文档库 最新最全的文档下载
当前位置:文档库 › 合兴英语

合兴英语

公司英语

一、织机构及职位

XX电子有限公司XX Electronics CO., Ltd

总经理办公室General manager’s office

企管部Enterprise management department (EM)

行政部Administration department (AD)

销售部Sales department (SD)

财务部Financial department (FD)

技术部Technology department (TD)

物控部Production material control department (PMC)

生产部Production department(PD)

模具部Mold manufacturing department, Tooling manufacturing department (TM) 品管部Quality Assurance department (QA)

冲压车间Stamp workshop, press workshop

注塑车间injection workshop

装配车间Assembly workshop

模具装配车间Mold and die Assembly workshop

金属加工车间Metal machine workshop

电脉冲车间Electric discharge process workshop

线切割车间wire cutting process workshop

工磨车间Grinding workshop

总经理General manager (GM)

副总经理Vice-general manager

经理manager

董事长president

副董事长Vice-president

XX部门经理Manager of XX department

主任、主管supervisor

拉长Line leader

组长Foreman, forelady

秘书secretary

文员clerk

操作员operator

助理assistant

职员staff

二、产品

连接器connector

端子terminal

条型连接器bar connector

阴连接器Housing

阳连接器wafer

线束wire harness

间距space

额定电压rated voltage

额定电流rated current

接触电阻contact resistance

绝缘电阻insulation resistance

超声波焊接ultrasonic welding

耐压withstand voltage

针pin

物料编号part number

导线wire

基体金属Base metal

电缆夹cable clamp

倒角chamfer

接触面积contact area

接触件安装孔contact cavity

接触长度contact length

接触件电镀层contact plating

接触压力contact pressure

接触件中心距contact space

接触簧片contact spring

插孔socket contact

法兰、凸缘Flange

界面间隙interfacial gap

键Key

键槽keyway

过渡段ramp

屏蔽套shielding

定位基准Datum reference

扁平电缆flat cable ,Ribbon cable 柔性印刷电线Flexible printed wiring 多层印制电路Multilayer printed circuit

焊盘pad

图形pattern

间距pitch

负极Negative pole

正极positive pole

回流Reflow

原理图Schematic diagram

单面板single sided board

双面板Two-sided board,Double-sided board

表面安装surface Mounting

翘曲warp,bow

波峰焊wave soldering

编织层braid

同轴电缆coaxial cable

电介质dielectric

电缆中导线的头数ends

外部干扰external interference

填充物filler

护套jacket

比重specific gravity

电阻的温度系数Temperature coefficient of resistance

三、模具

塑料模具mould of plastics

注塑模具injection mould

冲压模具die

模架mould base

定模座板Top clamping plate

Top plate

Fixed clamp plate

水口推板stripper plate

A板A plate

B板B plate

支承板support plate

方铁spacer plate

底针板ejector plate

面针板ejector retainer plate

回针Return pin

导柱Guide pin

有托导套Shoulder Guide bush

直导套Straight Guide bush

动模座板Bottom clamp plate

Moving clamp plate

基准线datum line

基准面datum plan

型芯固定板core-retainer plate

凸模固定板punch-retainer plate 顶针ejector pin

单腔模具single cavity mould

多腔模具multi-cavity mould

多浇口multi-gating

浇口gate

缺料starving

排气breathing

光泽gloss

合模力mould clamping force

锁模力mould locking force

挤出extrusion

开裂crack

循环时间cycle time

老化aging

螺杆screw

麻点pit

嵌件insert

活动镶件movable insert

起垩chalking

浇注系统feed system

主流道sprue

分流道runner

浇口gate

直浇口direct gate , sprue gate

轮辐浇口spoke gate , spider gate 点浇口pin-point gate

测浇口edge gate

潜伏浇口submarine gate , tunnel gate 料穴cold-slug well

浇口套sprue bush

流道板runner plate

排飞槽vent

分型线(面)parting line

定模stationary mould,Fixed mould

动模movable mould, movable half

上模upper mould,upper half

下模lower mould,lower half

型腔cavity

凹模cavity plate,cavity block

拼块split

定位销dowel

定位销孔dowel hole

型芯core

斜销angle pin, finger cam

滑块slide

滑块导板slide guide strip

楔紧块heel block, wedge lock

拉料杆sprue puller

定位环locating ring

冷却通cooling channel

脱模斜度draft

滑动型芯slide core

螺纹型芯threaded core

热流道模具hot-runner mould

绝热流道模insulated runner mould

熔合纹weld line (flow line)

三板式模具three plate mould

脱模ejection

换模腔模具interchangeable cavity mould 脱模剂release agent

注射能力shot capacity

注射速率injection rate

注射压力injection pressure

差色剂colorant

保压时间holdup time

闭模时间closing time

定型装置sizing system

阴模female mould,cavity block

阳模male mould

电加工设备Electron Discharge Machining 数控加工中心CNC machine center

万能铁床Universal milling machine

卧式刨床Horizontal planer

车床Engine lathe

平面磨床Surface grinding machine

去磁机Demagnetization machine

万能摇臂钻床Universal radial movable driller

立式钻床Vertical driller

超声波清洗机Ultrasonic clearing machine 四、品管

SPC statistic process control

品管保证Quality Assurance

品管控制Quality control

来料检验IQC Incoming quality control

巡检IPQC In-process quality control

校对calibration

动态试验dynamic test

环境试验Environmental test

非破坏性试验non-destructive test

光泽gloss

击穿电压(dielectric) breakdown voltage

拉伸强度tensile strength

冷热骤变试验thermal shock test

环境试验炉Environmental chamber

盐雾实验salt spray test

绝缘电阻测试验仪Insulating resistance meter

内应力internal stress 疲劳fatigue

蠕变creep

试样specimen

撕裂强度tear strength

缩痕shrink mark, sink mark 耐久性durability

抽样sampling

样品数量sample size

AQL Acceptable Quality level 批量lot size

抽样计划sampling plan

OC曲线operation curve

试验顺序sequence of tests

环境温度ambient temperature 可焊性solderability

阻燃性flame resistance

五、生产

注塑机injection machine

冲床Punch machine

混料机blender mixer

尼龙nylon

黄铜brass

青铜bronze

紫(纯)铜copper

料斗hopper

麻点pit

配料compounding

涂层coating

飞边flash

预热preheating

再生料reworked material

再生塑料reworked plastics

工艺设计process design

紧急停止emergency stop

延时time delay

六.物控

保质期shelf life

ABC分类法ABC Classification

反常需求Abnormal Demand

措施信息Action Message

活动报告标志Action-report-flag

基于活动的成本核算Activity-based Costing (ABC)

实际能力Actual Capacity

实际成本Actual Costs

调整现有库存量Adjust-on-hand

已分配量Allocation

替代工序Alternative Routine

装配订单Assembly Order

装配零件表Assembly Parts List

装配Assembly

计划自动重排Automatic Rescheduling

可达到库存Available Inventory

可用材料Available Material

达到库存Available Stock

可利用工时Available Work

可签约量Available-to-promise

平均库存Average Inventory

欠交订单Back Order

倒序计划Back Scheduling

倒冲法Back flush

未完成订单Backlog

现有库存余额Balance-on-hand Inventory 批号Batch Number

批量生产Batch Production

标杆瞄准Benchmarking

工时清单Bill of Labor

提货单Bill of Lading

物料清单Bill of Material

分库Branch Warehouse

经营规划Business Plan

采购员Buyer

能力管理Capacity Management

能力需求计划Capacity Requirements Planning (CRP)

保管费率Carrying Cost Rate

保管费Carrying Cost

单元式制造Cellular Manufacturing

修改批量日期Change Lot Date

修改工序Change Route

修改产品结构Change Structure

检查点Check Point

闭环物料需求计划Closed Loop MRP

通用工序标识Common Route ID

计算机集成制造Computer-integrated Manufacturing (CIM)

配置代码Configuration Code

约束管理/约束理论Constraints Management/Theory of Constraints (TOC) 依成本的材料清单Costed Bill of Material 急需零件Critical Part

累计提前期Cumulative Lead Time

现有运转时间Current Run Hour

现有运转数量Current Run Quantity

周期盘点Cycle Counting

调整日期Date Adjust

有效日期Date Available

修改日期Date Changed

结束日期Date Closed

截止日期Date Due

生产日期Date in Produced

库存调整日期Date Inventory Adjust

作废日期D ate Obsolete

收到日期Date Received

交付日期Date Released

需求日期Date Required

发货日期Date to Pull

空负荷Dead Load

需求管理Demand Management

需求Demand

实际能力Demonstrated Capacity

非独立需求Dependent Demand

直接增减库存处理法Direct-deduct Inventory Transaction Processing

发料单Disbursement List

派工单Dispatch List

分销资源计划Distribution Resource Planning (DRP)

鼓-缓冲-绳子Drum-buffer-rope

经济订货批量Economic Order Quantity (EOQ)

工程变更生效日期Engineering Change Effect Date

工程变更生效单Engineering Change Effect Work Order

工程停止日期Engineering Stop Date

例外控制Exception Control

呆滞材料分析Excess Material Analysis

急送代码Expedite Code

加工订单Fabrication Order

补足欠交Fill Backorder

总装提前期Final Assembly Lead Time

确认的计划订单Firm Planned Order

固定订货批量F ixed Order Quantity

集中预测Focus Forecasting

完全跟踪Full Pegging

通用生产管理原则Generally Accepted Manufacturing Practices

毛需求Gross Requirements

在制品库存In Process Inventory

独立需求Independent Demand

投入/产出控制Input/ Output Control

检验标识Inspection ID

厂际需求Interplant Demand

库存周转率Inventory Carry Rate

仓库库位类型Inventory Location Type

库存周转次数Inventory Turnover

发送订单Issue Order 项目记录Item Record

物料项目Item

加工车间Job Shop

准时制生产Just-in-time (JIT)

看板Kanban

人工工时Labor Hour

最后运输日期Last Shipment Date

提前期Lead Time

层Level

负荷量Load Leveling

负荷报告Load Report

负荷Load

仓位代码Location Code

仓位备注Location Remarks

仓位状况Location Status

按需订货Lot for Lot

批量标识Lot ID

批量编号Lot Number

批量Lot Size

低位码Low Level Code

机器能力Machine Capacity

机器加载Machine Loading

外购或自制决策Make or Buy Decision

面向订单生产的产品Make-to-order Product

面向库存生产的产品Make-to-stock Product

制造周期时间Manufacturing Cycle Time 制造资源计划Manufacturing Resource Planning (MRP II)

主生产计划Master Production Schedule (MPS)

物料成本Material Cost

物料发送和接收Material Issues and Receipts

物料需求计划Material Requirements Planning (MRP)

登陆标志MPS Book Flag MPS

多重仓位Multiple Location

净改变式MRP N et Change MRP

净需求Net Requirements

新仓位New Location

新组件New Parent

新仓库New Warehouse

不活动报告No Action Report

现有库存量On-hand Balance

未结订单Open Order

订单输入Order Entry

订货点Order Point

订货方针Order Policy

订货承诺Order Promising

订货备注Order Remarks

双亲Parent

零件清单Part Bills

零件批次Part Lot

零件编号Part Number

零件Part

反查Pegging

领料单Picking List

领料/提货Picking

计划订单Planned Order

后减库存处理法Post-deduct Inventory Transaction Processing

前减库存处理法Pre-deduct Inventory Transaction Processing

发票价格Price Invoice

采购订单价格Price Purchase Order

优先计划Priority Planning

产品控制Product Control

产品线Production Line

生产规划编制Production Planning

产品率Production Rate

产品结构树Production Tree

预计可用库存Projected Available Balance 采购订单跟踪Purchase Order Tracking

已分配量Quantity Allocation

仓位数量Quantity At Location

欠交数量Quantity Backorder

完成数量Quantity Completion

需求量Quantity Demand

毛需求量Quantity Gross

进货数量Quantity In

排队时间Queue Time

队列Queue

重生成式MRP Regenerated MRP

重排假设Rescheduling Assumption

资源需求计划Resource Requirements Planning

粗能力计划Rough-cut Capacity Planning 工艺路线Routing

安全库存量Safety Stock

保险期Safety Time

预计入库量Scheduled Receipt

残料率Scrap Factor

发送零件Send Part

维修件Service Parts

发货地址Ship Address

发货单联系人Ship Contact

发货零件Ship Date

发货单Ship Order

工厂日历Shop Calendar

车间作业管理Shop Floor Control

损耗系数Shrinkage Factor

标准产品成本Standard Product Cost

标准机器设置工时Standard Set Up Hour 标准单位运转工时Standard Unit Run Hour

标准工资率Standard Wage Rate

状况代码Status Code

库存控制Stores Control

建议工作单Suggested Work Order

约束理论Theory of Constraints (TOC)

时间段Time Bucket

时界Time Fence

单位成本Unit Cost

采购计划员Vendor Scheduler

采购计划法Vendor Scheduling

工作中心能力Work Center Capacity

工作中心Work Center

在制品Work in Process

工作令跟踪Work Order Tracking

工作令Work Order

工作进度安排Work Scheduling

零库存Zero Inventories

经济订货批量=Squat(2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本)

美国生产和库存控制协会APICS,American Production & Inventory Control Society

七.QS-9000中的术语

APQP Advanced Product Quality Planning and Control Plan,产

品质量先期策划和控制计划

PPAP Production Part Approval Process,生产件批准程序

FMEA Potential Failure Mode and Effects Analysis,潜在失效模式

及后果分析

MSA Measure System Analysis,测量系统分析

SPC Statistical Process Control,统计过程控制

审核 Audit

能力 Capability

能力指数 Capability Indices

控制计划 Control Plans

纠正措施 Corrective Action 文件 Documentation

作业指导书Job Instruction, work instruction

不合格品 Nonconformance

不合格 Nonconformity

每百万零件不合格数 Defective Parts Per Million, DPPM

预防措施 Preventive Action

程序Procedures

过程流程图Process Flow Diagram, Process Flow Chart

质量手册Quality Manual

质量计划 Quality Plan

质量策划 Quality Planning

质量记录Quality Records

原始数据Raw Data

反应计划Reaction Plan

返修Repair。

返工Rework

现场Site

分承包方Subcontractors

产品product

质量quality

质量要求quality requirement

顾客满意customer satisfaction

质量管理体系quality management system

质量方针quality policy

质量目标quality objective

质量管理quality management

质量控制quality control

质量保证quality assurance

组织organization

顾客customer

供方supplier

过程process

服务service

?

设计与开发design and development : 特性characteristic 可追溯性trace ability 合格conformity 缺陷defect 纠正correction 让步concession 放行release 报废scrap

规范specification 检验inspection 试验test

验证verification 评审review 测量measurement

计数型数据Attributes Data 普通原因Common Cause 单值Individual 均值Mean

随机抽样Random Sampling 极差Range

特殊原因Special Cause 稳定性Stability 子组Subgroup

计量型数据Variables Data 变差Variation

固有变差Inherent Variation 总变差Total Variation 偏倚Bias

重复性Repeatability 再现性Reproducibility 稳定性Stability 线性Linearity 分辨率Resolution 过程更改Process change 质量功能展开QFD 过程特殊特性

Special Process

Characteristic 产品特殊特性

Special Product

Characteristic 外观项目Appearance Item

初始过程能力Preliminary Process

Capability

材料清单Bill of Material 设计确认Design Validation 设计验证Design Verification 顾客的呼声Voice of the Customer 过程的呼声Voice of the Process 八.常用缩略词语

1、ES 工程规范 Engineering

Specification

2、KCC 关键控制特性(GM )Key Control

Characteristic

3、KPC 关键产品特性(GM )Key Product

Characteristic

4、OEM 整车厂 Original Equipment

Manufacturer

5、SC

重要(特殊)特性

Significant(Special) Characteristic 6、ANOVA 方差分析法 Analysis of

Variance

7、CFT 多方论证小组 Cross function

Team

8、DFMEA 设计失效模式及后果分析

Design Failure Mode and Effects Analysis

9、DOE 试验设计 Design of

Experiment

10、DVP&R 设计验证计划和报告 Design

verification Plan and Report 11、FTC 试生产能力 First Time

Capability

12、GR&R 量具的重复性和再现性Gage Repeatability and Reproducibility

13、PFMEA 过程失效模式及后果分析Process Failure Mode and Effect Analysis

14、SFMEA 系统失效模式及后是分析 System Failure Mode and Effect Analysis

15、QSR 质量体系要求 Quality System

Requirement

16、QFD 质量功能展开 Quality

Function Deployment

17、TGR 运行情况良好 Things Gone

Right

18、TGW 运行情况不良 Things Gone

Wrong

19、VE/VA 价值工程/价值分析 Value

Engineering/Value Analysis 20、BOM 物料清单 Bill of Material 21、Cpk 稳定过程的能力指数

Capability for stable process 22、LCL 下控制限 Lower Control

Limit

23、UCL 上控制限 Upper Control

Limit

24、LSL 工程规范下限 Lower Specification Limit

25、USL 工程规范上限 Upper

Specification Limit

26、Ppk 性能指数 The performance

index

27、MRB 物料评审 Material Review

Board

28、PSW 零件提交保证书 Part

Submission Warrant

29、X —

--R 图 均值一极差图

Average-Range Chart

30、SRPC 供方要求产品更改

Supplier Request for Product Change 31、SREA 供方工程批准的要求

Supplier Request for Engineering Approval

32、IAA 临时批准授权 Interim

Approval Authorization

33、AAR 外观件批准报告 Appearance

Approval Report

34、PTR 试生产(报告) Production

Trial Run (Report)

35、DCP 尺寸控制计划(动态控制计

划)Dimension Control Plan (Dynamic Control Plan)

37、防错(POKA-YOKE )Mistake Proofing

相关文档
相关文档 最新文档