The report is divided into 5 Chapters. Chapter 1 providing background information on Project Management, the various tools and techniques of Project Management and its relevance to the construction industry in India and UK. An overview of the construction industry is provided in Chapter 2. Chapter 3 comprises of the main research and studies from existing literature with particular emphasis on PM tools and its relevance to the construction industry. Chapter 4 describes the research methodology deployed for this research. In Chapter 5 the analysis and the findings of the survey is presented. The report ends with Chapter 6 where the discussion and the conclusion of the report are given with some recommendations for further research also presented.

--------------------------------------------------------------------------------

Chapter 1: Introduction

Background

Purpose

Scope

Project Overview

Chapter 2: Overview of the Construction Industry

Overview of the UK Construction Industry

Overview of the Indian Construction Industry

Chapter 3: Literature Review

Chapter overview

Introduction

Definition of Project Management

Functions of the project management in the construction industry Relevance of Project Management tools in Construction Industry

Project Management tools

Definition and Description of Gantt Charts

Critical Assessment of Gantt Charts

Network Analysis Technique

Definition and Description of CPM

Critical Assessment of CPM

Definition and Description of PERT

Critical Assessment of PERT

Project Management Software

Microsoft Project

PRINCE

Primavera

Implications of Cultural differences on Project Management approaches in

UK and India

Previous Surveys on the use of Project Management tools and techniques

Chapter 4: Research Methodology

Methodology

Nature of Data gathered

Research Planning

Data Sources

Secondary Data Research

Primary Research

Exploratory research

Conclusive research

Primary Data Collection Techniques

Qualitative Research

Advantages of qualitative research

Disadvantages of qualitative research

Quantitative Research

Advantages of quantitative research

Disadvantages of quantitative research

Methods of Data Collection

Interviews

Telephone interviews

Questionnaires

What can questionnaires measure?

Pilot Testing

Sampling

Target Organisations

Conclusion

Chapter 5: Findings and Analysis

Introduction

Theory of Questionnaire Analysis

Findings and Analysis of the UK based construction companies according to their sizes

Interviews conducted for the India based construction companies Interviews Conducted for the UK based construction companies Comparison of Findings and analysis of India and UK based construction companies

Chapter 6: Discussion, Conclusion and Recommendation

Introduction

Discussion

Conclusion

代写留学生论文Recommendations for further research

References

Appendix 1 Questionnaire

Appendix 2 Interview Questions Appendix 3 Questionnaire Analysis 1 Appendix 4 Questionnaire Analysis 2 Appendix 5 Interview - Indian companies Appendix 6 Interview - UK companies

2018年10月自考《工程项目管理》考试真题整理(全套试卷)

2018年10月自考《工程项目管理》考试真题整理(全套试卷) 一、单项选择题 在每小题列出的四个备选项中只有一个是符合题目要求的。错选、多选或未选均无分。 1.建设工程项目管理的核心任务是项目的 A.目标规划 B.目标比选 C.目标论证 D.目标控制 2.建设工程保修期内,由于设计原因造成屋面漏水,负责维修的是 A.设计单位 B.施工单位 C.监理单位 D.业主 3.项目人力资源管理的主体是 A.企业人事经理 B.项目经理

C.监理工程师 D.施工队长 4.在满足工程质量验收标准的前提下,工程项目质量总目标的提出者是 A.施工单位 B.业主 C.监理单位 D.设计单位 5.隐蔽工程隐蔽前,应通知前来验收的对象是 A.施工单位 B.设计单位 C.建设单位 D.政府主管部 6.国际标准化组织的缩写是 A.AIA B.IsOC C.DIA

D.ASI 7.投资决策后,投资控制的关键应放在 A.设计阶段 B.招投标阶段 C.施工阶段 D.竣工验收影 8.单代号网络图中, A.一项工作民 B.工作开始或结束时间 C.工作逻辑关系 D.工作线路 9.关于双代号网络图中,下列说法正确的是 A.节点表示工作,箭线表示工作之间的逻辑关系 B.节点表示工作时间,箭线表示工作进行的方向 C.节点表示工作的开始或结束,箭线表示工作进行的方向 D.节点表示工作之间的逻辑关系,箭线表示工作及其进行的方向

10.工程项目安全生产的总负责人是 A.项目经理 B.总监理工程师 C.业主 D.总监代表 11.某项目发生生产安全事故,造成直接经济损失达1.5亿元,该事故可判定为 A.一般事故 B.较大事故 C.重大事故 D.特别重大事故 12.PDCA循环中的PDCA分别指 A.计划、检查、实施、处置 B.计划、处置、检查、实施 C.计划、实施、检查、处置 D.检查、计划、实施、处置 13.虚工作的特点是

工程项目管理卷自考复习题(有答案)

《工程项目管理》自考复习题 一、单选题 1.项目管理的国际化趋势在全世界越来越明显,工程项目管理的国际惯例通常不包括(D) A.推行工程可行性研究B.推行工程招标投标 C.推行FIDIC合同条件D.推行代建制模式 2.PMBOK的概念是由哪个组织提出?(A) A.美国项目管理协会B.中国项目管理协会 C.国际项目管理协会D.国际工程师联合会 3.以下不是工程项目组织特征的是(B)D A.临时性B.柔性 C.弹性D.稳定性 4.2001年我国颁布了哪项国家标准,对促进我国建设工程项目管理科学化、规范化和法制化具有重大作用?(D)C A.工业可行性研究编制手册B.工程网络计划技术规程 C.项目管理实施细则D.建筑工程项目管理规范 5.从项目的生命周期看,项目的前期费用投入情况和对工程寿命期的影响情况分别是哪项?(B) A.小,小B.小,大 C.大,小D.大,大 6.不属于工程项目组织设计的基本原则的是哪一项?(D) A.责权利平衡B.适用性和灵活性原则 C.减少管理层次,组织扁平化D.职能部门和项目部门边界模糊化 7.2004年已经建成某40万吨的加工厂,实际投资额为4000万元,2010年拟建100万吨产能的类似加工厂,根据生产能力估算法,估算投资额最接近哪一项?(年综合价格调整系数为1.05,生产能力指数0.8(B) A.10000万元B.11157万元C.8741万元D.13400万元 8.对项目控制点的说法,正确的是哪一项?(B)C A.为了便于有效地控制和检查,对各种控制对象都要设置一个控制点。 B.控制点必须设置在重要的里程碑事件上 C.控制点要求最能反映项目的目标 D.控制点可以同时控制项目的时间、成本、质量 9.下面可以用来赶工的措施,那一项会加剧资源供应?(A) A.增加资源投入B.重新分配资源 C.修整资源分配图D.减少必要的环节 10.哪一项是招标方和投标人的第一次互相选择。(A) A.招标公告B.现场踏勘 C.资格预审D.出售标书 11.在实际工程中,实际合同价款按实际完成的工程量和承包商所报的单价计算,这种的合同类型是属于(A)A.单价合同B.总价合同 C.成本加酬金合同D.目标合同 12.对WBS的说法,不正确的是哪一项?C A.项目的范围可以通过WBS进行项目结构分解 B.WBS中包含了工作的编码、名称、范围定义等内容 C.工程系统自身的结构全部用WBS表示 D.WBS中每个项目单元以唯一的不重复的数字或字母标识,使它们互相区别 13.决定工程项目组织的主要因素是哪一项?(A) A.项目的资本结构、承发包模式和项目管理模式 B.项目的决策方式、项目经理的责权利分配 C.项目的实施流程和管理权限 D.项目的复杂程度和项目的专业化水平 14.对于项目组织和项目管理组织的比较,不正确的是哪一项?(D) A.从目标看,前者是项目的总目标,后者是项目的管理目标 B.从组织实施方式看,前者是专业型,后者是职能型 C.从任务分配方法看,前者是合同、任务书,后者是责任矩阵、管理规程 D.从组织流程看,前者是计划流程、合同流程等,后者是网络计划 15.我国常用的工程网络计划中,以箭线及其两端节点的编号表示工作的网络图称为哪一项?(A) A.双代号网络图 B. 单代号网络图 C. 双代号时标网络图 D. 单代号搭接网络图 16.挣值法的三个基本参数是哪一项?(D) A.BCWS,ACWP,BCWA B.ACWA,ACWP,BCWP C.ACWP,ACWS,BCWS D.ACWP,BCWP,BCWS 17.工程项目控制的特征是哪一项?(B)D A.柔性控制和长远控制B.现场控制和动态控制

浅谈我国工程项目管理的现状及发展趋势

浅谈我国工程项目管理的现状及发展趋势 浅谈我国工程项目管理的现状及发展趋势 摘要:本文通过工程项目管理模式的由来,引出工程项目管理的内涵、目的及任务,进而阐述我国工程项目管理的现状,并找出与国际化管理水平相比的几点不足之处,通过不足之处引发我国工程项目管理未来向国际化迈进的几点趋势,最后进行总结。 关键词:工程项目管理管理现状未来趋势 引言 国外工程项目管理模式起源于上个世纪五六十年代,对于项目管理模式存在两个大的研究体制,即欧洲体系(国际项目管理协会)和美国体系(美国项目管理体系)。而我国对于工程项目管理模式的研究和实践较晚,最早对工程项目管理的应用是“鲁布革水电站”工程的世行贷款项目,从此,揭开了我国工程向项目管理模式的序幕。国家计委在1987年推行相关文件,文件要求我国建设单位借鉴“鲁布革”经验,实行工程建设管理模式。92年建设部正式成立了工程项目管理委员会,标志着我国工程项目管理模式的又一进步。99年交通部的《公路施工项目管理手册》一书正式出版,为我国的建设工程社工提供了可靠地依据。2002年5月1日,由国家建设部、国家质量监督检验检疫总局联合出版的《建设项目管理规范》实施,该规范将我国的工程项目管理模式推向了规范化、信息化、科学化和系统化[1]。 1、工程项目管理的内涵、目的和任务 工程项目管理是项目管理的一类,其管理的对象主要是建设工程。工程项目管理的内涵是:自项目开始至项目完成,通过项目策划和项目控制,以使项目的费用目标、进度目标和质量目标得以实现。 工程项目管理的目的就是在保证质量的前提下,加快施工速度,降低工程造价。 工程项目管理的主要任务是安全管理、投资控制、进度控制、质量控制、合同管理、信息管理、组织和协调。其中安全管理是项目管

工程项目管理毕业论文

建筑工程项目成本管理对策研究 专业项目管理 准考证号010********* 姓名陆亨 指导教师郑荣

摘要 自上世纪80年代初我国开始引进工程项目管理这一概念来,随着我国经济的持续、快速发展,工程项目管理被提到了重要位置,但在成本管理体制上仍存在着各种原因造成的成本浪费等的问题。怎样通过对工程项目成本进行有效的组织、实施和控制而达到强化经营管理,完善成本管理制度,提高成本核算水平,降低工程成本,实现目标利润,创造良好经济效益的目的是企业生存和发展的基础和核心。 项目成本管理工作是项目管理的重要内容,关系着每个项目的经济效益,对企业的生存发展起着至关重要的作用。因此,有效控制成本显得极为重要,加强项目成本意识,以利提高企业的竞争力。 关键词:工程项目成本管理成本分析成本控制

目录 第一章:工程项目管理的相关理论 (1) 1.1 建筑工程项目成本概述 (1) 1.1.1建筑产品概念 (1) 1.1.2建筑工程项目成本概念 (1) 1.1.3建筑工程行业的特点 (1) 1.2 工程项目成本管理与控制的原则 (1) 1.2.1项目成本最低化原则 (2) 1.2.2项目成本全面成本控制原则 (2) 1.2.3项目成本动态控制原则 (2) 1.2.4项目成本目标管理原则 (2) 1.2.5责、权、利相结合的原则 (2) 1.3 建筑工程项目成本的构成 (2) 1.3.1项目决策成本 (2) 1.3.2项目设计成本 (3) 1.3.3项目采购成本 (3) 1.3.4项目施工成本 (3) 1.4 工程项目成本管理与控制中存在的主要问题 (3) 1.4.1忽视工程项目“质量成本”的管理和控制 (3) 1.4.2忽视工程项目“工期成本”的管理和控制 (3)

工程项目管理卷自考复习题.doc

《工程项目管理》自考复习题 第一部分:自学辅导材料(内部使用)思考题重点 一、名词解释:第2、8、11、12、13、19、20、30、38 题; 二、填空题:第2、5、10、11、13、15、18、20、23、24、28、34、41、43、44、45、47 题; 三、单选题:第2、3、4、6、7、10、13、14、30 题; 四、简答题:第I、7、15、16、19、22、23、25、39、49、50、52、53、70、72、78 题; 五、论述题:第8、12、15、16、17、21、22、27、28、32、35 题。 第二部分:教材复习思考题重点 (指定教材:成虎著,《工程项目管理》第三版,中国建筑工业出版社,2009年) P58:第2题(同第二版P41第2题) P101:第4题(见第二版P79第6题); Pill:第4题(见第二版P92第4题); P126:第5题(见第二版P106第3题); P166:第10、13题(见第二版P146第11、16题);P208:第10题(见第二版P182第10题)[参见P150 例题(同第二版P128例题);该3题单代号、双代号网络图的绘制及其时间参数计算。] P234:第3题(见第二版P203第2、3题); P252:第2、3、4题(见第二版P218第2、3、5题)[参见P243例题(同第二版P211例题)]; P307:第5题(见第二版P250第5题); P326:第1、4题(见第二版P266第1、4题); P349:第6题(见第二版P283第3题); 第三部分补充复习思考题 一、单选题 1.项目管理的国际化趋势在全世界越来越明显,丁?程项目管理的国际惯例通常不包括 A.推行工程可行性研究 B.推行工程招标投标 C.推行FIDIC合同条件 D.推行代建制模式 2.PMBOK的概念是由哪个组织提出? A.美国项日管理协会 B.中国项日管理协会 C.国际项H管理协会 D.国际T程师联合会 3.以下不是工稈项目组织特征的是 A.临时性 B.柔性 C.弹性 D.稳定性 4.2001年我国颁布了哪项国家标准,对促进我国建设T程项H管理科学化、规范化和法制化具有重大作 用? A.T业可行性研究编制手册 B.工稈网络计划技术规稈

工程项目管理复习题自考

工程项目管理 一、单项选择题 1.项目建成后,负责编制工程竣工决算报告的单位是 A.项目法人B.设计单位 C.监理公司D.造价咨询机构 2.承包人向工程师递交索赔意向通知,是在索赔事件发生后 A.7天内B.14天内 C.28天内D.35天内 3.建设工程的价值主要形成的时间阶段是 A.决策B.可行性研究 C.设计D.施工 4.在可行性研究报告被批准后, A.组成项目法人筹备组B.提出项目法人的组建方案C.正式设立项目法人D.成立项目法人过渡机构5.在评标工作中,评标委员会的成员应为 A.5人以上的单数B.5人以上的双数 C.7人以上的单数D.7人以上的双数 6.风险事件级别评定的影响因素是 A.风险发生的概率B.风险损失量 C.风险发生的概率和风险损失量D.风险评估的方法 7.关于投标有效期,下列说法正确的是 A.一旦确定,不可延长B.在招标文件中规定 C.起算时间为提交投标文件的时间D.由招标和投标单位共同确定8.按实施过程对项目结构进行分解时,对分解结果有影响的是项目的A.生产体系B.生产功能 C.专业要素D.任务范围 9.在建设工程合同中,解决合同争议最常见也最有效的方式是 A.诉讼B.争端裁决委员会 C.协商D.政府出面协调 10.针对特种作业、特种设备、特殊场所进行的检查属于 A.全面检查B.局部检查 C.专业性检查D.不定期检查 11.中标通知书发出之日起30日内,

A.招标人与中标人订立书面合同B.招标人退还投标保证金 C.中标人提供履约担保D.招标人提供支付担保 12.需要编制建设项目总概算的设计阶段是指 A.方案设计B.初步设计 C.技术设计D.施工图设计 13.轮班制生产方式的工作分类方法是按 A.临时性工作归类B.简单数量进行归类 C.职能进行归类D.时间进行归类 14.承包商不承担任何价格变化或工程量变化的风险,这种合同方式是A.可调价总价合同B.固定价总价合同 C.可调价单价合同D.成本加酬金合同 15.对于风险的理解,下列说法正确的是 A.风险是可以消除的B.事件是风险的要素之一 C.风险越大,损失越多D.风险对不同主体的影响是相同的16.整个策划活动解决问题、取得效果的必要前提是准确地设定项目的A.效益B.范围 C.目标D.系统构成 17.建设单位组织开工的时间为领取施工许可证之日起 A.七天内B.三十天内 C.一个月内D.三个月内 18.施工方对项目进行进度控制的依据是 A.施工任务委托合同B.监理规划 C.施工任务单D.业主的进度计划 19.安全生产制度中最基本、最核心的制度是 A.安全生产检查制度B.安全生产例会制度 C.安全生产责任制D.安全事故责任追究制度 20.项目质量管理的主要对象是 A.工程实体B.工程设计 C.服务能力D.工程规划 21.负责主持编制项目质量计划的是 A.总工程师B.项目经理 C.技术负责人D.质量负责人 22.风险识别和管理之间的纽带是 A.风险分析和评价B.风险控制 C.风险分类D.风险对策

工程项目管理试题及答案题库

工程项目管理试题及答案-题库-自考用 单项选择题 1、施工质量计划的编制主体是( C )。 A、业主 B、设计方 C、施工承包企业 D、监理单位 2、在工程的网络计划中,工作的自由时差是指在不影响( A )的前提下,该 工作可以利用的机动时间。 A、紧后工作的最早开始时间 B、紧后工作的最迟开始时间 C、紧后工作的最迟完成时间 D、本工作的完成时间 3、下列关于工程项目目标的说法中,正确的是( D )。 A、目标应是长远和抽象的 B、目标不应有时间限制 C、目标只能由最高决策者掌握 D、目标是现实的,是可达到的 4、下列关于业主对工程项目管理的表述中,正确的是( B )。 A、管理目的是实现项目各利害关系人的全部期望 B、业主是对工程项目进行全面管理的中心 C、在项目建设过程中,业主对项目大都采用直接管理方式

D、以进度为中心进行控制 5、按照( A )方式,可将项目管理划分为不同的类型,包括业主方的项目管 理、施工方的项目管理等等。 A、建设工程项目不同参与方的工作性质和组织特征的不同 B、建设工程项目不同参与方的权利和责任的不同 C、建设工程项目不同参与方的利益的不同 D、建设工程项目不同参与方的地位的不同 6、专业工作队在各个施工段上的劳动量要大致相等,其相差幅度不宜超过 ( B ); A、8%~12% B、10%~15% C、18%~25% D、25%~35% 7、工程项目的管理层次与管理跨度之间的关系为( D )。 A、跨度越小层次越少 B、层次减少跨度不变 C、跨度越大层次越大 D、层次越多跨度越小 8、建设工程项目管理的核心任务是项目的( D ) 。 A、目标规划 B、目标比选 C、目标论证 D、目标控制 9、以下哪个不属于施工索赔种类的有( D )。 A、工程量变化索赔 B、施工条件变化索赔 C、设备窝工索赔 D、工人工伤索赔

工程建设项目管理论文

工程建设项目管理论文 篇一:工程建设项目管理论文浅谈对工程建设项目管理的质量、进度、费用管理[摘要] 项目的质量、进度、费用是建设项目管理的主要内容,本片论文简要介绍了进度、费用、质量相互之间的对立统一关系,对进度管理、费用管理、质量管理的控制措施进行了详细的阐述。[关键词]进度管理费用管理(成本控制)质量管理浅谈对工程建设项目管理的质量、进度、费用管理建设项目管理作为一种管理活动,其历史源远流长,自从人类开始进行有组织的活动,就一直在执行着各种规模的项目。在古代,人们就进行了许多项目管理方面的实践活动如我国的长城、埃及金字塔、古罗马的供水渠等这样不朽的伟大工程都是历史上古人运作大型项目的范例。20世纪四五十年代,由于第二次世界大战的推动,项目管理主要应用于国防和竣工项目,美国把研制第一颗原子弹的任务作为一个项目来管理,命名为“曼哈顿计划”。20世纪50年代后期到60年代,美国出现了关键线路法(CPM)和计划评审制度(PERT),20世纪70年代,项目管理再新产品开发领域中扩展到了中小企业,20 世纪90年代以后,随着信息时代的到来,项目管理业逐步应用到项目的管理中。项目管理是通过项目经理和项目组织的努力,运用系统理论和方法对项目及其资源进行计划、组织、协调、控制,旨在实现项目的特定目标的管理方法体系。发展到现在项目管理已经变成了一种系统做事的方法。工程领域的大量实践活动也极大地推动了项目管理的发展,随着社会进步和现代科技的发展,项目管理不断得以完善,同时项目管理的应用领域也不断扩充。但在此同时项目管理给传统管理模式带来了变革和挑战,得到了前所未有的认可,并得以持续的发展和应用。实施有效的工程建设项目管理,并更好地把各种专业服务融为一体已经成为现代发展的需要。建设项目管理涉及到十二个知识领

工程造价项目管理毕业设计论文

工程造价项目管理毕业设计论文 建筑工程项目管理毕业论文 学院: 辽宁信息职业技术学院 专业班级: 工程造价G112 学号: 11 学生姓名: 刘亮亮 指导教师: XX 摘要 随着建筑行业竞争日趋激烈、建筑市场推行无标底招投标,企业能否在市场竞争中立于不败之地,关键在于企业能否为业主提供质量高、工期短、造价低的 建筑产品;而企业能否获得较大的经济效益,关键在于有无低廉的成本。因此, 建筑施工企业在项目施工中要以尽量少的人、机、材消耗创造较大的价值。通过 施工过程中的成本控制与管理,及竣工决算达到以收抵支,并有所盈利,这正是 施工企业所追求的目标。 关键词:项目成本控制,成本管理,建筑工程,工程技术,工程安全 Abstract Along with the increasingly fierce competition in construction industry to implement without base price bidding, the construction market, companies can in market competition, the key is whether

companies will be for the owners to provide high quality, short construction period and low cost of construction products; Companies access to greater economic efficiency, the key lies in the presence of low cost. Therefore, the construction enterprises with less as far as possible in the project construction, machine, material consumption, to create greater value. Through the construction process of cost control and management, and the date of completion final accounts to arrive, and profit, it is construction enterprise goal. Keywords: project cost control, cost control, architectural engineering, engineering technology, engineering safety 目录 提要 - 5 - 第一章、加强成本控制 - 6 - 第二章、工程项目成本管理的控制的过程 - 7 - 2.1成本最低化原则 - 7 - 2.2全面成本控制原则 - 7 - 2.3目标管理原则 - 8 - - 8 2.4责、权、利相结合的原则 - 第三章、工程项目内部成本控制主要内容 - 8 - 3.1项目部是成本控制中心,其成本核算对象是项目部的各个单项工程 成本 - 8 -

工程项目管理自考复习资料

工程项目管理 第一章 项目的定义:具有独特的过程,有开始和结束日期,有一系列相互协调和受控的活动组成。过程的实施是为了达到规定的目标,包括满足时间、费用和资源等约束条件。 项目的特性:1、一次性(单件性);2、目标性;3、约束性;4、寿命周期性;5、多活动性。 项目的特点:1、目的性;2、寿命周期性;3、依赖性;4、独特性;5、冲突性。 工程项目的概念:需要一定的投资,经过策划、设计和施工等一系列活动,在一定的资源约束条件下,以形成固定资产为确定目标的一次性活动。 工程项目的基本特征:1、工程项目的一次性;2、工程项目的目标性;3、工程项目的约束性;4、工程项目的寿命周期性;5、工程项目由活动构成。 工程项目的其他特征:1、投资大;2、建设周期长;3、不确定性因素多、风险大;4、参与人员多。 工程项目的类型:1、根据不同功能划分:1)住宅建筑;2)公共性建筑;3)工业建筑;4)基础设施。2、根据任务不同划分:1)工程项目(包括使用至报废);2)工程承包项目;3)工程勘察设计项目;4)工程监理项目。 工程项目的组成:1、单项工程;2、单位工程;3、分部工程;4、分项工程。 项目管理的概念:以工程项目为对象,在既定的约定条件下,为最优地实现工程项目目标,根据工程项目目标、工程项目的内在规律,对从项目构思到项目完成的全过程进行的计划、组织、协调和控制,以确保该工程项目在允许的费用和要求的质量标准下按期完成。 目标体系:质量目标,工期目标,费用目标。关系:对立与统一的关系,是不可分割的整体,是一个系统。 工程项目建设程序:项目决策阶段---项目设计阶段---建设准备阶段---施工和动用前准备---竣工验收阶段 业主方对工程项目的管理:业主方负责从可行性研究开始直到工程竣工交付使用的全过程管理,是整个工程项目管理的中心。五个职能:1、决策职能;2、计划职能;3、组织职能;4、协调职能;5、控制职能。 政府对工程项目的管理:政府对工程项目的管理是指政府有关部门对工程项目进行的监督和管理,以相关的法律为依据,由有关的政府机构来执行强制性监督与管理。九个方面:1、建设用地管理;2、建设规划管理;3、环境保护管理;4、建筑防火管理;5、建筑防灾管理;6、有关技术标准、技术规范执行情况的审核;7、建设程序管理;8、施工中的安全、卫生管理;9、建成后的使用许可管理。 施工项目管理:施工单位通过工程施工投标取得工程施工任务,以施工合同为依据,组织项目管理,成为施工项目管理。 施工项目管理的特征:1、施工项目是主要的管理对象;2、施工阶段管理的内容随着施工阶段的不同而不同;3、施工项目管理的首要任务是施工现场的管理。 工程建设监理:针对工程项目建设,业主委托和授权社会化、专业化的工程建设监理单位,根据国家批准的工程项目建设文件,有关工程建设的法律、法规和工程建设监理合同以及其他工程建设合同所进行的旨在实现投资目的的围观监督管理活动。 工程建设监理的性质:1、服务型;2、独立性;3、公正性;4、科学性。 工程建设监理的范围:1、国家重点建设工程;2、大中型公用事业工程;3、成片开发建设的住宅小区工程;4、利用外国政府或者国际组织贷款、援助资金的工程;5、国家规定实行监理的其他工程。 监理单位与业主、承包商的关系:业主与监理单位经平等协商签订了监理合同,就确定了连着之间是委托与被委托、授权与被授权的关系。监理合同对监理人员的数量、素质、服务范围、服务时间和服务费用等作出详细规定,同时也明确了业主授予监理工程师的权力。

毕业设计_浅谈工程项目管理中的风险管理论文

项目管理期末大作业浅谈工程项目管理中的风险管理

摘要 当前,中国现代化建设中各类风险事件时有发生,提升项目风险管理水平已成为中国工程建设行业面临的重要课题,并且需要项目参与各合作管理共同风险。鉴于伙伴关系模式能最大程度地整合资源,有助于相关组织的革新、学习和提高效率,创建了基于伙伴关系模式的项目风险管理模型。该模型系统地描述了伙伴关系应如何组织风险管理体系以及项目风险管理和评价与激励之间的紧密结合,使项目参与各组织通过资源最优化配置提升项目风险管理水平。并针对国内企业在工程项目管理方面存在的问题以及体制上存在的不足提出了一些较具体的建议。即:建构项目管理学科的培训内容;促进项目管理软件的开发与应用;建立科学的工程项目管理体系;重视工程项目的风险;抓紧培养人才,培育一批工程总承包和工程项目管理企业等。 关键词:工程项目;风险管理;管理;风险管理;风险计划 目录

1.引言.................................................................................................................. (3) 2.绪论........................................................................................................................ - 5 - 2.1工程项目风险管理研究意义..................................................................... - 5 - 2.2 国内外发展状况........................................................................................ - 6 - 3.工程项目管理中风险管理.................................................................................... - 7 - 3.1 工程项目管理风险管理概述.................................................................... - 7 - 3.1.1工程项目风险管理概述.................................................................. - 7 - 3.1.2风险管理中的问题.......................................................................... - 8 - 3.2 风险管理的基本过程................................................................................ - 9 - 4. 工程项目风险的分析........................................................................................ - 12 - 4.1 工程项目风险的定义.............................................................................. - 12 - 4.2 成本控制风险影响因素分析.................................................................. - 12 - 5.工程项目风险管理中成本管理.......................................................................... - 14 - 5..1 工程项目成本管理................................................................................. - 14 - 5.2 项目成本管理系统.................................................................................. - 14 - 5.3工程项目成本管理的具体措施............................................................... - 15 - 5.3.1提高项目人员的整体素质和责任感............................................ - 15 - 5.3.2力度于项目成本核算管理和监督................................................ - 16 - 5.3.3深入成本预测预控和经济合同的履行........................................ - 16 - 5.3.4劳务分承包商的使用和激励的关键性........................................ - 16 - 5.3.5加在力度抓好材料管理................................................................ - 17 - 6.项目风险识别的技术与工具 ............................................................................. - 17 - 6.1 检查表 ...................................................................................................... - 17 - 6.2流程图 ...................................................................................................... - 18 - 7.工程项目风险管理方法实际运用...................................................................... - 18 - 7.1 成本超支和工期延误风险的管理.......................................................... - 18 - 7.2某公司实施伊朗大坝项目的案例分析................................................... - 19 - 8.结论...................................................................................................................... - 22 - 参考文献................................................................................................................. - 23 -

2021年工程项目管理自考模拟试卷

注意事项①出卷时,试卷之间应留答题空格,且笔迹工整。 ②考试时,请勿将试卷摊开。 一、单项选取题(共20题,每题1.5分。每题备选项中,只有1个最符合题意) 1、在任何状况下工程项目建设周期都是有限,这是工程项目()特性A.唯一性B.一次性C.整体性D.不可逆转性 2、项目所有者涉及两个层次() A.市政和业主B.公司和业主C.市政府和公司D.投资者和业主 3、弱矩陈式、强矩阵式和平衡矩阵式三种项目管理组织形式重要区别在于() A.参加项目团队B.项目管理人员水平高低C.项目规模大小D.项目经理权限大小 4、可以描述为业主—项目管理公司—承包商组织关系项目组织形式是()A.直线型B.矩阵型C.寄生式D.独立式 5、在项目实行阶段,应协调解决施工现场关于文物保护工作,并承担相应费用是() A.承包人B.业主C.征询工程师D.政府职能部门 6、同一条工程项目信息,不同人有不同理解,这属于沟通中() A.认知障碍B.情感障碍C.偏见障碍D.个性障碍 7、工期压缩普通不在()状况下发生 A.有时间限制B.实际中存在工期迟延C.规定提前竣工D.农忙工人回家 8、恰当项目范畴()是成功实行工程项目核心 A.定义B.变更C.控制D.确认 专业班级 准考证号 封 学号 姓名 线 第1页,共6页

第2 页,共6页

第3页,共6页 、在项目组织基本形式中业主是战略管理层,则设计单位是层。 6、项目经理普通需要掌握知识重要涉及项目所在领域有关专业知识、普通管 理知识和。 7、双代号网络图中箭线表达工程活动,箭线上表达工作名称,箭线下表 达。 8、在工期筹划中,由构成线路叫做核心线路。 9、某墙面分项工程中,人工费为5万元,材料耗费了8万元,此外运用有关 机构设备耗费了2万元,则该分项工程直接工程费为。 10、项目中沟通方式按照组织层次可觉得垂直沟通、横向沟通和。 四、名词解释(共5题,每题1分) 1、WBS 2、BROT 3、 EPC 4、BCWS 5、CV 密 封 线 第4页,共6页 4、试分析也许导致成本超支因素 5、简述普通面对工程风险方略 密 专业班级 准考证号 封 学号 姓名 线 第5页,共6页

自考工程项目管理重点知识点

第一章绪论 工程项目管理:是系统工程的观点、理论和方法,对工程进行全过程和全方位的管理 第二章工程项目管理基础 项目:在特定的组织机构内、在限定的资源条件、期限内完成的、具有一定质量和数量要求的、一次性的专门任务。 项目的特征:1)相对性 2)临时性 3)一次性 4)目标性 5)寿命周期性 6)约束性 7)系统性和整体性 建设工程项目:为完成依法立项的新建、扩建、改建等各类工程而进行的、有起止日期的、达到规定要求的一组相互关联的受控活动组成的特定过程,包括策划、勘察、采购、施工、试运行、竣工验收和考核评价等,称建设工程项目 建设工程项目的特征:1)投资大 2)周期长 3)不确定因素多,风险大 4)项目参与人员多 5)工程项目的管理及其重要 建设工程项目分类: 1.按建设性质分类(基本建设、更新改造)其中基本建设包括新建项目、扩建项目、迁建项目和恢复项目;更新改造工程包 括挖潜工程、节能工程、安全工程、环境工程 2.按投资作用分类(生产性建设工程、非生产性建设工程) 3.按专业分类(建筑工程、土木工程、线路管道安装工程、装修工程)建筑工程产出物为房屋工程;土木工程产出物为公路、 铁路、桥梁、隧道、水坝、电站等;线路管道安装工程产出物为安装完成的送变电、通信等线路,给排水,化工等管道,燃气及石油管道,机械、点起、交通等设备;装修工程项目指构成装修产品的抹灰、油漆等 4.按项目规模分类(大型、中型、小型)按投资限额划分的基本建设项目:属于工业性项目中的能源、交通、原材料部门的 工程项目,投资额达5000万元以上为大中型项目,其他部门和非工业建设项目,投资额3000万元以上为大中型项目; 更新生产能力或使用效益划分的建设项目:5000万元以上(含5000万元) 的能源、交通、原材料工业项目,及3000万元以上(含3000万元)的其他项目为限额以上项目;其他为限额以下项目 5.按项目的效益和市场需求分类(竞争性项目、基础性项目、公益性项目) 项目管理:运用系统理论和方法,对建设工程项目进行的计划、组织、指挥、协调和控制等专业化活动,以实现项目全过程的动态管理和项目的综合协调与优化 建设工程项目管理:通过管理者的努力,运用系统工程的观点、理论和方法对建设工程项目寿命周期内的所有工作及其资源进行决策、计划、组织、协调和总结评价,以达到保证工程质量、加快工程进度、提高投资效益的目的 建设工程管理的职能:1)决策职能 2)计划职能 3)组织职能 4)控制职能 5)协调职能 工程项目寿命周期阶段:决策阶段、设计阶段、施工阶段、动用前准备阶段、保修阶段 申请施工许可证条件:(1)已经办理该建设工程用地的批准手续 (2)在城市规划区的建设工程,已经取得建设工程规划许可证(3)需要拆迁的,其拆迁进度符合施工要求(4)已经确定施工单位(5)有满足施工需要的施工图纸和技术资料(6)有保证工程质量和安全的具体措施 (7)建设资金已经落实 (8)法律、法规规定的其他条件 第三章工程项目管理体制 平行承发包模式:业主将整个工程项目按子项工程或专业工程分期分批,以公开或邀请的招标的方式,分别直接发给承包商,每一子项工程或专业工程均有发包合同 承发包模式特点:(1)施工合同多,业主协调管理工作量大(2)利用竞争机制降低合同价(3)可以缩短建设周期(4)设计变更多施工总承包模式:施工总包是一种国际上最早出现,也是最广泛的工程项目承包方式。它是由业主、监理、总承包商三个经济上独立的单位共同来完成工程的建设任务 施工总承包模式特点:(1)施工合同单一 (2)建设周期长 (3)设计与施工脱节,设计变更多 (4)对设计深度要求较高 项目总承包模式:(1)减少业主面对的承包商数量 (2)降低管理费用,信息沟通更快捷、不失真,有利于现场管理,缩短工期(3)项目的责任体系是完备的 (4)业主必须加强对承包商的宏观控制,选择资信好、实力强、适应全方位工作的承包商 联营体:为一项工程而结合的伙伴型组织,联营体随着项目的招投标开始而组件,随项目竞争中标、承包实施、交工验收、工程决算的完成而结束 联营体承包模式:由一个国籍或不同国籍的两家或两家以上具有法人资格的承包商以协议方式组成联营体,以联营体名义,

工程项目管理论文

【下载本文档,可以自由复制内容或自由编辑修改内容,更多精彩文章,期待你的好评和关注,我将一如既往为您服务】 工程建设设计阶段的造价控制 摘要 我国的工程建设程序可划分为六个阶段:即顶目建议书阶段,可行性研究阶段、设计文件阶段、建设准备阶段、建设实施阶段、竣工验收阶段。其中的设计文件阶段就是指工程设计阶段(它分为初步设计和技术设计两个阶段),工程设计就是指对建设工程实施的计划和安排,决定建设工程的轮廓与功能,从我国的建设程序看,工程设计阶段在整个工程建设中起到承上启下的作用,一个工程将来能否达到既安全,又满足功能要求,能否取得最佳经济效益,在设计阶段就己经定型了。通常我们只重视施工阶段的造价控制,而忽略其它阶段的造价控制,是很片面的。建设项目的造价控制贯穿于项目建设的整个过程,包括投资决策、设计、施工、竣工决算等阶段,每个阶段对建设项目造价影响程度各不相同。据统计,投资决策阶段占75%~95%;设计阶段占35%~75%;施工阶段占5%~35%;竣工决算阶段占0~5%,由此可见,工程造价控制的重点应放在对投资影响最大的前期投资决策和设计阶段,在项目作出投资决策后,控制工程造价的关键在于设计阶段。本文将对设计阶段的内容及设计阶段造价的控制进行详细介绍,并通过实际案例进行说明。 关键词:设计阶段;造价控制;控制措施 第1章建设工程的设计阶段划分及主要内容 1.1设计阶段的划分 一个工程设计阶段的划分一般要根据工程规模的大小、技术的复杂程度以及是否有设计经验来决定。正常情况下一般分为三个阶段、两个阶段、一次完成设计等三种情况。 凡是重大的工程项目,技术要求严格、工艺流程复杂、设计有往往缺乏经验的情况下,为了保证设计质量,设计过程一般分为三个阶段来完成,即:初步设计、技术设计和施工图设计三个阶段。 技术成熟的中小型工程,为了简化设计步骤,缩短设计时间,可以分为两个阶段进行,两个阶段设计又分为两种情况,一种情况是分为技术设计和施工图设计两个阶段,另一种情况是将初步设计和技术设计合并为扩大初步设计和施工图设计来年各个阶段。 技术既简单有成熟的小型工程或个别生产车间可以一次完成设计。 1.2各设计阶段主要内容 1.2.1方案设计 方案设计(概念设计)是投资决策之后,由咨询单位将可行性研究提出意见和问题,经与业主协商认可后提出的具体开展建设的设计文件、其深度应当满足编制初步设计文件和控制概算的需要。 1.2.2初步设计 初步设计(基础设计)的内容依项目的类型不同而有所变化,一般来说,它是项目的宏观设计、即项目的总体设计、布局设计、主要的工艺流程、设备的选型和安装设计、土建工程量及费用的估算等。初步设计文件应当满足编制施工招标文件、主要设备材料订货和编制施工图设计文件的需要,是下一阶段施工图设计的基础。 初步设计的深度应满足以下要求:设计方案的选择和确定;主要设备、材料订货;土地征用;基本建设投资控制。 1.2.3施工图设计 施工图设计(详细设计)的主要内容是根据批准的初步设计,绘制出正确、完整和尽可

广东省自学考试06087工程项目管理课程考试大纲汇编

广东省高等教育自学考试 《工程项目管理》(课程代码:06087)课程考试大纲 目录 一、课程性质与设置目的 二、课程内容和考核目标 第1章工程项目管理概论 1.1项目 1.2工程项目 1.3工程项目管理 1.4工程项目管理的原则与模式 1.5工程项目管理的发展趋势 第2章工程项目的组织管理 2.1工程项目组织管理概述 2.2工程项目的组织结构 2.3工程项目经理 第3章工程项目前期决策管理 3.1工程项目前期策划 3.2工程项目建议书 3.3工程项目可行性研究 3.4工程项目管理规划 第4章工程项目目标控制 4.1工程项目进度控制 4.2工程项目成本控制 4.3工程项目质量控制 第5章工程项目合同管理 5.1工程项目合同管理概述 5.2工程项目施工合同订立与管理 5.3工程项目施工索赔管理 5.4FIDIC合同条件下的施工管理 第6章工程项目生产要素管理 6.1工程项目生产要素管理概述

6.2工程项目人力资源管理 6.3工程项目材料管理 6.4工程项目机械设备管理 6.5工程项目技术管理 6.6工程项目资金管理 第7章工程项目风险管理 7.1工程项目风险管理概述 7.2工程项目风险识别 7.3工程项目风险评估 7.4风险应对与监控 第8章工程项目职业健康、安全与环境管理8.1工程项目职业健康安全与环境管理 8.2工程项目安全生产管理 8.3工程项目环境管理 第9章工程项目信息管理 9.1概述 9.2工程项目管理信息系统 9.3工程项目技术文件档案管理 9.4项目管理软件 第10章工程项目后期管理 10.1工程项目竣工验收 10.2工程项目竣工结算 10.3工程项目产品回访与保修 10.4工程项目考核评价 三、关于大纲的说明与考核实施要求 附录:题型举例

相关文档