自流系统装车工艺计算

自流系统装车工艺计算
自流系统装车工艺计算

油库设计与管理

题目自流系统装车工艺计算专业年级储运1302级

指导教师宋晓琴

姓名学号

1程序变量声明

1.1鹤管变量

鹤管内径d1,长度l1,总根数n,流速v1()、v1(n), 假设的摩阻系数λ1()、λ1(n), 雷渃数Re1()、Re1(n), 相对粗糙度ξ1()、ξ1(n), 计算的摩阻系数λ10()、λ10(n),划界雷渃数 Re11()、Re11(n), 划界雷渃数Re12()、Re12(n),第一根鹤管的假设流量q,每根鹤管流量qq(j,i)

1.2集油管变量

集油管内径d2,长度l2, 流速v2 ()、v2(n), 摩阻系数λ2()、λ2(n), 雷渃数Re2()、Re2(n), 相对粗糙度ξ2()、ξ2(n),划界雷渃数 Re21()、Re21(n), 划界雷渃数Re22()、Re22(n),总的摩阻损失hl

1.3 输油管变量

输油管内径d0,长度l0, 流速v0,假设的摩阻系数λ0,雷渃数Re0,相对粗糙度ξ0,划界雷渃数 Re01, 划界雷渃数Re02,平均流量Qe

1.4 储油罐变量

储油罐直径D,液位初始高度z1,发油后高度z2,第一根鹤管流量下所对应的液位高度z(j)1.5 其他变量

发油量V,油品黏度ν,管道绝对粗糙度Δ,油罐出口与鹤管出口间的高差H0

2、程序代码

2.1 窗体设置程序

Private Sub Form_Load()

Label14.Visible = False

Text13.Visible = False

Text15.Visible = False

If Text12.Text = 12 Then

Label14.Visible = True

Text13.Visible = True

Text15.Visible = True

Text14.Visible = False

End If

End Sub

2.2 第一根鹤管流速v1(1)和λ1(1)的计算

Private Sub Command1_Click()

Dim v1() as single, λ1() as single, Re1() as single, ξ 1 as single(), λ10() as single, Re11() as single, Re12() as single, v2() as single, λ2() as single, Re2() as single, ξ2() as single, Re21() as single, Re22() as single

Dim Q0(20000), z(20000), qq(20000, 30) As Single

ν = Val(Text1.Text): ν = ν * 10 ^ -6

Δ = Val(Text2.Text): Δ = Δ * 10 ^ -3

n = Val(Text3.Text)

d1 = Val(Text4.Text): d1 = d1 * 10 ^ -3

l1 = Val(Text5.Text)

l2 = Val(Text6.Text)

d2 = Val(Text7.Text): d2 = d2 * 10 ^ -3

d0 = Val(Text8.Text): d0 = d0 * 10 ^ -3

l0 = Val(Text9.Text)

D = Val(Text10.Text)

H0 = Val(Text11.Text)

z1 = Val(Text12.Text)

V = Val(Text13.Text)

ReDim v1(n), λ1(n), Re1(n), ξ1(n), λ10(n), Re11(n), Re12(n), v2(n), λ2(n), Re2(n), ξ2(n), Re21(n), Re22(n)

π = 3.14

For q = 0.000001 To 0.02 Step 0.00001

v1(1) = 4 * q / (π * d1 ^ 2)

Re1(1) = v1(1) * d1 / ν

ξ1(1) = 2 * Δ / d1

Re11(1) = 59.7 / (ξ1(1) ^ (8 / 7))

Re12(1) = (665 - 765 * (Log(ξ1(1)) / Log(10))) / ξ1(1)

If Re1(1) <= 2000 Then

λ1(1) = 64 / Re1(1)

ElseIf Re1(1) > 2000 And Re1(1) < 3000 Then

λ1(1) = 0.16 / Re1(1) ^ 0.25

ElseIf Re1(1) >= 3000 And Re1(1) <= Re11(1) Then

λ1(1) = 0.3164 / Re1(1) ^ 0.25

ElseIf Re1(1) > Re11(1) And Re1(1) <= Re12(1) Then

λ1(1) = (1.8 * Log(6.8 / Re1(1) + (ξ1(1) / 7.4) ^ 1.11) / Log(10)) ^ -2 ElseIf Re1(1) > Re12(1) Then

λ1(1) = 1 / (1.74 - 2 * Log(ξ1(1)) / Log(10)) ^ 2

End If

2.3 第一根集油管流速v2(1)和λ2(1)的计算

v2(1) = 4 * q / (π * d2 ^ 2)

Re2(1) = v2(1) * d2 / ν

ξ2(1) = 2 * Δ / d2

Re21(1) = 59.7 / (ξ2(1) ^ (8 / 7))

Re22(1) = (665 - 765 * (Log(ξ2(1)) / Log(10))) / ξ2(1)

If Re2(1) <= 2000 Then

λ2(1) = 64 / (Re2(1))

ElseIf Re2(1) > 2000 And Re2(1) < 3000 Then

λ2(1) = 0.16 / Re2(1) ^ 0.25

ElseIf Re2(1) >= 3000 And Re2(1) <= Re21(1) Then

λ2(1) = 0.3164 / Re2(1) ^ 0.25

ElseIf Re2(1) > Re21(1) And Re2(1) <= Re22(1) Then

λ2(1) = (1.8 * Log(6.8 / Re2(1) + (ξ2(1) / 7.4) ^ 1.11) / Log(10)) ^ -2 ElseIf Re2(1) > Re22(1) Then

λ2(1) = 1 / (1.74 - 2 * Log(ξ2(1)) / Log(10)) ^ 2

End If

2.4 第i根鹤管流速v1(i)和λ1(i)的计算

For i = 2 To n

λ1(i) = 0.001: g = 9.8

Do

v1(i) = Sqr((v1(i - 1) ^ 2 / (2 * g) + λ1(i - 1) * l1 * v1(i - 1) ^ 2 / (d1 * 2 * g) + λ2(i - 1) * l2 * v2(i - 1) ^ 2 / (d2 * 2 * g)) / (1 / (2 * g) + λ1(i) * l1 / (d1 * 2 * g)))

λ1(i) = λ1(i) + 0.001

Re1(i) = v1(i) * d1 / ν

ξ1(i) = 2 * Δ / d1

Re11(i) = 59.7 / (ξ1(i) ^ (8 / 7))

Re12(i) = (665 - 765 * (Log(ξ1(i)) / Log(10))) / ξ1(i)

If Re1(i) <= 2000 Then

λ10(i) = 64 / Re1(i)

ElseIf Re1(i) > 2000 And Re1(i) < 3000 Then

λ10(i) = 0.16 / Re1(i) ^ 0.25

ElseIf Re1(i) >= 3000 And Re1(i) <= Re11(i) Then

λ10(i) = 0.3164 / Re1(i) ^ 0.25

ElseIf Re1(i) > Re11(i) And Re1(i) <= Re12(i) Then

λ10(i) = (1.8 * Log(6.8 / Re1(i) + (ξ1(i) / 7.4) ^ 1.11) / Log(10)) ^ -2 ElseIf Re1(i) > Re12(i) Then

λ10(i) = 1 / (1.74 - 2 * Log(ξ1(i)) / Log(10)) ^ 2

End If

Loop While (Abs(λ1(i) - λ10(i)) > 0.001)

2.5 第i根集油管流速v2(i)、λ2(i)和每根鹤管流量qq(j, i)的计算

v2(i) = (d1 ^ 2 * v1(i) + d2 ^ 2 * v2(i - 1)) / d2 ^ 2

Re2(i) = v2(i) * d2 / ν

ξ2(i) = 2 * Δ / d2

Re21(i) = 59.7 / (ξ2(i) ^ (8 / 7))

Re22(i) = (665 - 765 * (Log(ξ2(i)) / Log(10))) / ξ2(i)

If Re2(i) <= 2000 Then

λ2(i) = 64 / (Re2(i))

ElseIf Re2(i) > 2000 And Re2(i) < 3000 Then

λ2(i) = 0.16 / Re2(i) ^ 0.25

ElseIf Re2(i) >= 3000 And Re2(i) <= Re21(i) Then

λ2(i) = 0.3164 / Re2(i) ^ 0.25

ElseIf Re2(i) > Re21(i) And Re2(i) <= Re22(i) Then

λ2(i) = (1.8 * Log(6.8 / Re2(i) + (ξ2(i) / 7.4) ^ 1.11) / Log(10)) ^ -2 ElseIf Re2(i) > Re22(i) Then

λ2(i) = 1 / (1.74 - 2 * Log(ξ2(i)) / Log(10)) ^ 2

End If

j = q * 1000000

qq(j, i) = 1 / 4 * π * d1 ^ 2 * v1(i)

Next i

2.6 输油管流量Q0(j)、流速v0和λ0的计算

Q0(j) = 1 / 4 * π * d2 ^ 2 * v2(n) * 2

V0 = 4 * Q0(j) / (π * d0 ^ 2)

Re0 = V0 * d0 / ν

ξ0 = 2 * Δ / d0

Re01 = 59.7 / (ξ0 ^ (8 / 7))

Re02 = (665 - 765 * (Log(ξ0) / Log(10))) / ξ0

If Re0 <= 2000 Then

λ0 = 64 / Re0

ElseIf Re0 > 2000 And Re0 < 3000 Then

λ0 = 0.16 / Re0 ^ 0.25

ElseIf Re0 >= 3000 And Re0 <= Re01 Then

λ0 = 0.3164 / Re0 ^ 0.25

ElseIf Re0 > Re01 And Re0 <= Re02 Then

λ0 = (1.8 * Log(6.8 / Re0 + (ξ0 / 7.4) ^ 1.11) / Log(10)) ^ -2

ElseIf Re0 > Re02 Then

λ0 = 1 / (1.74 - 2 * Log(ξ0) / Log(10)) ^ 2

End If

2.7 所需油罐液位高度z(j)的计算

For i = 1 To n

hl = hl + λ2(i) * l2 * v2(i) ^ 2 / (d2 * 2 * g)

Next i

z(j) = λ0 * l0 * V0 ^ 2 / (d0 * 2 * g) + hl + λ1(1) * l1 * v1(1) ^ 2 / (d1 * 2 * g) + v1(1) ^ 2 / (2 * g) - H0

Next q

2.8 插值法找到初始液位高度z1与发油后的液位高度z2下所对应的第一根鹤管的流量

A = 1 / 4 * π * D ^ 2

j = 1

Do While (Abs(z(j) - z1) > 1)

j = j + 1

Loop

j1 = j

If Text12.Text =12 Then

z2 = z1 - V / A

j = 1

Do While (Abs(z(j) - z2) > 1)

q2=j2/1000000

j = j + 1

Loop

j2 = j

2.9 平均流量与装车时间的计算

For j = j1 To j2 Step -1

Qz = Q0(j) + Qz

Next j

Qe = Qz / (j1 - j2)

T = V / Qe

T = T / 3600

End If

2.10 程序的输出

Text14.Text = "鹤管编号鹤管流量(m3/s)" & vbCrLf & Space(3)

For i = 1 To n

Text14.Text = Text14.Text & Format(i, "00") & Space(6) & Format(qq(j1, i), "0.000000") & vbCrLf & Space(3)

Next i

Text15.Text = "装车时间:" & vbCrLf & "T=" & Format(T, "0.00") & "小时" End Sub

3、运行界面

3.1鹤管数20、液位高度为3m时所对应的各鹤管流量

3.2 鹤管数30、液位高度10m时所对应的各鹤管流量

3.3 鹤管数为30,发油量为1500m3,开始发油时液位高度为12m所对应的发油时间

火车装卸作业安全操作规程

仅供参考[整理] 安全管理文书 火车装卸作业安全操作规程 日期:__________________ 单位:__________________ 第1 页共8 页

火车装卸作业安全操作规程 (一)主题内容与适用范围 本规程规定了火车装卸作业的安全操作内容、方法及标准要求。 本规程适用于xx(集团)有限公司各装卸公司。 (二)内容、方法及标准要求 1开关车门 1.1车未停稳、脱钩,禁止人员上车、打车门或进行其它作业。 1.2打车门前,要认真检查车门销子、挂钩等是否牢固。 1.3打车门时,要用打门锤或铁撬,禁止用石块或其它块状物。 1.4车上装有块状物或小袋物,打车门时要闪在门子侧面,打开车门销子后,先把车门活动几次,确认无滚落物后再开启车门。 1.5拉车门时要用拉门绳,拉门绳要在门爪上缠绕牢固后再拉,车上、车下人员要配合好。 1.6拉开的车门(小门),要用两个卡子分开卡牢,不能用卡子的要用车门挂钩或其它办法固定牢。 1.7开、关车门时,车上人员应站在开关的车门两侧不少于0.15 米的地方;车下人员应闪开。 1.8放车门子前,要先招呼“闪开人”,确认人员闪开后,挨个依次放门,严禁两侧车门对着放。 1.9棚车开、关车门,要认真检查车门滚轮与轨道是否正常,确认无误后方可开关。开关时,人要站在车门两侧,严禁正面站人,以防车门掉下伤人。如有滑道失灵或其他故障,要检查分析原因,严禁硬砸硬别。 1.10棚车开、关车窗,要一手提车窗,一手拿木棍,当触开销子, 第 2 页共 8 页

车窗稍有下落时,应迅速将手撤回。 1.11关闭各种车门,手要闪开门口沿。2火车装卸 2.1作业前,要检查车厢底有无漏洞,是否装过危险品等,有危险因素要采取措施消除,并报告现场调度员。 2.2上下车厢要走车梯,要抓牢踏稳。盖篷布的车,尤其要注意上下安全。禁止爬车跳车,禁止跨越相邻车厢,禁止在车帮上站、坐、行走。 2.3使用的工具等,车上车下要传递,不准向车上车下乱扔。 2.4装卸车作业过程中车厢周围不准有人停留。 2.5装车时,应设专人指挥;吊钩上车前,人员应事先闪开钩行路线,停钩后再上前扶勾。 2.6装货出车厢时,货物要摆放整齐;使用手钩时要挂牢;拉篷布时要抓紧,用力要均匀,脚要站稳踏实,防止坠车。 2.7使用抓斗、斗式装载机等装散货火车时,车厢内不准有人。指挥人员必须确认车厢内无人,方可指挥装车,严禁站、坐在车帮上指挥。 2.8火车装卸长大五金,车厢内不准有人。并且要注意做到: 2.8.1装卸车前要打开中门。 2.8.2超过6米长(不包括6米)的要拴稳绳牵拉装车。 2.8.3货勾落入车厢放稳后,方可进车厢摘钩。 2.8.4摘钩人员离开车厢后,方可指挥起重机缓慢抽吊捆索。 2.8.5装车时,指挥手不准站在火车帮上或梯子上指挥。 2.9火车卸生铁或其它块状物时应注意: 2.9.1作业人员应穿好防护皮鞋。 2.9.2从车内向车下卸生铁时,要注意车上、车下人员的活动情况, 第 3 页共 8 页

水平输气干线工艺设计(末端储气)

重庆科技学院 《管道输送工艺》 课程设计报告 学院:_ 石油与天然气工程学院_ 专业班级:油气储运工程 学生姓名:学号: 设计地点(单位)________ 石油科技大楼K704 _____ ___ __设计题目:______ _水平输气干线工艺设计(末端储气)____ _ ___ 完成日期:年月日 指导教师评语: ___________ ___________ _________________ __________________________________________________________________________________ __________________________________________________________________________________ _____________________________________ __________ _ 成绩(五级记分制):______ __________ 指导教师(签字):________ ________

目录 摘要..................................................................... I 1 总论. (1) 1.1 设计依据及原则 (1) 1.1.1设计依据 (1) 1.1.2 设计原则 (1) 1.2 总体技术水平 (1) 2 工程概况 (3) 3 输气管道工艺计算 (4) 3.1 末端管道规格 (4) 3.1.1 天然气相对分子质量 (4) 3.1.2 天然气密度及相对密度 (4) 3.1.3 天然气运动粘度 (4) 3.2 管道内径的计算 (5) 3.3 确定管壁厚度 (5) 3.4 确定管道外径及壁厚 (6) 3.5末段长度和管径的确定原则 (7) 3.6 末段最大储气能力的计算 (8) 4 结论 (10) 参考文献 (11)

典型超纯水工艺流程设计方案

典型超纯水工艺流程设 计方案 集团标准化小组:[VVOPPT-JOPP28-JPPTL98-LOPPNN]

1纯化水工艺设计方案:(产水水质标准达到的标准:中国药典2005版纯化水标准) 自来水→预处理→一级反渗透→一级EDI→UV杀菌→超滤除热原设备→用水 自来水→预处理→一级反渗透→二级EDI→UV杀菌→超滤除热原设备→用水 2注射用水工艺设计方案:(产水水质标准达到的标准:中国药典2005版注射用水标准) 自来水→预处理→一级反渗透→一级EDI→微滤→多效蒸馏除热原设备→用水 自来水→预处理→一级反渗透→二级EDI→微滤→超滤除热源设备→用水 3电厂高压锅炉给水工艺设计方案(产水水质标准达到的标准:工业锅炉水质GB1576-2001) 自来水→预处理→一级反渗透→脱气装置→二级EDI→微滤→用水 自来水→预处理→一级反渗透→脱气装置→PH调节→二级反渗透→一级EDI→微滤→用水 4微电子/半导体级超纯水工艺设计方案(产水水质标准达到的标准:中国电子工业部高纯水水质试行标准) 自来水→预处理→一级反渗透→脱气装置→二级EDI→UV杀菌装置→超滤→用水 自来水→预处理→一级反渗透→脱气装置→PH调节→二级反渗透→一级EDI→抛光混床→UV杀菌装置→超滤→用水 5实验室用分析级纯水工艺设计方案(产水水质标准达到的标准:分析级实验室用水标准 GB6682-2000) 自来水→预处理→一级反渗透→二级EDI→UV杀菌装置→超滤→用水 自来水→预处理→二级反渗透→一级EDI→UV杀菌装置→超滤→用水 进水电导率在400~1000μs/cm的含EDI设备的典型超纯水工艺流程设计方案 1纯化水工艺设计方案:(产水水质标准达到的标准:中国药典2005版纯化水标准) 自来水→预处理→一级反渗透→二级EDI→UV杀菌→微滤→用水 自来水→预处理→一级反渗透→脱气装置→PH调节→二级反渗透→一级EDI→UV杀菌→微滤→用水 2注射用水工艺设计方案:(产水水质标准达到的标准:中国药典2005版注射用水标准) 自来水→预处理→二级反渗透→一级EDI→多效蒸馏除热源设备→用水 自来水→预处理→一级反渗透→二级EDI→UV杀菌装置→超滤除热源设备→用水 3电厂高压锅炉给水工艺设计方案(产水水质标准达到的标准:工业锅炉水质GB1576-2001) 自来水→预处理→一级反渗透→脱气装置→PH调节→二级反渗透→一级EDI→混床→微滤→用水自来水→预处理→一级反渗透→脱气装置→二级EDI→微滤→用水 4微电子/半导体级超纯水工艺设计方案(产水水质标准达到的标准:中国电子工业部高纯水水质试行标准) 自来水→预处理→一级反渗透→脱气装置→二级EDI→抛光混床→UV杀菌装置→超滤→用水

火车售票系统用户手册

火车售票系统 用 户 手 册 作者:何艳娟 2013年11月

目录 1.引言 (1) 1.1编写目的 (1) 1.2项目背景 (1) 1.3定义 (1) 1.4参考资料 (1) 2.软件概述 (2) 2.1目标 (2) 2.2功能 (2) 2.3性能 (2) 3.运行环境 (3) 3.1硬件 (3) 3.2支持软件 (3) 4. 使用说明 (3) 4.1安装和初始化 (3) 4.2输入输出 (4) 4.3出错和恢复 (8) 4.4求助查询 (8) 5. 运行说明 (8) 5.1运行表 (8) 5.2运行步骤 (8) 5.3操作信息 (9) 6. 非常规过程 (10) 7. 操作命令 (10) 8. 相关文件 (11)

1.引言 1.1编写目的 本文档是为了使用户能更清晰地使用该系统软件而编写的,主要包括用户的一些操作界面及使用方法。使用户更全面的了解本软件的作用。主要读者是软件的用户。 1.2项目背景 火车票出售管理系统是典型的信息管理系统(MIS),其开发主要包括后台数据库的建立和维护以及前端应用程序的开发两个方面。本项目适用于Windows操作系统,使用My SQL 数据库,利用JAVA开发平台开发系统。 1. 所建议开发软件的名称:火车票售票管理系统 2. 实现软件的单位:湖南安全技术职业学院 1.3定义 用户名:使用此系统的用户登录时所使用的邮箱帐号 查询:供用户查询列车时刻的详细信息 售票:用户根据旅客需求,为旅客提供售票服务 退票:用户根据票务信息进行退票 1.4参考资料 1.GB8567-88 .软件设计文档国家标准——可行性研究报告 2.吴建、郑潮、汪杰. 《UML基础与Rose建模案例》 . 人民邮电出版社 3.张海藩 .《软件工程导论》(第四版).清华大学出版社 4.车站售票管理系统—概要设计说明书 5.车站售票管理系统—详细设计说明书 6.车站售票管理系统—项目开发计划

输气工艺计算.

输气管道工艺计算 第一节 管内气体流动的基本方程 1.1气体管流基本方程 气体在管内流动时,沿着气体流动方向,压力下降,密度减少,流速不断增大,温度同时也在变化。在不稳定流动的情况下,这些变化更为复杂。描述气体管流状态的参数有四个:压力P 、密度ρ、流速v 和温度T 。为求解这些参数有四个基本方程:连续性方程、运动方程、能量方程和气体状态方程。 1、连续性方程 连续性方程的基础是质量守恒定律。科学实践证明,在运动速度低于光速的系统中,质量不能被创造也不能被消灭,无论经过什么运动形式,其总质量是不变的。气体在管内流动过程中,系统的质量保持守恒。 对于稳定流,常用的连续性方程为: 常数=vA ρ 或 222111A v A v ρρ= 2、运动方程 运动方程的基础是牛顿第二定律。也就是控制体内流体的动量改变等于作用该流体上所有力的冲量之和:即 ()τd N mv d i ∑= 式中:()mv d ——动量的改变量; τd N i ∑——流体方向上力的冲量 稳定流常用的运动方程为: 02 2 =+++ρλρρv D dx ds g dx dv v dx dP 3、能量方程 能量方程的基础是能量守恒定律。根据能量守恒定律,能量既不能被创造,也不能被消灭,而是从一种形式转变为另一种形式,在转换中能量的总量保持不变。对任何系统而言,各项能量之间的平衡关系一般可表示为: 进入系统的能量-离开系统的能量=系统储存能的变化。 稳定流常用的能量方程为:

dx dQ dx ds g dx dv v dx dp p h dx dT T h T p -=++???? ????+??? ???? 4、气体状态方程 ZRT PV = ZRT P ρ= 由连续性方程、运动方程、能量方程、气体状态方程组成的方程组可以用来求解管道中任一断面和任一时间的气体流动参数压力P 、密度ρ、流速v 和温度T 由于这是一组非线性偏微分方程一般情况下没有解析解,因而只能在一定条件下以简化、线性化和数值化的方法求得近似解。 1.2稳定流动的气体管流的基本方程 为了简化上述方程组,假设: (1) 气体在管道中的流动过程为等温流动,即温度不变,T 为常数。 (2) 气体在管道中作稳定流动,即在管道的任一截面上,气体的质量流量M 为一常数, 也就是说气体的质量流量不随时间和距离的改变而改变,常数==vA M ρ。 等温流动则认为温度T 已知,实际上是采用某个平均温度,这样就可以在方程组中除去能量方程,使求解简化;稳定流动则可从运动方程和连续性方程中舍去随时间改变的各项。 这样的假设和简化对输气管,特别是长距离输气管可以认为是基本相符的。 稳定流动的运动方程: 02 2 =+++ρλρρv D dx ds g dx dv v dx dP 两边乘以dx ,并用 22 dv ρ 代替 2vdv ρ 整理后得: 2 22 2dv gds v D dx dP ρρρλ++=- 或: 2 222dv gds v D dx dP ++=-λρ (2-1) 式中: P ——压力,Pa ; ρ——气体得密度,㎏/m3; λ ——水力摩阻系数;

反渗透设备原理,反渗透水处理系统工程工艺流程

奥凯〖反渗透设备〗概述; Okay reverse osmosis water treatment equipment(inverse)with high selectivity for reverse osmosis membrane element desalination rate can be high up to99.7%.So the choice of high salt rejection rate,low osmotic pressure,high flux membrane, can be the most salt ions removal from water. Ro(reverse osmosis)is a kind of pressure driven by a semipermeable membrane, the selection of interception function,the solution of the solute and solvent separation separation method.They are widely used in various liquid separation and concentration.Water treatment process,water,inorganic ion,bacteria,virus, organic matter and colloid and other impurities are removed,to obtain a high quality water. 奥凯反(逆)渗透水处理设备采用选择性较高的反渗透膜元件除盐率可以高达99.7%。所以选择脱盐率高,低渗透压力,高通量的膜,可以将水中的大部分的盐离子去除。 反渗透(逆渗透)是一种在压力驱动下,借助半透膜的选择截留作用,将溶液中的溶质与溶剂分开的分离方法。目前被广泛的应用于各种液体的分离与浓缩。水处理工艺中,将水中无机离子、细菌、病毒、有机物及胶质等杂质去除,以获得高质量的水。 奥凯〖反渗透设备〗原理: Ro(reverse osmosis)technology:reverse osmosis is REVERSE OSMOSIS,it is the United States of America NASA set international scientists,in support of the government,to spend billions of dollars,after many years of research into.Reverse osmosis principle is applied in water on one side than the natural osmotic pressure greater pressure,so that the water molecules from the high concentrations of a reverse osmosis to the low concentration of a party.Due to the reverse osmosis membrane pore size is much smaller than a virus and bacterial hundreds of times or even thousands of times,so a variety of viruses,bacteria,heavy metal,solid solubles,organic pollution,such as calcium and magnesium ions cannot pass reverse osmosis membrane,so as to achieve the purpose of purifying water quality softening. Reverse osmosis membrane of the epidermis is covered with many very fine pores of the membrane,the membrane surface selective adsorption of a layer of water molecules, salt solute is membrane rejection,higher valence ion exclusion of more distant, film hole surrounding water molecules in reverse osmosis pressure role,through the membrane of the capillary effect of water and salt to reach out.RO membrane pore size< 1.0nm,thus can remove at least one bacterium Pseudomonas aeruginosa (specifically10-10m3000influenza virus(800),specifically for10-10m), meningitis,virus(10-10m200specifically for various viruses,can even remove pyrogen

火车装车栈桥防坠落隐患治理预防安全控制措施实用版

YF-ED-J2148 可按资料类型定义编号 火车装车栈桥防坠落隐患治理预防安全控制措施实 用版 In Order To Ensure The Effective And Safe Operation Of The Department Work Or Production, Relevant Personnel Shall Follow The Procedures In Handling Business Or Operating Equipment. (示范文稿) 二零XX年XX月XX日

火车装车栈桥防坠落隐患治理预防安全控制措施实用版 提示:该解决方案文档适合使用于从目的、要求、方式、方法、进度等都部署具体、周密,并有很强可操作性的计划,在进行中紧扣进度,实现最大程度完成与接近最初目标。下载后可以对文件进行定制修改,请根据实际需要调整使用。 一、问题及现状 罐车罐顶护栏原设计单面开口,车辆在目 前线路设置下,无法达到梯子放平条件,工人 操作有摔下罐的危险。 二、项目建设必要性和解决方案 GB3608规定工作位置2米以上需要提供坠 落保护措施。现场作业人员需要在2米以上的 槽车上做平移高空作业,存在坠落的风险。需 配备防坠落个人保护装备,并建议搭建水平生 命线(索)作为高空作业区域内的承重锚固系

统,为作业人员提供全程保护。 三、治理后达到效果和时间安排 水平生命防护系统又称水平生命线防坠系统,以其可靠,方便,耐用的特性,被广泛应用于各种有高空坠落风险的作业环境,如高处装卸作业等,为工作人员的生命安全提供有力保障。 时间安排:20xx年10月期间完成隐患项目 四、项目主要内容、主要设备材料及概算(尽量详细) 项目内容及主要材料详见天津酋明安全设备有限公司选型方案报价表,投资约82万元。 五、项目负责人及人员构成建议 项目负责人: 项目组人员:

火车装车栈桥防坠落隐患治理预防安全控制措施

编号:SM-ZD-29918 火车装车栈桥防坠落隐患治理预防安全控制措施Through the process agreement to achieve a unified action policy for different people, so as to coordinate action, reduce blindness, and make the work orderly. 编制:____________________ 审核:____________________ 批准:____________________ 本文档下载后可任意修改

火车装车栈桥防坠落隐患治理预防 安全控制措施 简介:该方案资料适用于公司或组织通过合理化地制定计划,达成上下级或不同的人员 之间形成统一的行动方针,明确执行目标,工作内容,执行方式,执行进度,从而使整 体计划目标统一,行动协调,过程有条不紊。文档可直接下载或修改,使用时请详细阅 读内容。 一、问题及现状 罐车罐顶护栏原设计单面开口,车辆在目前线路设置下,无法达到梯子放平条件,工人操作有摔下罐的危险。 二、项目建设必要性和解决方案 GB3608规定工作位置2米以上需要提供坠落保护措施。现场作业人员需要在2米以上的槽车上做平移高空作业,存在坠落的风险。需配备防坠落个人保护装备,并建议搭建水平生命线(索)作为高空作业区域内的承重锚固系统,为作业人员提供全程保护。 三、治理后达到效果和时间安排 水平生命防护系统又称水平生命线防坠系统,以其可靠,方便,耐用的特性,被广泛应用于各种有高空坠落风险的作业环境,如高处装卸作业等,为工作人员的生命安全提供有力

天然气长输管道的知识

关于天然气长输管道知识普及 随着我国天然气勘探开发力度的加大以及人民群众日益提高的物质和环保需要,近年来天然气长输管道的发展十分迅速。随着管道的不断延伸,管道企业所担负的社会责任、政治责任和经济责任也越来越大。因此,对于天然气长输管道知识普及显得尤为重要。 一、线路工程 输气管道工程是指用管道输送天然气和煤气的工程,一般包括输气线路、输气站、管道穿(跨)越及辅助生产设施等工程内容。 线路工程分为输气干线与输气支线。输气干线是由输气首站到输气末站间的主运行管线;输气支线是向输气干线输入或由输气干线输出管输气体的管线。 线路截断阀室属于线路工程的一部分,主要设备包括清管三通、线路截断球阀、上下游放空旁通流程、放空立管等,功能是在极端工况或线路检修时,对线路进行分段截断。阀室设置依据线路所通过的地区等级不同,进行不同间距设置。 阀室系统包括手动阀室和RTU阀室两大类。 二、工艺站场 输气站是输气管道工程中各类工艺站场的总称。一般包括输气首站、输气末站、压气站、气体接收站、气体分输站、清管站等站场。 输气站是输气管道系统的重要组成部分,主要功能包括调压、过滤、计量、清管、增压和冷却等。其中调压的目的是保证输入、输出

的气体具有所需的压力和流量;过滤的目的是为了脱除天然气中固体杂质,避免增大输气阻力、磨损仪表设备、污染环境等;计量是气体销售、业务交接必不可少的,同时它也是对整个管道进行自动控制的依据;清管的目的在于清除输气管道内的杂物、积污,提高管道输送效率,减少摩阻损失和管道内壁腐蚀,延长管道使用寿命;增压的目的是为天然气提供一定的压能;而冷却是使由于增压升高的气体温度降低下来,保证气体的输送效率。根据输气站所处的位置不同,各自的作用也有所差异。 1、首站 首站就是输气管道的起点站。输气首站一般在气田附近。 2、末站 末站就是输气管道的终点站。气体通过末站,供应给用户。因此末站具有调压、过滤、计量、清管器接受等功能。此外,为了解决管道输送和用户用气不平衡问题,还设有调峰设施,如地下储气库、储气罐等。 3、清管站 清管站是具有清管器收发、天然气分离设备设施及清管作业功能的工艺站场。 4、压气站 压气站是在输气管道沿线,用压缩机对管输气体增压而设置的站。 5、分输站

二级反渗透使用说明书

二级反渗透 ( R O ) 使用说明书 杭州安泰环保工程有限公司

目录 一.工作原理 --------------------------------------------------------------------------------------------------------2二.反渗透(R O)的常用术语 ---------------------------------------------------------------------------------3三.反渗透进水水质要求 ---------------------------------------------------------------------------------------3四.反渗透的标准操作规程 SOP-----------------------------------------------------------------------------4五.P L C控制原理 -----------------------------------------------------------------------------------------------6六.加药的药剂调配及加药泵的调节 ---------------------------------------------------------------------7七.反渗透的调试操作规程(S O P) ----------------------------------------------------------------------8附:典型开机顺序-------------------------------------------------------------------------------------- 9 八.反渗透的清洗操作规程(S O P) ------------------------------------------------------------------10九.反渗透系统停机及保存注意事项 --------------------------------------------------------------------14附表:反渗透系统常见故障的分析

2020新版装火车安全技术操作规程

( 操作规程 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 2020新版装火车安全技术操作 规程 Safety operating procedures refer to documents describing all aspects of work steps and operating procedures that comply with production safety laws and regulations.

2020新版装火车安全技术操作规程 一、适用范围 本规程适用于煤炭部散货类货物装火车作业,对散货类货物在装火车作业过程中的安全技术要求作出了明确的规定,旨在确保散货类货物在装火车的过程中达到安全作业的目的。 二、内容 1、作业前 (1)作业人员到达作业现场后,理货员组织作业人员及装载机司机开好班前安全会,根据散货类货物的生产作业流程,提出安全操作的具体要求及注意事项,并做好记录,作业班长及铲车司机进行签字。 (2)作业人员必须戴安全帽等劳动保护用品,安全帽生根。 2、作业中

(1)作业人员上下火车要踏实抓牢,攀援上下,防止摔伤。 (2)装载机开始装货时,车厢内禁止有人。装货时从车厢的一端开始,按标高均匀装载,行车要稳,不能碰撞车厢。作业人员站到车厢链结处进行指挥,禁止站到车皮上沿进行指挥,防止装载机碰到车皮引起震动造成人员摔落。 (3)作业人员平车作业必须待装载机离开后才能进行,平车时要从车厢的一端开始,补货时,作业人员站到车厢内进行指挥,装载机司机未看到车厢内指挥人员不允许补货,防止把正在平车的人员压到下面。 (4)装载机作业时,作业人员要躲到其作业线路以外的安全位置,避开其行走路线。 (5)因作业需要,装载机需牵车时,要通知理货员及装卸班长,停止一切作业。装卸工人不许在车皮内,全部下车在安全位置等候,牵车完毕后方可重新回到车厢内进行作业。 (6)作业人员进行车门及门划关闭捆扎时用专用工具,防止关闭车门及门划过程中车门突然外涨造成人身伤害。

火车装车控制使用手册

装车控制使用手册 装车站为机、电、液一体的自动装车系统,下面就如何操作作简单介绍,仅供参考。 (一)、系统启动前的准备工作 1.快速装车系统操作使用前的一般规定: 1)操作员具有高中(中技)以上文化程度; 2)操作员上岗前要经过安全和业务培训; 3)操作员要熟悉快速装车站的工艺流程; 4)操作员应具有机械、液压、电气控制及计算机的基本知识; 5)操作员要掌握给煤机、胶带运输机和装车设备的工作原理、基本结构和主要性能; 6)岗位司机应取得钢缆皮带操作工上岗资格。 2.开机前的检查项目: 1)检查胶带机电机、液力偶合器、减速器、制动器、逆止器、防堵开关、拉绳开关、跑偏开关、防打滑装置、纵向撕列保护、胶带、各类滚筒、拉紧装置、皮带清扫器、托辊等设备及部件是否完好。 2)检查给煤机各螺栓是否紧固,吊挂是否平衡稳固,电机两端防护罩是否完好,弹簧座软连接是否磨损 3)检查装车塔楼内液压站、油缸、泵、阀等是否有渗漏现象,各截止阀位置是否正确,油路是否畅通。 4)检查液压泵(1#2#)动力电是否送好,油位、油温是否正常。 3.检查工控机的通讯情况:将计算机打开,进入控制画面,若控制画面图象显示正常,则说明网络通讯正常,反之则不正常。 4.冬季,液压系统启动前应注意: 由于冬季环境温度底,导致达不到液压系统的工作温度,因此要在装车前对液压系统进行热油循环或油箱预热。 5.对液压系统进热油循环或油箱预热: 进入控制画面,在控制画面的右上角点击“热油循环”或“油箱预热”按钮,系统将自动开始加热循环(注意:此时溜槽不能停在装车位置) (二)、系统的运行操作 1.“系统启动”按钮的功能及操作: 功能:开启液压油泵。操作:按下1s 2.“系统停止”按钮的功能及操作: 功能:停止液压油泵。操作:按下1s 3.“缓冲仓全部闸门”按钮的功能及操作: 功能:控制缓冲仓全部闸门的开和闭。操作:按下,闸门开;弹起,闸门关闭4.“缓冲仓闸门开”按钮的功能及操作: 功能:控制缓冲仓补料闸门的开和闭。操作:按下,闸门开;弹起,闸门关闭5.“卸料闸门启动”按钮的功能及操作: 功能:打开卸料闸门。操作:按下1s 6.“卸料闸门停止”按钮的功能及操作: 功能:关闭卸料闸门。操作:按下ls 7.“重读”按钮的功能及操作: 功能:在定量仓处在就绪状态下,重新配煤时用。操作:按下ls 8.“卸料闸门点动”按钮的功能及操作:

二级反渗透EDI纯水处理

广东南方营养保健品有限公司(5.0 m3/h 二级反渗透+EDI纯化水设备)方案报价书

目录 (一)公司简介 (2) (二)设计总导则 (3) (三)设计原始资料 (4) (四)系统对外界的要求 (4) (五)系统流程图 (5) (六)系统流程说明 (5) (七)系统配置及报价 (27) (八)交货期及付款方式 (29) (九)验收标准 (29) (十)设备技术服务内容 (29) (十一)安装、调试、售后服务 (31) (十二)施工现场管理 (32)

一、公司简介 二、设计总导则 2.1技术设计导则 本套水处理设备为5.0m3/h二级反渗透+EDI的纯化水系统,整套设备工艺的设计是基于充分考虑下列因素的基础上制定的: 2.1.1原水水质; 2.1.2用户对产品水的水质和产水量的要求; 2.1.3工艺设计的可靠性; 2.1.4设备对原水水质改变的适应能力; 2.1.5操作的简便性与运行的智能化; 2.1.6废液的处理与排放符合环保要求; 2.1.7投资和运行费用; 2.1.8设备的物理及化学清洗功能; 2.1.9产水质量的稳定性。 2.2 本技术总则用于本工程的水处理脱盐系统。它提出了该系统的功能设 计、结果、性能、安装和调试方面的技术要求。 2.3 需方即使未规定所有的技术要求和适用的标准,供方应提供一套满足 本技术方案和所列标准要求的高质量产品及其相应服务。对国家安全、环境保护高强制性标准,必须满足其要求。 2.4 设备采用的专利涉及到的全部费用均包含在设备报价中,供方应保证 需方不承担有关的设备专利的一切责任。 2.5 供方应提供高质量的设备。这些设备应是技术先进、经济上科学合理、 质量成熟可靠的产品,能满足需方的各项要求。所有设备的设计、制造和安装应保证工作的可靠性,并保证尽可能少的维修量。所有设备的设计结构及配置,必须保证运行中操作者的安全,防护设施及噪音,

皮带秤定量装车系统技术方案(DOC)

https://www.wendangku.net/doc/3c9065592.html,/皮带秤定量装车系统技术方案

技术方案 一、系统组成及流程: 1、系统组成: 皮带秤定量装车系统由储料仓、给料系统(料仓法兰联接器、控制闸门、导料溜槽)、物料输送系统、定值计量控制系统(称重传感器、速度传感器、称重显示控制器)、电气控制系统(变频控制)、供电系统、计算机管理系统、视频监控系统、语音播报系统、大屏幕指示系统、车辆判别系统等部分组成。可根据用户的需求增加远程控制系统。 配电柜、控制柜、操作柜采用防尘电气控制柜,内装有启动、停止、急停按钮和指示灯、等低压电气元件及变频器。电气部件变频器选用台达变频器,电器关键元件全部选用进口优质元件,以确保电气运行稳定可靠。 2、系统流程: 1.给煤 储煤仓通过震动给煤机下料由输送皮带送至缓冲仓(有效容积450吨),在缓冲仓内安装料位传感器检测仓内储量,仓内储量设定上限值和下限值,由计算机程序自动控制上煤(下

限开启,上限关闭),并设置提前量,使皮带上原煤放空,保证每次皮带为空载启动。 2.装车 缓冲仓下分为两个通道,每个通道设两台定值皮带秤同时向中间一个下料口计量放煤装车。 3.装车流程 车辆进场将空车停至空车磅上(下磅方向设有挡杆,为常闭状态),司机下车到磅房等待司磅员将空车信息录入到ID卡内,完成后将ID卡交给司机并抬起挡杆放行,司机将车辆开到装车点下指定装车位置后,司机在装车处刷ID卡信息进入控制室电脑,控制室操作员确认信息并通过监控系统确认车辆位置无误后(如位置不对操作员通过语音系统让司机将车辆停到指定位置),操作员启动装车程序开始装车,在装车过程中操作员要通过监控系统根据装车情况提示司机移动车辆位置,装车完成后操作员通过语音系统通知司机离开,司机将车辆开至重车磅上(下磅方向设有挡杆,为常闭状态),司机下车刷卡并将ID卡交给司磅员,司磅员核对ID卡装车信息无误后,打票、抬杆放行,此为一个工作流程。

输气工艺计算试题

输气工艺计算题 1、一段输气管道,平均压力是1.2MPa,平均温度是19℃,管道规格 是φ457 mm×7 mm,管道长度25km,管道的平均压缩系数为1,请计算 该段管道的管道容积? 已知:t=19℃,P=1.2MPa,D=(457-7×2)mm,L=25km 求:V=? 解:根据公式得: ①A=1/4×3.14×((457-7×2)×10-3)2=0.1541 m2 ②V= A L= 0.1541×25×103=3852.5 m3 答:该段管道的管道容积是3852.5 m3。 2、一段输气管道,天然气的平均压力是4.5MPa,平均温度是15℃, 管道规格是φ559 mm×9 mm,管道长度25.4km,大气压力按0.1 MPa, 天然气的平均压缩系数为1,请计算该段管道的储气量? 已知:t=15℃,P=4.5MPa,D=(559-9×2)mm,L=25.4km,t0=20℃, P0=0.1MPa 求:V0=? 解:根据公式得: ①A=1/4×3.14×((559-9×2)×10-3)2=0.2298 m2 ②V= A L= 0.2298×25.4×103=5836.9 m3 ③T0 =273.15+20=293.15 K T=273.15+15=288.15 K ④P0 V0/ T0 = P V/ T Z0=Z=1

⑤V0 = P V T0/ (P0 T) =(4.5+0.1)× 5836.9 × 293.15/(0.1×288.15) = 273156 m3 答:该段管道的储气量是273156 m3。 3、输气站到邻近阀室距离16.9 km,输气站起点压力是3.8MPa,阀室压力是3.5MPa,距输气站5 km处的输气管道发生泄漏,请问发生泄漏时泄漏点的压力是多少? 已知:。P1=3.8MPa,P2=3.5MPa,L=16.9km,X=5km。 求:P X=? 解:根据公式得: ①P X=( P12 -(P12– P22)X/L )1/2 ②P X=( 3.82 -(3.82–3.52)×5/16.9 )1/2 ③P X=3.72 MPa 答:发生泄漏时泄漏点的压力是3.72 MPa。 4、输气站到邻近阀室距离25.9 km,输气站起点压力是2.9MPa,阀室压力是2.5MPa,输气管道在压力2.69MPa处发生泄漏,请问发生泄漏时泄漏点距输气站的距离有多远? 已知: P1=2.9MPa,P2=2.5MPa,L=25.9km,P X =2.69MPa。 求:X =? 解:根据公式得: ①P X=( P12 -(P12– P22)X/L )1/2 ②2.69=( 2.92 -(2.92–2.52)X /25.9 )1/2

火车头使用说明

火车头使用说明 别的不说了,直接开始使用。(ps:开始之前,最好把爬虫的原理了解一下) 咱们用的是免费版,功能什么的很多受到限制,免费版网页只能抓到两级,而且无法定时执行任务。 1、安装完火车头后,直接双击图标打开,此时会弹出一个登录页面,什么都不要管,直接 点击登录就进入了主界面,主界面如下: 你会发现它有一些内置的分组,分组下面有内置的测试任务,这里要强调一点,每个任务从上到下对应着火车头安装目录data目录下的以数字开头的文件夹,里面放着各自的数据文件,大概内置测试任务有38个,所以data目录下有对应从1到38的38个文件夹,你以后新建任务后,会自动再data目录下建立文件夹,序号依次递增。 2、新建任务和分组。你可以新建分组,也可以再已有的测试分组下面建立任务,但是有一 点要注意,任务不能脱离分组而存在,必须把任务存在分组里面,这里咱们新建一个名字叫做腾讯的分组。 3、右键单击腾讯,选择新建任务,弹出新建任务对话框

4、下面我们以腾讯新闻采集为例说一下如何去配置,任务名叫做腾讯新闻 可以看到,这里分为四步,第一部就是采集网址规则(这一步就相当于爬虫里面设置种子url 并且入队的过程),在出现的起始网址,添加单条网址,并点击”添加“按钮。

我们在网页中,通过分析,发现国内新闻的第二页及以后都是以数字递增的方式显示的,我们现在添加等差数列形式的网址 最后点击完成,查看效果

起始网址的添加就是种子URL的设置过程,这里可以添加多个种子URL,我这里设置了六页下面就是多级网址获取,点击添加按钮,出现如下画面(这一步相当于提取网页所有连接的过程) 如果直接点击保存,相当于提取网页中所有链接,但真实情况下我们并不需要所有的链接,所以需要对链接进行过滤,可以从该选定区域提取网址,也可以对结果网址过滤,这里我们设置结果网址必须包含https://www.wendangku.net/doc/3c9065592.html,/a,然后点击保存。

定量装车系统操作规程

广州石化化工区 定量装车系统操作规程 广州石化化工一部 2008年3月

目录 1 概述 (2) 1.1 定量装车系统 (2) 2 定量装车系统操作说明 (2) 2.1 上位机系统预备知识 (2) 2.1.1硬件平台 (2) 2.1.2软件平台 (2) 2.1.3鼠标器操作 (3) 2.2 系统应用详细说明: (3) 2.2.1启动控制系统及开票系统计算机 (3) 2.2.2屏幕画面的分类及相关操作 (4) 2.2.3装车台控制 (4) 2.2.4参数表 (6) 2.2.5报警查看 (7) 2.2.6趋势画面 (7) 2.2.7操作记录 (9) 2.2.8管理页面 (9) 2.3 系统安全与维护 (10) 2.3.1系统硬件系统的安全与维护 (10) 2.3.2系统软件系统的安全与维护 (11) 3 定量装车系统操作说明 (11) 3.1 系统构成及设备简单说明 (11) 3.1.1上位计算机操作系统 (11) 3.1.2MicroLoad控制器 (11) 3.1.3215型气动数字控制多级关断阀 (11) 3.2数控阀流程原理示意图: (12) 3.3定量装车系统设备启动及操作 (13) 3.3.1Smith MicroLoad控制器操作说明 (13) 3.3.2定量装车系统设备故障原因及处理方法 (15) 4 发货流程 (16)

1概述 本操作手册适用化工区装车台定量装车系统。该手册主要介绍了系统的功能,运行环境及操作使用说明,操作工通过本手册可了解并掌握该系统的基本构成及操作。该系统主要由以下三个部分组成:定量装车系统、开票管理系统及流量计数据采集系统等组成。 1.1 定量装车系统 定量装车系统主要由批量控制器、质量流量计、气动式数字控制多级关断阀、单路溢油静电保护器等组成,与流量计数据采集系统共用一套上位机系统,完成对6个鹤位3种化工产品的定量装车控制。 主要设备包括: ●DELL计算机:GX280 1台 ●批量控制器:ML-XP-STD-1 6台 ●气动数字控制多级关断阀:215 6台 ●单路溢油静电保护器:SLA-S-IIB 6台 2定量装车系统操作说明 2.1 上位机系统预备知识 2.1.1硬件平台 本系统的硬件平台为DELL操作站,通过安装在操作站上的以太网卡与PLC进行在线数据通讯。 2.1.2软件平台 本系统的软件平台为Windows XP 简体中文版操作系统,Windows XP 简体中文版操作系统是一种多任务窗口式操作系统。该控制系统主要采用鼠标器操作,用来激活各种应用目标(Object)的方式,使操作工能非常直观地进入各种操作状态。

火车装车栈桥防坠落隐患治理预防安全控制措施标准版本

文件编号:RHD-QB-K6708 (解决方案范本系列) 编辑:XXXXXX 查核:XXXXXX 时间:XXXXXX 火车装车栈桥防坠落隐患治理预防安全控制措 施标准版本

火车装车栈桥防坠落隐患治理预防安全控制措施标准版本 操作指导:该解决方案文件为日常单位或公司为保证的工作、生产能够安全稳定地有效运转而制定的,并由相关人员在办理业务或操作时进行更好的判断与管理。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 一、问题及现状 罐车罐顶护栏原设计单面开口,车辆在目前线路设置下,无法达到梯子放平条件,工人操作有摔下罐的危险。 二、项目建设必要性和解决方案 GB3608规定工作位置2米以上需要提供坠落保护措施。现场作业人员需要在2米以上的槽车上做平移高空作业,存在坠落的风险。需配备防坠落个人保护装备,并建议搭建水平生命线(索)作为高空作业区域内的承重锚固系统,为作业人员提供全程保

护。 三、治理后达到效果和时间安排 水平生命防护系统又称水平生命线防坠系统,以其可靠,方便,耐用的特性,被广泛应用于各种有高空坠落风险的作业环境,如高处装卸作业等,为工作人员的生命安全提供有力保障。 时间安排:20xx年10月期间完成隐患项目 四、项目主要内容、主要设备材料及概算(尽量详细) 项目内容及主要材料详见天津酋明安全设备有限公司选型方案报价表,投资约82万元。 五、项目负责人及人员构成建议 项目负责人: 项目组人员: 六、项目实施前临时防范措施:

1、严格岗位操作人员的岗前、工作前培训教育; 2、确保现场防护设施完好,操作人员劳保上岗,上下栈桥折叠扶梯时手抓牢扶手。 3、加强装车过程现场监护、监督工作。 4、组织火车装车岗位人员学习、熟知,并严格落实安全防护措施。 这里写地址或者组织名称 Write Your Company Address Or Phone Number Here