文档库 最新最全的文档下载
当前位置:文档库 › 软件工程8版部分课后习题答案

软件工程8版部分课后习题答案

软件工程8版部分课后习题答案
软件工程8版部分课后习题答案

课后习题:

?What are the differences between generic software product development and custom software development?

?Solution:

The essential difference is that in generic software product development, the specification is owned by the product developer. For custom product development, the specification is owned by the customer. Of course, there may be differences in development processes but this is not necessarily the case.

重要区别为:在通用软件的开发过程中,详细说明(规格说明书)由产品开发者来制定,在定制软件产品开发过程中,详细说明(规格说明书)由客户来制定。

?What are the four important attributes which all software products should have? Suggest four other attributes that may sometimes be significant.

?Solution:

For important attributes are maintainability可维护性,

dependability 可靠性, performance(efficiency)有效性and

usability可用性.

Other attributes that may be significant could be reusability可复用性 (can it be reused in other applications),

distributability 可分发性(can it be distributed over a network

of processors), portability可移植性 (can it operate on

multiple platforms) and inter-operability互用性 (can it work

with a wide range of other software systems).

?What is the difference between a software process model and a software process? Suggest two ways in which a software process model might be helpful in identifying possible process improvements.

?Solution:

A software process is what actually goes on when software is

developed. A software process model is an abstraction and

simplification of a process. Process models can be used to help

understand real processes and to identify which aspects of these

processes could be supported by CASE tools. 软件过程就是指在

软件开发过程中所做的一些事情。软件过程模型是过程的抽象和简化。

过程模型可用于帮助理解真正的过程,并可用于识别过程中的哪些方

面可用CASE工具支持。

?Giving reasons for your answer based on the type of system being developed, suggest the most appropriate generic software process model that might be used as a basis for managing the development of the follow systems:

1) Anti-lock braking system

2) Virtual reality system

3) University accounting system

4) Interactive timetable

Solution:

(a) Anti-lock braking system: Safety-critical 安全鉴定system so

method based on formal transformations with proofs of

equivalence等价 between each stage.

(b) Virtual reality system: System whose requirements cannot be

predicted预知 in advance预先地 so exploratory programming

model is appropriate.

(c) University accounting system: System whose requirements should

be stable because of existing system therefore waterfall model

is appropriate.

(d) Interactive timetable交互式时间表: System with a complex user

interface but which must be stable and reliable. Should be based

on throw-away prototyping to find requirements then either

incremental development or waterfall model.

?Why a software system that is used in a real world environment must change or become progressively(日益增多地) less useful?

?Solution:

Systems must change because as they are installed in an environment the environment adapts to them and this adaptation naturally

generates new/different system requirements. 这种适应自然生成

新的系统需求

Furthermore, the system's environment is dynamic and constantly generates new requirements as a consequence of changes to the

business, business goals and business policies.商务的目标以及

政治相关Unless the system is adapted to reflect these

requirements, its facilities will become out-of-step with the

facilities needed to support the business and, hence, it will

become less useful.

?Why a good programmers is not always be a good software managers?

?Solution:

Management activities such as proposal writing, project planning and personal selection require a set of skill including

presentation 表述能力and communication skills交流的能力.

Organizational skills组织能力 and the ability to communicate

with other project team members.

Programming skills are distinct from these, it is common that they lack human communication skills他们缺乏交流技巧是一个普

遍的事实. So it does not follow that good programmers can

re-orient their abilities to be good managers.

管理活动包括提出书面建议,项目规划和进度,人员选择和评价,项目监督和评审,和其他队友的交流能力等。程序设计者的任务就不是这些,他们不需要和人交流的能

力,如果按照做好一个程序设计者的要求去做管理者的话,他肯定不是一个号的管

理者。

?Why the process of project planning is iterative and why a plan must be continually不断地reviewed during a software project.

?Solution:

Project planning can only be based on available information. At the beginning of a project, there are many uncertainties in the

available information and some information about the project and

the product may not be available. As the project develops, more

and more information becomes available and uncertainties are

resolved. The project plan therefore must be reviewed and

updated regularly to reflect this changing information

environment.

软件项目地规划取决于有用地信息。在项目进行期间不断产生新的信息,所以必须经常性的修改原有的计划。原本有用的信息可能会不再有用,

而原本一些不确定的信息反而会变得有用。最初对象目本身的估算是

实验性的,所以计划需要不断的修改。

Suggest who might be stakeholders in a university student records system.

The stakeholders in a student records system include:

University central administration including those responsible for registration, payment of fees, exams and assessment and

graduation. 大学管理中心,包括报到,交纳学费,考试,作业和毕

业等

The students whose details are recorded in the system. 记录在这个系统中的学生

University departmental administrators who supply information to the system and use information from it. 大学部门管理者,需要

提供和使用这些信息

Academic staff that use information from the system. 使用系统信息的学院成员

Data protection officers (local and national). 数据保护工作者

Potential employers of students(who may require information from the system). 潜在的学生中的雇佣者

在学生记录系统中的参与者包括:

。学校管理中心包括负责学生注册,缴费,考试,评估,毕业事宜的相关人员

。那些被记录具体信息的学生

。把学生信息录入到系统并使用系统信息的学校部门人员

。使用这些信息的学术人员

。数据安全人员(本地和国家的)

。潜在的雇用学生的人(或许需要用到这个系统里面的信息)

7.3 For three of the viewpoints identified in the library system.

LIBYSY, suggest three requirement that could be suggested by stakeholders associated with that viewpoint.

Solution:

You can tackle this problem using a brainstorming approach.

Obviously, there are many alternatives to the solutions

suggested here. Note the printing conflict is deliberate.

Viewpoint: Library manager

Requirement: Access to the LIBSYS system shall be restricted to accredited users of the library.

Requirement: The LIBSYS system shall provide a reporting facility that allows usage reports (who used the system, how often, what libraries were accessed) to be created and printed.

Requirement: The LIBSYS system shall be configured so that only document printing on specific library servers is permitted.

Viewpoint: Users

Requirement: The LIBSYS system shall be accessible from any location, including locations away from the university campus.

Requirement: It shall be possible to save LIBSYS queries, recall them and modify them for subsequent use.

Requirement: The LIBSYS system shall allow documents to be printed on user printers.

Viewpoint: System managers

Requirement: The restart time of the LIBSYS system after failure shall not exceed 5 minutes.

Requirement: The LIBSYS system shall provide a backup facility for user’s personal workspaces.

Requirement: The LIBSYS system shall be available for a range of platforms including Windows 2000, Windows XP and Mac OS X.

7.4 The LIBSYS system has to include support for cataloguing

new documents where the system catalog may be distributed across

several machines. What are likely to be the most important types

of non-function requirement associated with the cataloguing

facilities?

?Solution:

Important non-functional attributes for the cataloging services might be:

? Availability (because the system may be required at any time)

? Security (because the books data base musn’t be corrupted)

? Efficiency (because the system must respond quickly to each transaction)

For the browsing services, usability is also very important as these services should be easy to use without extensive training.

?Discuss an example of a type of system where social and political factors might strongly influence the system requirement. Explain why these factors are important in your example.

?Solution:

An example of a system where social and political factors influence system requirements is a system to manage the costs of public

healthcare. Politicians are anxious both to control costs and

to ensure that the best public image of the healthcare system

is provided. There is a potential conflict in such a system

between administrators who are driven by treatment costs and

doctors who are (or should be) driven by treatment effectiveness.

The requirements for the system might therefore embed particular

policies which are included as a result of organizations factors

(e.g. ensure that administrators can vet treatment costs) rather

than technical requirements.

社会和政治因素影响系统需求的一个例子是管理成本和公共卫生保健的系统。政治家们对控制成本和确保提供最好的卫生保健系统都很关心。

在这样一个系统中这本来就是一对潜在的矛盾,系统管理人员关心的

治疗成本而医生们关心的治疗效果。此时系统需求可能要建立在特殊

的包括一系列组织因素的政策上而不是技术需求。

11.1 Why it may be necessary to design the system architecture before the specification are written?

Solution:

The architecture may have to be designed before specifications are written to provide a means of structuring the specification and

developing different sub-system specifications concurrently,

to allow manufacture of hardware by sub-contractors and to

provide a model for system costing.

体系结构设计过程输出了一个体系结构的设计文档,这样的设计文档包含了一系列图形化的系统模型描述和一些相关的描述文本。该文当描述了系统如何有子系统构成以

及每个子系统如何有模块构成。

11.4 Giving reasons for your answer, suggest an appropriate

structural model for the following systems:

1.an automated ticket-issuing system used by passengers at a

railway station

2. a computer-controlled video conferencing system that allows

video, audio and computer data to be visible to several

participants at the same time.

3. a robot floor-cleaner that is intended to clean relatively clear

spaces such as corridors, the cleaner must be able to sense walls

and other sbstructions.

Solution:

Ticket issuing system . The most appropriate architectural model is a centralised model with a shared repository of route and

pricing information. This means that changes are immediately

available to all machines. As little local processing is

necessary, there is no real advantage in

a client-server architecture. The centralised system also allows

global information and route use to be collected and processed.

Video conferencing system. The most appropriate is a client-server model. The reason for this is the need for a lot of local

processing to handle multimedia data.

Robot floor cleaner. The most appropriate model is a repository model where all sub-systems place information in the repository

for other sub-systems to use. In the case of AI systems as this

would be, a special kind of repository called a blackboard is

normally used.

?11.4.1一个在铁路站旁,供乘客使用的自动售票系统

答:自动售票系统。最合适的架构模型是有共享数据仓库和定价信息的集中式控制模型。当使用这种模型时,所有机子能立即获取改变的信息。

由于没有局部处理的必要,所以使用客户/服务架构没有什么优势。集

中式控制系统允许全局信息和路径被收集和处理。

?11.4.2一个允许在同一时间段,视频,音频,计算机数据对很多参与者是可见的计算机控制视频会议系统

答:视频会议系统。最合适的是使用客户/服务模型。很多局部过程用来处理多媒体数据。

?11.4.3一个清洁机器人,主要用来清理一些地方比如走廊。该清洁机器人必须能感应墙和其他的障碍物。

答:清洁机器人。最适合的模型是贮藏式模型。这时所有的子系统把信息存放在其他子系统得贮藏室,以备后用。以AI系统为例,一种特殊的贮藏室叫做“黑板”被使用

?11.8 Discuss their advantages and disadvantages as far as distributability is concerned of the data-flow model and the object model. Assume that both single machine and distributed versions of an application are required.

?就分布性讨论数据流模型和对象模型的优点和缺点。假设应用程序的淡季和分布式版本都是必需的。

?Solution:

Both models can be distributed where each transformation in a DFD is implemented as a separate process and each object is

implemented as process. Problem with functional decomposition

is the need for shared state which must also be implemented as

one or more processes. In the object model, distributing objects

is a problem if inheritance is involved as this creates a lot

of network traffic.

两种模型都能作为分布式,数据流程图中的每个转换都可以看作是个分离的过程,而每个对象也可以作为过程实现。函数的分解需要共享状态,

并表示为一个或多个过程。在对象模型中分布对象是个问题,对象如

果继承的话就如同它的创建一样会造成很多网络阻塞。

?14.2 Using examples, explain the difference between an object and an object class.

?Solution:

?用例子,解释对象和对象类之间的不同。

An object class is a generic description of a set of entities (or objects) which have common characteristics and which are

recognizably the same in some or all respects. Objects are

specific instances in the real-world or in a system where values

have been assigned to the characteristics defined in the object

class. The set of values assigned to the object characteristics

may distinguish that object from all other objects but need not

do so. In the real-world, we only see objects and construct

object classes as abstract entities. In programs, we often only

define object classes and construct objects whose lifetime is

no longer than the execution time of the program.

对象类就是定义实体(或者说对象)的类型说明,包含可以被识别的相似的公共特征。对象是真实世界或是在系统中的通过对象类对其属性进行

赋值的特殊实例。给对象的赋值操作可用于识别与其他所有对象的区

别,尽管不需如此。在现实世界中,我们只能看到对象和作为抽象实

体的构造对象类。在程序中,我们通常可以定义对象类和构造对象,

它们的声明周期不超过程序的执行时间。

?An example of an object class is a BOOK which has attributes (characteristics) such as AUTHOR, TITLE, PUBLISHER, DATE OF PUBLICATION, etc.

一个叫做“BOOK”的对象类的例子,属性有诸如……

?An example of an object or instance of this object class is the specific book:

一个关于这个对象类的对象的例子“specific book”

?AUTHOR: Ian Sommerville

?TITLE: Software Engineering

?EDITION: 7

?PUBLISHER Addison-Wesley

?DATE 2004

?If we wished to define a book object which was distinct from all other objects, we would need to add another characteristic to the object class such as OWNER.

?16.2 Suggest situations where it is unwise or impossible to provide a consistent user interface.

?说明在什么情况下提供前后一致的用户界面是不明智的或是不可能的。

?Solution:

A consistent user interface may be impossible to produce for complex

systems with a large number of interface options. In such systems,

there is a wide imbalance between the extent of usage of

different commands so for frequently used commands, it is

desirable to have short cuts. Unless all commands have short cuts,

then consistency is impossible.

It may also be the case in complex systems that the entities manipulated are of quite different types and it is inappropriate

to have consistent operations on each of these types.

An example of such a system is an operating system interface. Even MacOS which has attempted to be as consistent as possible has

inconsistent operations that are liked by users.

For example, to delete a file it is dragged to the trash but dragging

a disk image to the trash does not delete it but unmounts that

disk.

一致性的用户界面也许不可能提供给拥有大量选项的复杂系统。

在这样的系统中,经常使用的不同命令的使用程度有很大差异,因此

我们希望用快捷方式。除非所有的命令都有快捷方式,否则一致性的

界面是不可能的。

此外在复杂的操作界面中有不同类型的操作实体,这些不同类型的操作实体拥有相同的操作是不可能的。

开放型操作系统就是这样一个系统的例子。甚至是竭力做到尽可能一致性界面的苹果操作系统(MacOS)都会根据不同的用户喜好而由

此产生矛盾。

再举个例子,用户要删除一个文件,只要把它拉到垃圾回收站,而删掉一个磁盘映像可不能这样,那要卸载那个磁盘。

?16.3 What factors have to be taken into account in the design of menu-based interface for …wa lk-up? system such as bank ATMs? Write a critical commentary on the interface of an ATM that you use.

?在为“临街的”系统(如ATM机)涉及基于菜单的界面时,必须考虑哪些因素?请对你所使用的ATM机的界面提出批评意见。

Solution:

Factors to be taken into account when designing 'walk up and use' systems are:

? System users may be infirm, or disabled so will not be able to respond quickly to requests.

? Users may not be able to speak the native language of the country where the machine is installed.

? System users may be completely unfamiliar with technology and may make almost any kind of error in using the machine. The interface

must minimise the number of possible errors and must be resilient

to any possible error.

? Some system users are likely to be intimidated by many options.

On the other hand, as users gain familiarity with the system,

they may expect to use it for a wider range of banking services.

? Different people may understand the meaning of icons in different ways.

? If the system has navigation options, users are almost certain to become lost.

? Most users will want to use the system for very simple functions

(e.g. withdraw cash from an ATM) and will want to do this as

quickly as possible.

There are many different ATM interfaces so each must be considered separately. Problems which I have found are:

When is it possible to cancel a transaction? What happens when I do so? What will I have to re-input if I restart the transaction?

There is not usually any way of saying give me the maximum amount of money I may withdraw today.

Some machines only support single transactions - there is no way of saying I will be making several transactions and the same

validation process is applicable to all of them.

?16.5 Discuss the advantages of graphical information display and suggest four applications where it would be more appropriate to use graphical rather than digital displays of numeric information.

?Solution:

?试述图形显示的优点,指出适合用图形显示数值而不适合用数字显示的四种应用。

Advantages are ‘at a glance’ magnitude indication and relative magnitude indication. Any applications where these are

important might be mentioned:

? Temperature control

? Speed indicators

? Weather statistics

? Relative comparisons of cars, etc.

优点是匆匆一眼就能获得数值暗示和相对数值暗示。

这里有四个适于图形显示信息,而不适用于数字显示信息的例子.

温度计速度指示器气候统计表一些相关的比较表格.

?17.3 When would you recommend against the use of an agile method for developing a software system?

?你在什么情况下会建议不采用敏捷方法进行软件系统开发?

Agile methods should not be used when the software is being developed by teams who are not co-located – if any of these teams use

agile methods, it is very difficult to coordinate their work with

other teams. Agile methods should probably also be avoided for

critical systems where the consequences of a specification error

are serious. In those circumstances, a system specification that

is available before development starts makes a detailed

specification analysis possible. However, some ideas from agile

approaches such as test first development are certainly

applicable to critical systems.

当几个软件开发团队不在同一个地方时不可用敏捷方法。如果其中一个团队用了敏捷方法,就很难跟其它团队协调工作.敏捷方法也要避免用在

关键系统,在规格错误的情况下如果用这个方法,会导致严重的后果.

在开发系统之前规格就可以用的情况下,可以做详细的规格分析使用

敏捷方法成为可能.然而,一些敏捷方法中的思想像测试优先开发

(Test First Development–TFD 又称先行测试开发)当然是可以适用

于关键系统的.

?17.5 Explain why test-first development helps the programmers develop a better understanding of the system requirements. What are the potential difficulties with test-first development?

?解释为什么测试优先开发能帮助程序员获得对系统需求的更好的理解。测试优先的开发有什么潜在的困难。

Test-first development helps with understanding the requirements because, in order to write a test, you have to analyse the

requirements in detail to discover what is intended. In many

cases, you may find that writing a test is impossible because

the requirements are incomplete.

The problem with test-first development is that some tests are very difficult to write because they require a system infrastructure

to be in place before anything can be tested.

?测试优先开发帮助我们更好地理解需求,因为你要写一个测试程序,就需要分析需求,探究详细意图。

?有时候,在需求不全的情况下,你会发现写一个测试是不可能的。测试优先开发的问题就在于是一些测试很难写,因为在任何一个测试之前都要一个就绪的系统底层结构.

?17.6 Suggest four reasons why the productivity rate of programmers working as a pair is roughly the same as two programmers working individually.

?给出四个理由说明为什么结对编程和单个程序员编程的软件生产率基本上是一样的。

Reasons why pair programming is as efficient as the same number of programmers working individually:

Pair programming leads to continuous informal reviewing. This discovers bugs more quickly than individual testing.

Information sharing in pair programming is implicit – it happens during the process.

Individual programmers have to spend time explicitly sharing information.

Pair programming encourages refactoring (the code must be understandable to another person). This reduces the costs of

subsequent development and change.

In pair programming, people are likely to spend less time in fine-grain optimization as this does not benefit the other

programmer.

结对编程和同等数量的编程人员单独编程一样有效的原因:

1.结对编程会引发连续非正式地复查,这样会比单独编程更快地发现错误。

2.结对编程过程中,信息是共享的。单独编程中,人们不得不花时间来共

享信息。

3.结对编程鼓励重构(代码需要让其他人看懂),这样减少了后期开发和

变动的成本。

4.结对编程可能花更少的时间在细节优化上,因为这对其他程序员来说没

有好处。(译者注:没看懂)

?17.8 A software manager is involved in the project development of a software design support system

?that supports the translation of software requirements to a form software specification. Comment on the advantages and disadvantages of the following development strategies:

?假设一个软件管理者参与了一个开发某个软件设计支持系统的项目,此系统是要支持将软件需求翻译成形式化软件描述。请评论下列开发策略的优点和缺点。

a)* Develop a throw-away prototype, evaluate, it then review the system

requirements. Develop the final system using C.

开发抛弃式原型,评估,然后审查系统需求。用C语言开发此系统。

Throw-away prototyping

Fast development and rapid feedback from users.

Likely to result in reasonable requirements.

Needs multiple development languages.

Costs more.

丢弃原型化方法:

快速的开发和快速的用户反馈.

可以带来合理的需求.

需要多种开发语言.

花费更高.

?b)* Develop the system from the existing requirements using Java, the modify it to adapt to any changed user requirements.

?适用java从现存的需求开始开发系统,然后修改它使之适应任何变更的用户需求。

Develop using C and X-windows

Fewer problems with training.

Known management strategy.

Requirements likely to be wrong so needs post-delivery modification.

训练几乎没问题

已知的管理策略.

需求可能的错误的,所以要交付修改.

?c)* Develop the system using incremental development with a user involved in the development team.

?适用增量式方法并让用户参与到开发团队来开发此系统。

Evolutionary prototyping

Fast feedback from users.

Rapid system delivery.

Readily adapted to evolving requirements.

Hard to manage.

Lack of standards for portability etc.

Likely to be unstructured causing future maintenance problems.

进化的方法.

快速的用户反馈.

快速的系统交付.

容易适应改变的需求.

很难管理

缺少可移植性的标准.

无特定系统结构,将导致以后的维护困难.

?18.2 Suggest why the saving in cost from reusing existing software is not simply proportional to the size of the components that are reused.

?解释下为什么通过复用已有的软件所节省的成本并不简单地与所适用的组件规模成比例。

?Solution:

If savings from reuse were proportional to the amount of code reused, then reusing 2000 lines of code would save twice as much as

reusing 1000 lines of code. However, to reuse 2000 lines of code,

that code must be understood and the costs of program

understanding are not linear – the more code to be understood,

the more effort it takes to understand it.

Furthermore, more changes may be required, the larger the amount of code reused so this also adds to the costs of reusing more

code.

Of course, all this is only true if the code has to be understood before it is reused. If it can be reused without change, then

savings from reusing large chunks of code tend to be

proportionally greater than savings from reusing small code

fragments.

如果复用节约的成本和复用的代码成比例,那么复用2000行代码就相当于复用两次1000行代码了。然而,复用2000行代码,那些代码必须

要被理解,程序理解的费用不是线性的——越多的代码,就需要越多

的努力去理解的。

而且,当需要更多的改动时,就需要更大量的代码复用,这也增加了成本。

?18.3 Give four circumstances where you might recommend against software reuse.

?给出你认为不应该适用软件复用的4种情况。

Solution:

Circumstances where software reuse is not recommended:

If the business status of the code provider is dubious. If the provider goes out of business, then no support for the reused

code may be available.

In critical applications where source code is not available. Testing the code to the required standards may be very difficult.

In small systems where the costs of reuse are comparable to the savings that result if code is reused.

In systems where performance is a critical requirement – specially developed code can usually be made more efficient.

?一如果代码提供商的运作状况不确定,或者提供商歇业,不支持代码的复用。

?二关键部分的代码不可用。要测试这些代码以达到所需标准,可能非常困难。

?三再利用所花的成本和再利用所节省下来的差不多的小型系统

四在一些关键需求在于性能的系统里,专门开发的代码通常更有效率。

?18.4 Why are patterns an effective form of design reuse? What are the disadvantages to this approach to reuse?

?为什么模式是一种有效的设计复用形式?这种复用方式的缺点是什么?

Patterns are an effective form of design reuse because the reflect accumulated wisdom that has been collected over several

applications rather than a single application (By definition,

a pattern is something that should appear in more than one

application). There are two problems with patterns for reuse.

The first is knowing which patterns actually have been

documented and then finding these patterns - the time taken to

do this can be significant. The second is that patterns are by

their nature generalisations so their performance is likely to

be limited. If performance is critical, then a special-purpose

tailored approach to a problem will almost always be more

effective.

?模式是一种有效的再利用设计,是因为它是很多人在应用中积累出来的智慧.这种方法有两种缺点:

?知道哪一个模式被存档,找到这些模式所花的时间是必要的.

? 2.很多模式是一般化的,很多性能可能被限制.如果性能是主要要求的话,那么为某一个问题问题特别研究的方法总是更有效率的.

?Identify six possible risks that can arise when systems are constructed using COTS. What steps can a company take to reduce these risks?

?Risks that can arise when systems are constructed using COTS include:

?Vendor risks: Failure of vendor to provide support when required

?Vendor goes out of business or drops product from its portfolio

?Product risks: Incompatible event/data model with other systems

?Inadequate performance when integrated with other systems

?Product is undependable in intended operating environment

?Process risk: Time required to understand how to integrate product is higher than expected.

?The risks can be addressed by only dealing with vendors that use an escrow system so that source code is available if they go out of business, by extensive research and testing of product capabilities before use, discussion with other users etc. In general though, because

?COTS are provided by external vendors, risk reduction is difficult.

?卖主风险:卖方无法提供必要的支持,卖方歇业或结束产品开发.

?产品风险:和其它系统不兼容,和其它系统组装时性能下降,在特定环境下,产品不可靠.

?过程风险:理解如何组装产品的时间超出预期.

?可以通过使用第三方系统来解决.这样的话,可以通过深入的研究,投入使用前的产品兼容性的测试,和其它用户讨论等方法来保证源代码的可用,如果卖方

歇业的话.

?通常,COST是由卖方提供的,要减少风险是困难的.

?19.1 Why is it important that all component interactions are defined through “requires” and “provides” interfaces?

?It is important to define all interactions through requires and provides interfaces so that the use of the component is completely independent of its implementation. If component interactions use some knowledge of the components that is not defined in the requires/provides interfaces then the coupling between the components is increased and it is harder to interchange one component for an equivalent component with the same interfaces.

?19.3 What are the fundamental differences between components and web services (see Chapter 12).

软件工程概论课后答案解析

第1章软件与软件工程的概念 1、1 举出您所知道的应用软件的例子。 办公软件、游戏软件、财务软件、银行软件、人事管理软件、工资管理软件、学籍管理软件等。 1、2 认为“软件就就是程序,软件开发就就是编程序。”这种观点就是否正确?为什么? 认为“软件就就是程序,软件开发就就是编程序。”这种观点就是错误的。 首先,软件就是计算机系统中与硬件相互依存的另一部分,它就是包括程序,数据及其相关文档的完整集合,程序只就是软件的组成部分之一;其次,在软件开发中,编程只就是软件开发过程的一个阶段。 1、3 如果将软件开发比作高楼大厦的建造,可以将软件的设计比作什么? 可以将软件的设计比作建筑设计,软件设计的成果相当于建筑设计的设计图纸。 1、4 什么就是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机:软件危机就是指在计算机软件的开发与维护过程中所遇到的一系列严重问题。 典型表现: (1)对软件开发成本与进度的估计常常很不准确。 (2)用户对“已完成的”软件系统不满意的现象经常发生。 (3)软件产品的质量往往靠不住。 (4)软件常常就是不可维护的。 (5)软件通常没有适当的文档资料。 (6)软件成本在计算机系统总成本中所占的比例逐年上升。 (7)软件开发生产率提高的速度,既跟不上硬件的发展速度,也远远跟不上计算机应用迅 速普及深入的趋势。 产生软件危机的原因:除了软件本身的特点,其原因主要有以下几个方面: (1) 缺乏软件开发的经验与有关软件开发数据的积累,使得开发工作计划很难制定。 (2) 软件人员与用户的交流存在障碍,使得获取的需求不充分或存在错误。 (3) 软件开发过程不规范。如,没有真正了解用户的需求就开始编程序。 (4) 随着软件规模的增大,其复杂性往往会呈指数级升高。需要很多人分工协作,不仅涉及技 术问题,更重要的就是必须有科学严格的管理。 (5) 缺少有效的软件评测手段,提交给用户的软件的质量不能完全保证。

软件工程课后习题参考答案

1.简述软件开发的本质。 答:软件开发的本质就是实现问题空间的概念和处理逻辑到解空间的概念和处理逻辑之间的映射。P19 2.简述实施软件开发的基本途径。 答:实施软件开发的基本途径是系统建模。所谓系统建模,是指运用所掌握的知识,通过抽象,给出该系统的一个结构——系统模型。P19 3.简述何谓模型以及软件开发中所涉及的模型。 答:模型是一个抽象。该抽象是在意图所确定的角度和抽象层次对物理系统的一个描述,描述其中的成分和成分之间所具有的特定语义的关系,还包括对该系统边界的描述。 软件开发中所涉及的模型可分为两大类,一类称为概念模型,描述了系统是什么;另一类统称为软件模型,描述了实现概念模型的软件解决方案。 4.简述软件开发所涉及的两大类技术。 答:软件开发所涉及的两大类技术为:一是求解软件的开发逻辑,二是求解软件的开发手段。 5、简述需求与需求规约的基本性质。 答:需求的基本性质:1) 必要的,该需求是用户所要求的。2)无歧义的,该需求只能用一种方式解释。3)可测的,该需求是可进行测试的。4)可跟踪的,该需求可从一个开发阶段跟踪到另一个阶段。5)可测量的,该需求是可测量的。 需求规约的基本性质:1)重要性和稳定性程度:按需求的重要性和稳定性,对需求进行分级。2)可修改的:在不过多地影响其他需求的前提下,可以容易地修改一个单一需求。 3)完整的:没有被遗漏的需求。4)一致的:不存在互斥的需求。 6、简述软件需求的分类。

答:软件需求可以分为两大类:一类是功能需求,一类是非公能需求,而非公能需求可 7、举例说明功能需求和非功能需求之间的基本关系。 答: 非功能需求可作用于一个或多个功能需求,例如 非功能需求可作用于一个或多个功能需求 其中,非功能需求1作用于功能需求1和功能需求3等;非功能需求2作用于功能需求2等。P24 8、有哪几种常用的初始需求发现技术 答:有5种常用的需求发现技术:自悟、交谈、观察、小组会和提炼。P26 9、简述需求规约的3种基本形式。 (1) 非形式化的需求规约。非形式化的需求规约即以一种自然语言来表达需求规约,如同使用一种自然语言写了一篇文章。(2) 半形式化的需求规约。半形式化的需求规约即以半形式化符号体系(包括术语表、标准化的表达格式等)来表达需求规约。(3)形式化的需求规约。形式化的需求规约即以一种基于良构数学概念的符号体系来编制需求规约,一般往往伴有解释性注释的支持。 P29 10、简述软件需求规约的内容和作用。 答:软件需求规约的内容有:引言、总体描述、特定需求、附录、索引。P28 需求规约的作用可概括为以下4点:1)需求规约是软件开发组织和用户之间一份事实上的技术合同书,是产品功能及其环境的体现。2)对于项目的其余大多数工作,需求规约是一个管理控制点。3)对于产品/系统的设计,需求规约是一个正式的、受控的起始点。4)需求规约是创建产品验收测试计划和用户指南的基础。P31 11、简述需求规约在项目开发中的基本作用。 答:需求规约的作用可概括为以下4点:1)需求规约是软件开发组织和用户之间一份事实上的技术合同书,是产品功能及其环境的体现。2)对于项目的其余大多数工作,需求

土木工程概论复习题库

工程管理之《土木工程概论》(06393)复习题库 一、单选题 1、目前世界最高的大厦在 C:阿联酋 2、十八层的房屋建筑属于D:高层建筑 3、建筑工程设计程序正确的是 A:方案设计→初步设计→技术设计→施工图设计 4、房屋建筑结构中的楼板通常是属于哪种基本构件A:受弯构件 5、下面哪个级别的建筑物的耐久性和重要程度最高A:一级建筑物 6、桥梁的下部结构由组成A:桥墩、桥台、基础 7、上海杨浦大桥属于D:斜拉桥 8、某大厦建成后存在严重质量问题,不得不爆破拆除,这说明工程项目具有D:不可逆转性的特征 9、也称片石,是采石场由爆破直接获得的形状不规则的石块 B:毛石 10、第一座依照现代钢框架结构原理建造起来的高层建筑是D:芝加哥家庭保险公司大厦 11、将建筑物从屋顶、墙面、楼层、基础等构件全部断开,即使建筑物的相邻部位也互不牵制,从而避免建筑物开裂的是 B:沉降缝 12、作为跑道和土质地面之间过渡用,主要用来减少飞机一旦冲出或偏离跑道时有损坏的危险C:跑道道肩 13、在地形图上或地面上选定线路的走向,并确定线路的空间位置过程是C:铁路定线 14、跨越码头与人工岛之间的连接通道被称为C:栈桥 15、在正常条件下,一条道路在单位时间内可通过的车辆数,称为道路 C:通行能力 16、下列关于高速铁路模式的说法哪一种是错误的 C:德国ICE模式:全部修建新线,旅客列车专用 17、下面港口堆场的分类是正确的D:按货物种类及使用特点分类:散货堆场、件杂货堆场、集装箱堆场 18、主干路的设计年限为C:20年 19、是建造各类工程设施的科学技术的总称 A:土木工程 20、是关于事物的基本原理和事实的有组织、有系统的知识B:科学 21、美国金门大桥是世界上第一座单跨超过千米的大桥、它属于D:悬索桥 22、桥梁按受力特点和结构体系主要分为C:梁式桥、拱桥、悬索桥、刚架桥、斜拉桥、组合体系桥 23、桥墩的作用是 B:支承在其左右两跨上部结构通过支座传来的竖直力和水平力 24、下列建筑中采用成束筒结构的是D:美国西尔斯塔楼 25、当建筑物建造在土层性质差别较大的地基上,可在房屋适当的位置设置垂直缝隙,将建筑物从屋顶、墙面、楼层、基础等构件全部断开,划分为若干个刚度较好的单元,从而避免建筑物开裂的构造是 B:沉降缝 26、工程项目管理难度最大的阶段是工程项目的A:实施阶段 27、上海东方明珠电视塔属于D:高耸结构建筑 28、是一种带状的、三维空间的人工构造物,它常和桥梁、涵洞、隧道等构成统一的工程实体,是供各种车辆和行人通行的工程设施 B:道路 29、是利用不适合种田的山泥,废土,砂等,加入少量水泥或石灰作固结剂及微量外加剂和适量水混合搅拌压制成型,自然养护或蒸养一定时间制成的 B:非烧结粘土砖 30、用于门窗等洞口上部用以承受洞口上部荷载的梁是 C:过梁 31、在港口中,对于汽车和装卸流动机械共同行驶的道路宽度一般不应小于C:10~12m 32、在路堤的路肩边缘以下、路堑路基面两侧的侧沟外,因填挖而形成的斜坡面,称为C:路基边坡 33、是由人工或机械开采出的较规则的六面体石块A:料石 34、地下铁道的施工方法主要分为两大类A:明挖法、暗挖法 35、高速公路定线的原则包括 B:路线与城市应有一定距离 36、道路的设计标高高于整个自然地面,需全部填土形成路基的是 A:路堤 37、轨道间宽度1435mm的轨道是 A:标准轨 38、下面哪个组成属于港口水域 D:港池、锚地、进港航道

软件工程课后习题答案

软件工程课后习题答案 习题1 略。 习题2 略。 习题3 略。 习题4 2.在什么情况下应该使用形式化说明技术?使用形式化说明技术时应遵守哪些准则? 人们在理解用自然语言描述得规格说明时,容易产生二义性。为了克服非形式化方法得缺点,人们把数学引入软件开发工程,创造了基于数学得形式化说明技术。 应用形式化方法得准则: (1)应该选用释放得表示方法; (2)应该形式化,但不要过分形式化; (3)应该估算成本; (4)应该有形式化方法顾问随时提供咨询; (5)不应该放弃传统得开发方法; (6)应该建立详尽得文档; (7)不应该放弃质量标准; (8)不应该盲目依赖形式化方法; (9)应该测试、测试再测试; (10)应该重用。 4.用有穷状态机说明自动化图书馆流通系统

习题5 略。 习题6 略。 习题7 略。 习题8 略。 习题9 1.什么就是面向对象方法学?它有哪些优点? 面向对象方法学,就是尽可能模拟人类习惯得思维方式,使开发软件得方法与过程尽可能接近人类认识世界解决问题得方法与过程,从而使得实现解法得解空间(也称为求解域)与描述问题得问题空间(也称为问题域)在结构上尽可能一致。 优点: 1.与人类习惯得思维方法一致; 2.稳定性好; 3.可重用性好; 4.较易开发大型软件产品; 5.可维护性好 10.建立订货系统得用例模型。 分析如下:从对这个订货系统得需求可以知道,仓库管理员通过放在仓库中得终端把零件入库/出库市事务报告给订货系统,系统接受到事务信息之后应该处理事务;采购员需要使用订货系统提供得产生报表功能,以获取订货报表。综上所述,用例如下: 习题10 1.用面向对象方法分析研究本书习题2第2题中描述得储蓄系统,试建立它得对象模型、动态模型与功能模型。

软件工程导论课后习题答案

第一章 一、什么是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机是指在计算机软件开发、使用与维护过程中遇到的一系列严重问题和难题。它包括两方面:如何开发软件,已满足对软件日益增长的需求;如何维护数量不断增长的已有软件。 软件危机的典型表现: (1) 对软件开发成本和进度的估计常常很不准确。常常出现实际成本比估算成本高出一个数量级、实际进度比计划进度拖延几个月甚至几年的现象。而为了赶进度和节约成本所采取的一些权宜之计又往往损害了软件产品的质量。这些都降低了开发商的信誉,引起用户不满。 (2) 用户对已完成的软件不满意的现象时有发生。 (3) 软件产品的质量往往是靠不住的。(4) 软件常常是不可维护的。 (5) 软件通常没有适当的文档资料。文档资料不全或不合格,必将给软件开发和维护工作带来许多难以想象的困难和难以解决的问题。 (6) 软件成本、软件维护费在计算机系统总成本中所占比例逐年上升。 (7) 开发生产率提高的速度远跟不上计算机应用普及的需求。 软件危机出现的原因: (1) 来自软件自身的特点:是逻辑部件,缺乏可见性;规模庞大、复杂,修改、维护困难。 (2) 软件开发与维护的方法不当:忽视需求分析;认为软件开发等于程序编写;轻视软件维护。 (3) 供求矛盾将是一个永恒的主题:面对日益增长的软件需求,人们显得力不从心。 二、假设自己是一家软件公司的总工程师,当把图给手下的软件工程师们观看,告诉他们及时发现并改正错误的重要性时,有人不同意这个观点,认为要求在错误进入软件之前就清楚它们是不现实的,并举例说:“如果一个故障是编码错误造成的,那么,一个人怎么能在设计阶段清除它呢?”应该怎么反驳他? 答:在软件开发的不同阶段进行修改付出的代价是很不相同的,在早期引入变动,涉及的面较少,因而代价也比较低;在开发的中期,软件配置的许多成分已经完成,引入一个变动要对所有已完成的配置成分都做相应的修改, 不仅工作量大,而且逻辑上也更复杂,因此付出的代价剧增;在软件“已经完成”是在引入变动,当然付出的代价更高。一个故障是代码错误造成的,有时这种错误是不可避免的,但要修改的成本是很小的,因为这不是 整体构架的错误。 三、什么是软件工程?它有哪些本质特征?怎样用软件工程消除软件危机? 1993年IEEE的定义:软件工程是:①把系统的、规范的、可度量的途径应用于软件开发、运行和维护过程,也就是把工程应用于软件;②研究①中提到的途径。 软件工程的本质特征: (1) 软件工程关注于大型程序(软件系统)的构造(2) 软件工程的中心课题是分解问题,控制复杂性(3) 软件是经 常变化的,开发过程中必须考虑软件将来可能的变化 (4) 开发软件的效率非常重要,因此,软件工程的一个重要课题就是,寻求开发与维护软件的更好更有效的方法和工具 (5) 和谐地合作是开发软件的关键(6) 软件必须有效地支持它的用户 (7) 在软件工程领域中是由具有一种文化背景的人替具有另一种文化背景的人(完成一些工作)消除软件危机的途径: (1) 对计算机软件有一个正确的认识(软件≠程序) (2) 必须充分认识到软件开发不是某种个体劳动的神秘技巧,而应该是一种组织良好、管理严密、各类人员协同配合、共同完成的工程项目 (3) 推广使用在实践中总结出来的开发软件的成功技术和方法 (4) 开发和使用更好的软件工具 四、简述结构化范型和面向对象范型的要点,并分析他们的优缺点。 1. 传统方法学:也称为生命周期方法学或结构化范型。优点:把软件生命周期划分成基干个阶段,每个阶段的任务相对独立,而且比较简单,便于不同人员分工协作,从而降低了整个软件开发过程的困难程度。缺点:当软件规模庞大时,或者对软件的需求是模糊的或会承受时间而变化的时候,开发出的软件往往不成功;而且维护起来仍然很困难。 2. 面向对象方法学:优点:降低了软件产品的复杂性;提高了软件的可理解性;简化了软件的开发和维护工作;促进了软件重用。 五、1-5 根据历史数据可以做出如下的假设: 对计算机存储容量的需求大致按下面公式描述的趋势逐年增加:M=(Y-1960) 存储器的价格按下面公式描述的趋势逐年下降:P1=×(美分/位) 如果计算机字长为16位,则存储器价格下降的趋势为:P2=×(美元/字) 在上列公式中Y代表年份,M是存储容量(字数),P1和P2代表价格。

土木工程概论习题汇总(答案)

土木工程概论复习题汇总 一;填空题。 1. 砖按生产工艺分—烧结砖—和非烧结砖。 2. 砂一般分为天然砂和—人工砂________ 。 3. 配置混凝土时应优先选用—中砂______ 。 4. 所谓灰是指石灰_和石膏。 5. 土木工程中使用的钢材是指_线材_______ 和型材。 6. 水泥按其用途及性能分为通用水泥、_专用水泥_、特性水泥。 7. 普通混凝土是由水泥、 _粗骨料_、细骨料、和 _水—拌合,经硬化而成的一种人 造石材。 8. 绝热材料按其成分分为无机材料和_有机材料_。 9. 将上部结构的荷载传给土地基,连接上部结构与地基土的下部结构称为—基 础__ 。 10. 常用工程地质测绘方法有相片成图法和 _实地测绘法—。 11. 通常把位于天然地基上,埋置深度小于5m的一般基础以及埋深度虽超过5m 但小于基础宽度的大尺寸基础,统称为天然地基上的_____ 浅基础。 12. 刚性基础通常由砖、毛石、_素混凝土 _、和灰土等材料做成。 13. 建筑物的基础分为刚性基础和柔性基础,钢筋混凝土基础属于—柔性________ 基 础。 14. 浅基础一般分为单独基础,_条形基础_、伐板基础和箱形基础、壳体基础。 15. 埋置深度大于_ 5米______ 或大于基础宽度的基础,称为深基础。 16. 桩按荷载传递方式分为端承桩和 _摩擦桩_。 17. 建筑物的基本构建可分为梁、板、—柱_、拱。 18. 梁和板都是工程结构中的 _受弯—构件。 19. 梁按支撑方式可分为—简支梁_、悬臂梁和连续梁。 20. 柱是工程结构中的 _ 受压—构件。 21. 框架结构承受—竖向—荷载能力强,但承受水平荷载能力差。 22. 当前我国的公路等级按照其使用任务、功能和适应的交通量分为_ 5 —个等 级。

软件工程导论课后题

1-5、根据历史数据可以做出如下的假设: 对计算机存储容量的需求大致按下面公式描述的趋势逐年增加:M=4080e0.28(Y-1960) 存储器的价格按下面公式描述的趋势逐年下降:P1=0.3×0.72Y-1974(美分/位) 如果计算机字长为16位,则存储器价格下降的趋势为:P2=0.048×0.72Y-1974(美元/字) 在上列公式中Y代表年份,M是存储容量(字数),P1和P2代表价格。 基于上述假设可以比较计算机硬件和软件成本的变化趋势。要求计算: (1) 在1985年对计算机存储容量的需求估计是多少?如果字长为16位,这个存储器的价格是多少? (2) 假设在1985年一名程序员每天可开发出10条指令,程序员的平均工资是每月4000美元。如果一条指令为一个字长,计算使存储器装满程序所需用的成本。(3) 假设在1995年存储器字长为32位,一名程序员每天可开发出30条指令,程序员的月平均工资为6000美元,重复(1)、(2)题。

2-4 目前住院病人主要由护士护理,这样做不仅需要大量护士,而且由于不能随时观察危重病人的病情变化,还会延误抢救时机。某医院打算开发一个以计算机为中心的患者监护系统,请分层次地画出描述本系统功能的数据流图。 医院对患者8监护系统的基本要求是随时接收每个病人的生理信号(脉搏、体温、血压、心电图等),定时记录病人情况以形成患者日志,当某个病人的生理信号超出医生规定的安全范围时向值班护士发出警告信息,此外,护士在需要时还可以要求系统印出某个指定病人的病情报告。 从问题陈述可知,本系统数据源点是“病人”和“护士”,他们分别提供生理信号和要求病情报告的信息。进一步分析问题陈述,从系统应该“定时记录病人情况以形成患者日志”这项要求可以想到,还应该有一个提供日期和时间信息的“时钟”作为数据源点。 从问题陈述容易看出,本系统的数据终点是接收警告信息和病情报告的护士。 系统对病人生理信号的处理功能主要是“接收信号”、“分析信号”和“产生警告信息”。 此外,系统还应该具有“定时取样生理信号”、“更新日志”和“产生病情报告”的功能。 为了分析病人生理信号是否超出了医生规定的安全范围,应该存储“患者安全范围”信息。此外,定时记录病人生理信号所形成的“患者日志”,显然也是一个数据存储。

软件工程习题答案参考

软件工程 绪论 1.什么是软件危机为什么会产生软件危机 答:软件危机是指在计算机软件的开发和维护过程中遇到的一系列严重问题。(1).软件维护费用急剧上升,直接威胁计算机应用的夸大。 (2).软件生产技术进步缓慢 2.什么是软件生产工程化工程化生产方法与早期的程序设计方法主 要差别在哪里 答:结构化程序设计地出现,使许多产业界认识认识到必须把软件生产从个人化方式改变为工程化。采用工程的概念、原理、技术和方法开发与维护软件,把经过时间考验而证明正确的管理技术和当前能够得到的最好的技术方法结合起来,以经济地开发出高质量的软件并有效地维护它,这就是软件工程,同时这也是工程化生产方法。 3.分别说明(1)软件开发方法与开发工具;(2)软件技术与软件管 理的相互关系。 答:(1)工具和方法,是软件开发技术的两大支柱,它们密切相关。当一种方法提出来并证明有效后,往往随之研制出相应的工具,来帮助实现和推行这种方法。新方法在推行初期,总有人不愿接受和采用。若将新方法融合于工具之中,使人们通过使用工具来了解新方法,就能更快促进新方法的推广。(2)在工业生产中,即使有先进的技术和设备,管理不善的企业也不能获得良好的效益。软件在生产中不能按质按时完成计划,管理混乱往往是其中的重要原因。所以对于

一个理想的软件工程环境,应该同时具备技术和管理两个方面。 4.试从你的亲身实践,谈谈软件工具在软件开发中的作用。 答:用C++开发一个软件,是校园一卡通的模块。首先,要在编辑程序支持下在计算机中输入源程序。然后编译程序,把源程序翻译成目标程序。如果发现错误,就重新调入编辑程序对源程序进行修改。编译通过后,再调用连接程序吧所有通过了编译目标程序连同与之有关的程序连接起来,构成一个能在计算机上运行的可执行软件。编译程序,编辑程序,连接程序以及支持他们的计算机操作系统,都属于软件工具。离开这些工具,软件开发就是去了支持,变得十分困难和低效,甚至不能运行。 5.什么是软件工程环境谈谈你对环境重要性的认识。答:方法与工具相结合,再加上配套的软、硬件支持就形成环境。例如在批处理时代,用户开发的程序是分批送入计算机中心的计算机的,有了错误,就得下机修改。程序员对自己写的程序只能继续地跟踪,思路经常被迫中断,效率难于提高。分时系统的使用,使开发人员从此能在自己的终端上跟踪程序的开发,仅此一点,就明显提高了开发的效率。 6. 何谓面向对象软件工程简述它与传统软件工程在各型软件开发中的作用。 答:以面向对象程序设计为基础。 7. 软件按规模大小可分成哪几类简述软件工程中各型软件开发中的作用。 答:按规模分为极小、小、中、大、甚大、极大。(1)中小型软件:

土木工程概论习题答案

土木工程概论习题 第一章绪论 1.1土木工程概论课程的任务 1、简述土木工程的概念及其包含的内容。 答:概念:土木工程是建造各类工程设施的科学技术的总称,它即指工程建设的对象,即建在地上、地下、水中的各种工程设施,也指所应用的材料、设备和所进行的勘探设计、施工、保养、维修等技术。 包含的内容:基础工程、房屋建筑工程、交通土建工程、桥梁工程、港口工程、地下工程、水利水电工程。 1.2土木工程发展历史概述 1、简述古代土木工程的特点。 答:没有系统的设计理论,主要依靠经验 2、简述近代土木工程的特点。 答:(1)、有了比较系统的设计理论,如1683年意大利学者伽利略发表了“关于两门新科学的对话”,首次用公式表达了梁的设计理论;1687年牛顿总结出力学三大定律,为土木工程奠定了力学分析基础;1825年,法国的纳维于1825年建立了土木工程中结构设计的容许应力法。(2)、从材料方面讲,1824年波特兰水泥发明;1867年钢筋混凝土开始应用于土木工程;1859年转炉法炼钢发明 3、简述现代土木工程的特点。 答:(1)、功能要求多样化:由于电子技术,精密机械,生物基因工程,航空航天等高技术工业的发展,许多工业建筑提出了恒湿、恒温、防微震、防腐蚀、防辐射、防磁、无微尘等要求,并向跨度大、分隔灵活、工厂花园化的方向发展。 (2)、城市建设立体化:经济发展、人口增多,造成城市用地紧张、交通拥挤。 (3)、交通工程快速化:市场经济要求运输系统快速、高效,现代化技术的进步提供了条件。(4)、工程设施大型化 1.2土木工程的未来 1、目前土木工程面临的形势有哪些? 答:(1)、世界正经历工业革命以来的有一次重大变革,这便是信息(包括计算机、通信、网络等)工业的迅猛发展,可以预计人类的生产、生活方式将会发生重大变化。 (2)、航空、航天事业等高科技事业的发展,月球上已经留下了人类的足迹,对火星及太阳系内外星空的探索已取得了巨大进步。 (3)、地球上居住人口激增,目前世界人口已经达60亿,预计21世纪末,人口要接近百亿。地球上的资源有限,日益浩劫 (4)、生态环境受到严重破坏,随着工业的发展、技术的进步,人类的生存环境却日益恶化。 2、未来土木工程的发展趋势? 答:(1)、重大工程项目将陆续兴建 (2)、土木工程将向太空、海洋、荒漠地开拓 (3)、工程材料向轻质、高强、多功能化发展 传统材料的改性、化学合成材料的应用 (4)、设计方法精确化,设计工作自动化 (5)、信息和智能化技术全面引人土木工程

软件工程概述习题及答案

第一章软件工程概述 一. 填空题 1. 软件的发展过程, , , . 2. 基于软件的工作方式,软件可以划分为, , , . 3. 在软件发展的第四阶段计算机体系结构迅速地从环境转变为环境. 4. 在计算机系统中,软件是, 而硬件是. 5. 软件危机是在软件发展第阶段末期,随着第代计算机和诞而产生。 6. 文档一般可分为面向的文档,面向的文档,面向的文档和面向的文档。 7. 软件生存期若分为三个大的阶段,,. 8. 它是经过阶段评审后的软件配置成分(各个阶段产生的文档或程序代码)。 9. 在软件的生存周期开发阶段要经三个步骤, , 。 10. 瀑布模型是以文档为驱动、适合于的软件项目的模型。 11. 螺旋模型将开发过程分为几个螺旋周期,在每个螺旋周期内为,, 和四个步骤。 12. 软件开发的螺旋模型综合了瀑布模型和演化模型的优点,还增加了____。采用螺旋模型时,软件开发沿着螺线自内向外旋转,每转一圈都要对____ 进行识别和分析,并采取相应的对策。螺旋线第一圈的开始点可能是一个____ 。从第二圈开始,一个新产品开发项目开始了,新产品的演化沿着螺旋线进行若干次迭代,一直运转到软件生命期结束。 13. 软件开发模型, , , , , . 14. 软件工程面临的问题有, , , . 15. 面向对象方法学把客观世界的事物或实体都看成对象,把对象作为分析设计的元素,把所有对象都划分成对象类,类可以派生和. 16.基于软件的功能划分可以把软件划分为, ,和。 17.计算机系统发展的早期所形成的一系列错误概念和做法,已经严重地阻碍了计算机软件的开发,甚至有的根本无法维护,只能提前报废,造成大量人力、物力的浪费,从而导致软件危机。为了研究解决的方法,计算机科学技术领域中的一门新兴的学科逐步形成了,这就是。18.软件工程是指导的一门工程学科。采用工程的概念、原理、技术和方法来开发与维护软件,把经过时间考验而证明正确的管理技术和当前能够得到的最好的技术方法结合起来,这就是软件工程。 19.为了开发出低成本高质量的软件产品,软件工程学应遵守以下基本原则:, ,和, 。 20.原型模型是从需求分析开始。软件开发者和用户在一起定义,说明需求,并规划出定义的区域。然后快速设计软件中对用户/客户可见部分的表示。快速设计导致了原形的建造,原形由用户/客户评估,并进一步求精。

软件工程课后参考答案

第一章 1.1什么是计算机软件?软件的特点是什么? 计算机软件是指计算机系统中的程序及其文档 软件的特点: ●软件是一种逻辑实体,而不是有形的系统元件,其开发成本和进度难以准确地估算。 ●软件是被开发的或被设计的,没有明显的制造过程,一旦开发成功,只需复制即可, 但其维护的工作量大。 ●软件的使用没有硬件那样的机械磨损和老化问题。 1.2简述软件的分类,并举例说明 1.系统软件 系统软件居于计算机系统中最接近硬件的一层,其他软件一般都通过系统软件发挥作用。例如:编译软件、操作系统。 2.支撑软件 支撑软件是支撑软件的开发和维护的软件。例如:数据库管理系统、网络软件、软件工具、软件开发环境。 3.应用软件 应用软件是特定应用领域专用的软件。例如:工程/科学计算机软件、嵌入式软件、产品线软件、Web应用软件、人工智能软件。 1.3简述软件语言的分类,并举例说明。 1.需求定义语言 是用于书写软件需求定义的语言。例如:PSL/PSA。 2.功能性语言 是用于书写软件功能规约的语言,通常又称为功能规约语言。例如:广谱语言、Z 语言。 3.设计性语言 是用于书写软件设计规约的语言。例如:PDL。 4.实现性语言 也称为程序设计语言,是用于书写计算机程序的语言。例如:C、java、PROLOG、FORTRAN、COBOL、Modula。 5.文档语言 是用于书写软件文档的语言。通常用自然语言或半形式化语言书写。 1.4什么是软件工程? 软件工程是应用计算机科学、数学及管理科学等原理,开发软件的工程。软件工程借鉴传统工程的原则、方法,以提高质量、降低成本为目的。 1.5简述软件工程的基本原则。 软件工程原则包括围绕工程设计、工程支持和工程管理所提出的以下4条基本原则。 1.选取适宜的开发模型 必须认识需求定义的易变性,采用适宜的开发模型,保证软件产品满足用户的要求。 2.采用合适的设计方法

土木工程概论习题汇总[1]

土木工程概论习题汇总

一、单项选择题 1、()是双向行车道、中央设有分车带、进出口一般全控制或部分控制,为城市大量、长距离、快速交通服务。 A、快速道; B、主干道; C、次干道; D、支道。 2、公路路基的()形式有路堤、路堑和半填半挖三种。 A、功能; B、结构; C、平面布置; D、横断面。 3、下列哪一项不属于公路的技术标准()。 A、几何标准; B、载重标准; C、净空标准; D、速度标准。 4、我国已建成的高速公路总里程已居世界第()位。 A、一; B、二; C、三; D、四。 5、()沿线有安全设施、交通管理设施、服务性设施、环境美化设施。 A、高速公路; B、城市道路; C、乡村公路; D、县乡公路。 6、()设施一般为高速公路入口控制、交通监控设施。服务性设施一般有综合性服务站、小型休息点、停车场等。 A、安全; B、交通管理; C、服务性; D、环境美化。 7、()设施一般包括标志(如警告、限制、指示标志等)、标线、护栏、隔离设施、照明及防眩设施、视线诱导设施。 A、安全; B、交通管理; C、服务性; D、环境美化。 8、()分为:快速道、主干道、次干道、支道、居住区道路、风景区道路、白行车专用道。 A、高速公路; B、城市道路; C、乡村公路; D、县乡公路。 9、公路基本()形式有:全挖式、台口式和半山洞式。 A、涵洞; B、排水; C、遂道; D、路堑。 10、()是指一条道路在单位时间内,道路与交通正常条件下,保持一定速度安全行驶时,可通过的车辆数。 A、高速公路; B、城市道路; C、通行能力; D、交通能力。 11、第一条完全用于客货运输而且有特定时间行驶列车的铁路,是()年通车的英国利物浦与曼彻斯特之间的铁路,这条铁路全长为563 km。 A、1830; B、1863; C、1892; D、1919。 12、高速铁路的信号与()是高速列车安全、高密度运行的基本保证。 A、灯光系统; B、控制系统; C、路基; D、铁路平顺度。

软件工程课后习题答案

软件工程课后习题答案 第一章 一、什么是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机是指在计算机软件开发、使用与维护过程中遇到的一系列严重问题和难题。它包括两方面:如何开发软件,已满足对软件日益增长的需求;如何维护数量不断增长的已有软件。软件危机的典型表现: (1) 对软件开发成本和进度的估计常常很不准确。常常出现实际成本比估算成本高出一个数量级、实际进度比计划进度拖延几个月甚至几年的现象。而为了赶进度和节约成本所采取的一些权宜之计又往往损害了软件产品的质量。这些都降低了开发商的信誉,引起用户不满。 (2) 用户对已完成的软件不满意的现象时有发生。 (3) 软件产品的质量往往是靠不住的。 (4) 软件常常是不可维护的。 (5) 软件通常没有适当的文档资料。文档资料不全或不合格,必将给软件开发和维护工作带来许多难以想象的困难和难以解决的问题。

(6) 软件成本、软件维护费在计算机系统总成本中所占比例逐年上升。 (7) 开发生产率提高的速度远跟不上计算机应用普及的需求。软件危机出现的原因: (1) 来自软件自身的特点:是逻辑部件,缺乏可见性;规模庞大、复杂,修改、维护困难。 (2) 软件开发与维护的方法不当:忽视需求分析;认为软件开发等于程序编写;轻视软件维护。 (3) 供求矛盾将是一个永恒的主题:面对日益增长的软件需求,人们显得力不从心。 二、假设自己是一家软件公司的总工程师,当把图1.1给手下的软件工程师们观看,告诉他们及时发现并改正错误的重要性时,有人不同意这个观点,认为要求在错误进入软件之前就清楚它们是不现实的,并举例说:“如果一个故障是编码错误造成的,那么,一个人怎么能在设计阶段清除它呢?”应该怎么反驳他? 答:在软件开发的不同阶段进行修改付出的代价是很不相同的,在早期引入变动,涉及的面较少,因而代价也比较低;在开发的中期,软件配置的许多成分已经完成,引入一个变动要对所有已完成的配置成分都做相应的修改, 不仅工作量大,而且逻辑上也更复杂,因此付出的代价剧增;在软件“已经完成”是在引入变动,当然付出的代价更高。一个故障是代码错误造成的,有时这种错误是不可避免的,但要修改的成本是很小的,因为这不是整体构架的错误。

软件工程概论课后习题答案

软件工程概论郑人杰等版 第1章软件与软件工程的概念 1.1 举出你所知道的应用软件的例子。 办公软件、游戏软件、财务软件、银行软件、人事管理软件、工资管理软件、学籍管理软件等。 1.2 认为“软件就是程序,软件开发就是编程序。”这种观点是否正确?为什么? 认为“软件就是程序,软件开发就是编程序。”这种观点是错误的。 首先,软件是计算机系统中与硬件相互依存的另一部分,它是包括程序,数据及其相关文档的完整集合,程序只是软件的组成部分之一;其次,在软件开发中,编程只是软件开发过程的一个阶段。 1.3 如果将软件开发比作高楼大厦的建造,可以将软件的设计比作什么? 可以将软件的设计比作建筑设计,软件设计的成果相当于建筑设计的设计图纸。 1.4 什么是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机:软件危机是指在计算机软件的开发和维护过程中所遇到的一系列严重问题。 典型表现: (1)对软件开发成本和进度的估计常常很不准确。 (2)用户对“已完成的”软件系统不满意的现象经常发生。 (3)软件产品的质量往往靠不住。 (4)软件常常是不可维护的。 (5)软件通常没有适当的文档资料。 (6)软件成本在计算机系统总成本中所占的比例逐年上升。 (7)软件开发生产率提高的速度,既跟不上硬件的发展速度,也远远跟不上计算机应用 迅速普及深入的趋势。 产生软件危机的原因:除了软件本身的特点,其原因主要有以下几个方面: (1) 缺乏软件开发的经验和有关软件开发数据的积累,使得开发工作计划很难制定。 (2) 软件人员与用户的交流存在障碍,使得获取的需求不充分或存在错误。 (3) 软件开发过程不规范。如,没有真正了解用户的需求就开始编程序。 (4) 随着软件规模的增大,其复杂性往往会呈指数级升高。需要很多人分工协作,不仅涉及 技术问题,更重要的是必须有科学严格的管理。

《土木工程概论》复习题及标准答案

《土木工程概论》复习题及答案

————————————————————————————————作者:————————————————————————————————日期:

《土木工程概论》复习题及答案 一、填空题 1、土木工程包括、、 和等工程。 2、土木工程结构中常用的结构及构件形式包括、、 、和等。 3、钢筋混凝土结构主要包括框架结构体系、、、 等。 4、特种结构包括烟囱、、、、 、等。 5、桥梁结构主要包括、、、、 等。 6、我国第一条开工建设的高速公路是。 7、隧道工程的施工方法有和等几种。 8.工程规范分为,、和四级。 9.土木工程抗灾主要是和工程结构在受灾以后的 与等。 10.建设程序是指建设项目从、、、 、、到竣工验收,投入生产的整个建设过程中,各项工作必须遵守先后次序的法则。 11、岩石按成因分为、、。 12、路基可分为、和三种。 13、3级以上的地震称,5级以上的地震称。 14.项目管理基本目标有三个最主要的方面:, 和。 15.建设监理是指受的委托对或 进行监督和管理的活动。 16.建设项目管理的核心内容可概括为“三控制、二管理、一协调”,即、、、、、 和。 17.年月日国家建设部颁发了 《》,这是我国第一个建设监理的法规性文件。 18.工程建设监理的中心任务是、和。 答案: 1、建筑工程、道路工程、桥梁工程、给水排水工程、地下工程、铁路工程、隧道工程、港口工程、机场工程(任意4个即可) 2、墙、板、梁、柱、拱、壳、杆(填出5个即可) 3、剪力墙结构体系、框架剪力墙结构体系、筒体结构体系

4、冷却塔、水池、水塔、料斗、筒仓、桅杆结构(填出其中5个即可) 5、梁式桥、桁架桥、拱桥、刚架桥、悬索桥、斜拉桥(填出其中5个即可) 6、沈阳至大连高速公路 7、明挖、暗挖、盖挖、顶进、盾构(填出其中2个即可) 8.全国性的建设规范,地方性建设规范,地方性建设规章,各主管机构制定的规范。9.工程结构抗灾,检测,加固。 10.立项、报建;可行性研究;选择建设地点;编制设计任务书;编制勘察设计文件;建设施工 11、岩浆岩、沉积岩、变质岩。 12、路堤、路堑、半挖半填。 13、有感地震,破坏性地震。 14.专业目标,工期目标,费用目标。 15.监理单位、建设单位、工程建设全过程、项目实施阶段。 16.进度控制、质量控制、费用控制、合同管理、信息管理、组织协调。 17.1989、7、28、《建设监理试行规定》。 18.工程质量控制、工程投资控制、建设工期控制。 二、不定项选择题 1,土木工程包括() A,工程建设的对象 B,工程应用的材料设备 C,工程中进行的勘测设计D, 工程施工 2,砖、瓦、砂、石、灰属于() A,地方材料 B,结构材料 C,功能材料 D,工程材料 3,工程地质勘查的目的主要有() A,查明工程地质条件 B,分析存在的地质问题 C,寻找适宜的施工地区 D,对建筑地区做出地质评价 4,属于建筑基本构件的有() A, 板 B, 梁 C, 柱 D, 桩 5,中国的北京故宫属于() A, 钢结构 B, 砖石结构 C, 木结构 D, 钢筋混凝土结构 6,土木工程全面引入信息和智能化技术大致表现在() A, 信息化施工 B, 智能化建筑 C, 智能化交通 D, 工程分析仿真系统 7,砖砌体中使用的砂粒直径应小于() A, 1.5 mm B, 2 mm C, 2.5 mm D, 3 mm 8,可用于制造砂浆的胶凝材料是() A, 石灰 B, 水泥 C, 沥青 D, 石膏 9,浅基础按基础刚度的不同可分为() A, 刚性基础 B, 柔性基础 C, 扩展基础 D, 拓展基础 10,现在发现我国古代曾使用过的地基处理方法有() A, 夯实法 B, 预压法 C, 搅拌法 D, 振冲法 答案:1ABCD 2A 3ABD 4ABC 5C 6ABCD 7C 8ABD 9AC 10A 三、单项选择题

软件工程课后习题答案第五版

软件工程课后习题答案第五版 《软件工程导论》课后习题答案 第一章软件工程概论 1.什么是软件危机? 软件危机是指在计算机软件的开发和维护过程中所遇到的一系列严重问题。这些问题表现在以下几个方面: (1)用户对开发出的软件很难满意。 (2)软件产品的质量往往靠不住。 (3)一般软件很难维护。 (4)软件生产效率很低。 (5)软件开发成本越来越大。 (6)软件成本与开发进度难以估计。

(7)软件技术的发展远远满足不了计算机应用的普及与深入的需要。 2.为什么会产生软件危机? (1) 开发人员方面,对软件产品缺乏正确认识,没有真正理解软件产品是一个完整的配置组成。造成开发中制定计划盲目、编程草率,不考虑维护工作的必要性。 (2) 软件本身方面,对于计算机系统来说,软件是逻辑部件,软件开发过程没有统一的、公认的方法论和规范指导,造成软件维护困难。 (3) 尤其是随着软件规模越来越大,复杂程度越来越高,原有软件开发方式效率不高、质量不能保证、成本过高、研制周期不易估计、维护困难等一系列问题更为突出,技术的发展已经远远不能适应社会需求。 3.怎样克服软件危机? (1) 充分吸收和借鉴人类长期以来从事各种工程项目中积累的行之有效的有效原理、概念、技术与方法,特别是吸取几十年来人类从事计算机硬件研究和开发的经验教训。在开发软件的过程中努力作到良好的组织,严格的管理,相互友好的协作。

(2) 推广在实践中总结出来的开发软件的成功的技术和方法,并研究更好、更有效的技术和方法,尽快克服在计算机系统早期发展阶段形成的一些错误概念和作法。 (3) 根据不同的应用领域,开发更好的软件工具并使用这些工具。将软件开发各个阶段使用的软件工具集合成一个整体,形成一个很好的软件开发支环环境。 总之为了解决软件危机,既要有技术措施(方法和工具),又要有必要的组织管理措施。 4.构成软件项目的最终产品: 应用程序、系统程序、面向用户的文档资料和面向开发者的文档资料。 5.什么是软件生存周期? 软件生存周期是指从软件定义、开发、使用、维护到淘汰的全过程。 6.软件生存周期为什么划分成阶段? (1) 任何一个阶段的具体任务不仅独立,而且简单,便于不同人员分工协作,从而降低整个软件开发工作的困难程度。

软件工程导论第六章课后答案

计算机科学与技术 第六章习题答案 4、图6.18给出的程序流程图代表一个非结构化的程序,问: (1)为什么说它是非结构化的? (2)设计一个等价的结构化程序。 (3)在(2)题的设计中使用附加的标志变量flag了吗?若没有,再设计一个使用flag的程序;若用了,再设计一个不用flag的程序。 图6.18 一个非结构化程序 答:(1)图示程序的循环控制结构有两个出口,不符合结构程序的定义,因此是非结构化的程序。 (2)设计的等价结构化程序盒图如下所示:

(3)在第(2)题中没有使用标志变量flag,设计使用附加的标志变量flag,将上述程序改成等价的结构化程序,如下盒图所示: 7、某交易所规定给经纪人的手续费计算方法如下:总手续费等于基本手续费加上与交易中的每股价格和股数有关的附加手续费。如果交易总金额少于1000元,则等于手续费为交易金额的8.4%;如果交易总金额在1000元到10000元之间,则基本手续费为交易金额的5%,再加34元;如果交易总金额超过10000元,则基本手续费为交易金额的4%加上134元。当每股售价低于14元时,附加手续费为基本手续费的5%,除非买进、卖出的股数不是100的倍数,在这种情况下附加手续费为基本手续费的9%。当每股售价在14元到25元之间时,附加手续费为基本手续费的2%,除非交易的股数不是100的倍数,在这种情况下附加手续费为基本手续费的6%。当每股售价超过25元时,如果交易的股数零散(即,不是100的倍数),则附加手续费为基本手续费的4%,否则附加手续费为基本手续费的1%。要求:(1)用判定表表示手续费的计算方法。(2)用判定树表示手续费的计算方法。答:(1)用判定表表示手续费的计算方法如下所

软件工程课后习题答案

第一章 1.1举出至少5个例子来说明“意外效应法则”在计算机软件方面的应用。 答:典型的例子包括使用“数字汽车仪表板”的软件,赋予高科技,高品质的图像的软件;如广泛的消费类电子产品的软件;个人电脑,工业仪器仪表和机器的软件。软件分化出的在电子商务方面的应用。 1.2举例说明软件对社会的影响(包括正面影响和负面影响)。 答:这是一个很好的课堂讨论问题(如果时间允许),而不是专注于老生常谈的(但很重要)隐私问题,生活质量等问题。您可能想要讨论关于”技术恐惧“方面的问题,软件也许会使它恶化但也可能减少”技术恐惧“。另一个有趣的方面是使用诺依曼的“风险”列在中做重点讨论。你也可以考虑基于软件的“现金”经济,新模式的互动娱乐,虚拟现实,电子商务等方面来思考软件对社会的影响。 1.3针对1.1节提出的5个问题,请给出你的答案,并与同学讨论。 答:软件需要如此长的开发时间: a)设施不上线 b)开发工具并不如预期般运作 c)客户提出的新要求,需要重新设计和返工 d)产品依赖于政府的规定,被意外更改。 e)严格的要求,与现有系统的兼容性需要超过预期更多的测试,设计和实现。 f)多个操作系统下运行的任务需求比预期需要更长的时间。 g)软件项目风险管理比预期需要更多的时间。 h)依赖的技术仍处于开发阶段,从而延长日程安排。 开发成本高: a)比当时预期低得令人无法接受的质量,需要进行更多的测试,设计和实施工作。 b)制定了错误的软件功能需要重新设计和实施。 c)开发错误的用户界面,而导致重新设计和实施。 d)开发了不需要的额外的软件功能而延长了开发日程安排。 在将软件交付顾客使用之前,我们无法找到所有错误: a)产品依赖于政府监管,意外而改变。 b)产品技术标准草案,会意外更改。 c)有时会在项目后期添加新的开发人员。 d)因为团队内的冲突有时会导致沟通不畅,而产生糟糕的设计。 e)破坏高效调度产生的项目管理成果和无效的规划 f)有时装备部件质量差,导致额外的测试,设计和集成工作和管理额外的客户关系。 软件开发和维护的过程仍旧难以度量: a)有时该项目的目的是不明确。 b)有大量的业务所涉及的风险。 c)如果产品内置没有装好。 d)我们需要不断检讨我们的工作。 e)进行维护检查的时间。 f)在整个软件开发过程中要彻底组织项目团队。 1.4在交付最终用户之前,或者首个版本投入使用之后,许多应用程序都会有频繁的变更。

相关文档
相关文档 最新文档