楼宿舍区示、办公室示意图 图3-4 6楼办公室示意图 经理部办公区5层为生活区及会议室,6层为办公室。 图3-6 上墙制度图片 图3-5 大门门牌图片 图3-7 办公室布置 楼梯 电梯 经理办公室 厕所食堂 工程部、机电部等部门办公室 厕所 楼梯 天台 非项目部区域 非项目部区域 非项目部区域 财务部 合同部总工室 非项目部区域 楼梯 电梯 厕所厕所 楼梯 非项目部区域 非项目部区域 宿舍宿舍宿舍 宿舍 宿舍 宿舍 宿舍 会议室 洗漱间 ⑤

会场布置策划方案 全

会场布置策划书 第一部分:概况 1.会场布置主题:隆回县新型农村社会养老金首发仪式 2.地点:九龙广场 3.时间:2011年10月26日10:00—12:00 4.主办单位:中共隆回县委员会,隆回县人民政府 5.承办单位:县人力资源和社会保障局、县财政局、隆回县农村信用合作联 6.参会人员: 县领导:钟义凡、刘文成、周卫臣、王成华、陈历贤、 汪庆春、周玉祥、陈立君、周玉其、贺朝晖、 夏义中、贺元平; 试点领导小组及办公室成员: 彭南彪、李小宁、龙德平、罗崇灿、唐耀国、 庞运水、苏龙刚、陆丽凤、刘旭日、刘凯、 贺孝勇、刘光建、张剑波、胡国荣; 县经办机构:县农保站全体干部职工; 乡镇与会人员:桃洪镇全体镇村干部80余人、X村60周岁以上老人100人左右,周边村群众。 7.会场地形图:

九龙广场地形图 8.会场周边环境分析: 九龙广场地处县城中心地段,依托步步升超市人流量较大。为使本次仪式得到市民最大的关注度,我们将在有限的会场内给观众创造更多的观看空间——我们将会场的观众区设置为固定观众区、流动观众区——以便更多走过路过的市民参与我们的首发仪式。 第二部分:会场布置总体介绍 1.会场布置创意: 突出新型农村养老保险惠民主题 2.会场布置总色彩:红色 红色在中国代表富贵和吉祥,会场以红色为主色调,营造喜庆、热闹的会场氛围。 3.会场布置分区 ①主席台区 ②观众区 ③舞台区 ④工作区 会场分区示意图

主席台区 台阶鲜花区 1.主席台设计: 弧形,可用面直径X米,宽X米,高X米(两层台阶) 主席台用红色地毯铺设,设两排座位,桌面用米黄绒桌布铺盖,与鲜花相呼应。桌上摆放卡位和矿泉水。 在主席台的右前方放置一个发言席,台面置鲜花。 音响的摆放根据场地布置摆放。 主席台背景图设计待定。 2.台阶鲜花区 沿最外层弧形台阶摆盆栽鲜花,约20盆。里层台阶预留出老人代表站立位。 3.观众区

场地平面布置方案

常州市轨道交通1号线一期工程TJ-06标 茶山站一期场地布置方案 编制:周醒 审核: 审批: 中铁十一局集团有限公司 常州市轨道交通1号线一期工程TJ-06标项目经理部 二〇一五年四月

目录 一、工程概况 .................................................................... 错误!未定义书签。 二、现场平面布置原则.................................................... 错误!未定义书签。 三、施工现场布置............................................................ 错误!未定义书签。 3.1、工地围挡 ............................................................ 错误!未定义书签。 3.2、工地出入口 ........................................................ 错误!未定义书签。 3.3、施工场地硬化 .................................................... 错误!未定义书签。 3.4、场地排水 ............................................................ 错误!未定义书签。 3.5、现场设施及布置 ................................................ 错误!未定义书签。 3.6、机械配备及布置 ................................................ 错误!未定义书签。 3.7、现场临时用水主管道的选择及布置 ................ 错误!未定义书签。 3.8、现场临电、消防设施布置 ................................ 错误!未定义书签。 四、现场卫生 .................................................................... 错误!未定义书签。

场地布置规划方案

施工场地布置规划方案 本场地规划方案的编制是为南通兴东机场跑道沥青砼加盖工程施工场地营建提供系统的技术文件,藉此指导该营建工作的技术和施工管理,以确保优质、安全、快速、文明、地完成施工场地营建任务。 一、编制原则 1、安全第一的原则 本工程属于白天不停航夜间施工,必须确保飞行安全。在编制中始终按照技术可靠、措施得力、确保安全的原则确定施工规划方案。 2、优质高效的原则 加强领导,强化管理,优质高效。根据我们在施工组织设计中明确的质量目标,施工强化标准化作业,控制成本,降低工程造价。3、确保工期的原则 根据业主对本合同段得工期要求,编制科学的、合理的、周密的施工方案,合理安排进度,按网络控制,搞好工序衔接,实施进度监控,实现工期目标,满足业主的要求。 4、科学配置的原则 根据本合同段的工程量及各项管理目标的要求,在施工组织上按科学配置人员、设备,选派有施工经验的管理人员,专业化施工队伍施工。投入高效先进的施工设备,确保流动资金的周转使用,建设资金做到专款专用。选用优质材料,确保人、财、物、设备的科学合理配置。 5、合理用地的原则 从节省临时占地、满足施工需要、搞好排水、排污设备,认真实施科学施工、文明施工等多角度出发,合理安排生产、生活场地、房屋布置。工程完成后,及时清理、平整、恢复场地。 6、保障有力的原则 制定周密详细的工期保证措施。如雨季、节假日施工措施、物资设备保证措施、劳动力保障措施等。有力的保障施工的正常进行。7、协调一致的原则 在施工全过程中,将服从业主、监理、设计的统一协调,听从业主、监理、设计的指令,并确保指令得到有效的实施。 二、施工特点 本工程属于白天不停航夜间施工,必须确保飞行安全,工期较紧,

会场布置方案

会场布置方案 1、会场布置主题:*****舞会之蓝色海洋 2、地点:**** 3、时间:**** 4、主办单位:***** 5、协办单位:***** 6、会场地形图: 第二部分:会场布置总体介绍 1、会场布置创意:会场布置遵从“一半是海洋,一半是天堂”的主题,其中“一半是海洋”的主题主要由外围通道的布置设计来体现;“一半是天堂”则是舞会的主会场所营造的气氛。 2、会场布置主题色----白色、蓝色 为配合****的主题思想,因此采用蓝色作为引入色调,将到场来宾引

入一个蓝色海洋的氛围中,既有高雅的感受,又有宁静的氛围;而白色则作为主会场的主题色,将到场来宾从蓝色海洋的环境中带入到一个祥和、轻松、愉快的氛围中去,白色即代表了天空中的云,也代表了本次舞会将给各位来宾天堂般的享受。 3、会场布置分区: 1、迎宾区; 2、*****文化展示; 3、海蓝通道; 4、礼仪或行为艺术; 5、嘉宾休息区; 6、舞池; 7、道具及餐饮供应区 第三部分:会场布置 1、迎宾区设计:迎宾区域由气球拱门,横幅,地毯构成,由礼仪或行为艺术表演者担任,红色的地毯配合着白色的灯光,在到场嘉宾走过气球拱门时,给到场来宾一种受人尊敬或耳目一新的感觉。 2、会场通道设计:通道前将有一小段****的展示区域,让到场 来宾切实体会到半山半岛的文化;红色的地毯将铺至海蓝通道前,

进入由透明塑料板加上透明蓝色贴纸和灯光特效配合制作而成的海蓝通道,再加上轻微的海浪声效,使来宾犹如身临海洋之中。 通道尽头是一面带有半山半岛标志的面板,将通道与舞会会场隔开。 3、舞会会场设计:舞会会场是整个活动中的主体,会场将用白色的小灯缠绕在舞池中的4颗椰子树上,会场中还将用500个乳白色的气球和彩带进行舞池外围地面、休息区、以及植物上的排布,给每一个宾客营造一个犹如身在云端的感觉。 4、舞池设计:舞池周边将用白色的灯光从四周打出,再用乳白色的气球配合灯光营造出中如在云端的视觉效果。在舞池的尽头(即7号区域处)将安置一个小型舞台。 舞台:长3米,宽2米,高0.3米; 舞台后面是一块由蓝色和白色拼凑而成的背景墙,舞台上将放置1个具有半山半岛特色的易拉宝,舞台周边将用1-2台泛光灯打亮舞台,再加上气球条环绕,将舞台打造出云朵般的效果。 舞台下方将放置部分甜点鲜花等装饰,在舞池周边的椰子树后将分成冷餐区和酒水区两个区域,区域周边靠近舞台的地方可放置少量宣传用品。 5、休息区设计:在2个休息区内分别放置6张桌子,每张桌子配3-4把椅子共40个座位。休息区内桌子需适度密集,在休息区内需用少量白色彩灯布置照亮道路,区域内备上一些蜡烛灯,在来宾聊天休息之余可以点燃,以营造一种安逸,温馨的氛围。

场地布置方法

精心整理成都地铁四号线六标场地规划施工方案 一、施工场地布置原则 根据施工项目、施工方案和周围环境,本着“节约用地,施工必需”的原则进行临时工程布设,并注意环境保护和水土保持工作。对于成都地铁4号线一期工程土建6标场地布置,我们遵循以下几点原则: (1 (2 (3 (4 (5 (6 (7 (8 ( (2 (3 (4 成都地铁4号线土建6标区间包含骡马市站~太升路站~省文联站两个区间,区间总长3199.319m。其中骡马市站~太升路站区间,起止里程为YDK29+617.444~YDK30+488.600,右线长871.156m,左线长878.411m。区间线路曲线半径R=400m,最大线间距15m,线路在该区间线间距由15m过渡到13m。线路最大埋深16.6m,最小坡度2‰(站坡度2‰),最大坡度7‰。太升路站~省文联站区间,起止里程为YDK30+674.700~YDK30+902.340,YDK30+933.363~YDK31+430.949,右线长725.226m,左线长724.526m。区间线路最小曲线半径R=400m,最大线间距15.0m,线路在该区间线间距由13m过渡到15m。线路最大埋深16.35m,最小坡度2‰(站坡度2‰),最大坡

度5‰;太省区间设置盾构风机房。主要施工布置在太升路站实现。 骡马市站 太升路站省文联站通风井878.411m 871.156m 494.190m 497.586m 230.336m 227.640m 四、施 工现场平面布置 6标段按招标文件提供的场地,和施工计划安排在太升路站进行场地布置,由于施工场地作业1C252、布2.5米,34512底) 6识,7却塔设置在水箱上方。 8、轨道梁:轨道梁采用现场目前的轨道基础,(充分满足施工要求) 9、拌和站:拌和站设置在中板位置,施工材料放置在车站顶板和拌和站同侧的位置方便下料。 10、水塔:方便施工场地内用水不间断,特意在施工现场设置水塔水塔采用钢板焊接长宽高分别为3*2.5*2.5(详见加工技术交底) 11.、大门设置:场地内大门严格按照标准制作,上面喷刷有企业标识和宣传字样。

钢筋场地布置具体施工方案

沪昆客运专线HKJX-3标项目经理部 钢筋加工场施工方案 编制: 复核: 审核: 中交隧道局沪昆客运专线三标项目经理部一分部 2010年6月9日

钢筋加工场施工方案 一、编制原则 1、钢筋加工场应按照“因地制宜,综合利用”的原则复垦。 2、符合国家强制性标准、业主和本局项目标准化等相关管理办法规定。 3、钢筋加工场建设规模应符合施工使用要求,具备足够的原材料及半成品存放空间。 4、钢筋加工场建设应体现符合标准、节约用地、节省投资、环保节能、合理实用的原则。 二、编制依据 1、根据中交隧道局沪昆项目客专三标项目部钢筋加工场建设标准。 2、根据管段工程施工进度计划控制。 3、管段内桥梁、路基施工组织设计。 三、钢筋场选址 根据施工进度和工程量情况,共设置8个钢筋加工场,具体情况见下表:

1#钢筋场位于DK431+700线路的右侧,靠近滨江前沿的乡村水泥路,为山林地。主要负责童家塘大桥与山背特大桥的钢筋加工制作任务,距离童家塘大桥桥尾500米,距离山背特大桥桥头200米。 2#钢筋场位于DK434+600线路的右侧,为山林地。主要负责桥背特大桥的钢筋加工制作任务。 3#钢筋场相对线路里程为DK440+100,线路左侧20m,占地约8亩,成品供应范围为DK437+200~DK440+700,包括桩基、承台、墩身钢筋。 4#钢筋加工场满足首开工点要求,设在鹰东大道西侧,相对线路里程为DK441+450,靠近线路右侧红线,占地约5亩,成品供应范围为DK440+700~DK441+550,包括桩基、承台、墩身、鹰东大道立交特大桥(40+64+40)m连续梁钢筋。 5#钢筋加工场相对线路里程为DK446+400,靠近线路右侧红线,占地约8亩,成品供应范围为DK444+226~DK446+647,包括桩基、承台、墩身、鹰潭信江特大桥(72+3×116+72)m连续梁钢筋。 6#钢筋加工场设在鹰潭信江特大桥西岸,相对线路里程为DK447+150,靠近线路右侧红线,占地约8亩,成品供应范围为DK446+647~DK449+100,包括桩基、承台、墩身、鹰潭信江特大桥(72+3×116+72)m连续梁钢筋。 7#钢筋加工场相对线路里程为DK450+000,靠近线路右侧,占地约5亩,成品供应范围为DK449+100~DK452+000,包括桩基、承台、墩身。 8#钢筋加工场相对线路里程为DK452+000,设在线路右侧,占地约5亩,成品供应范围为DK452+000~DK453+000,包括桩基、承台、墩身。 四、工程进度控制 为满足架桥机按期通过,鹰东特大桥必须首先开工,提前完成线下工程,鹰潭信江特大桥为全标段控制性工程、重难点项目,按照工期,必须抢先施工赶上进度。 ⑴鹰东大道立交特大桥 钻孔桩基础:2010年6月1日~2011年2月28日 承台基础:2010年7月20日~2011年3月31日 桥梁墩(台)身:2010年8月1日~2011年4月30日 ⑵鹰东大道立交特大桥(40m+64m+40m连续梁) ①主墩(2个) 钻孔桩基础:2010年6月1日~2010年7月20日 承台基础:2010年7月21日~2010年8月10日