Project Information

Proposal Number:AP08-R310-157

Purchase Order Number:FE09A0088FS

User Name:Jinjiang Group

User Address:Changshu

Contract Ship Date (Final Package):2010-4-2

Revision Date:0

Select Scope Options

1Unit scope

2Control panel scope

1.)Select motor option

3Motor manufacturer

4Motor horsepower2000 5Driver service factor

6Frequency

7Motor voltage

8Motor enclosure

9Space heaters

10Split sleeve bearings

11Reduced voltage starting

12Motor bearing and stator detection

13Low noise kit

14Special motor details

2.)Select starter option

15Motor starter

16Auxiliary oil pump voltage

3.)Select control panel options

17Control panel model

18Control panel display

19Control display units

20Control panel language

21Conmmunications package

22Ethernet option

23Teleservice modem package

24Sequencer module

25Filter monitoring package

26Auto start/auto dual package

27Air sensing package

28Interstage sensing package

29Remote alarm package

302nd high speed vibration

31Remote start and stop package

32Motor temperature monitor package

33Convernience package

34Cooling water solenoid signal

35User input package 1

36User input package 2

37Panel heater package

38Panel cooling package

39CSA Stamp(for units installed in canada) 40Ce panel compliance

41Nema 4x panel enclosure

4.)Select unit option and accessories

42Intercooler material

43Phenolic intercooler fin coating

44Intercooler construction code

45Interstage drainage system

46Oil cooler

47Oil filter

48Oil heater(includes level switch)

49Sound enclosure

50Intergral aftercooler

51Inlet air filter

52Water manifold

53Cooling water solenoid valve

54Unloading silencer

55Inlet expansion joint

56Discharge expansion joint

57Unloading expansion joint

58Mounted unloading valve

59Discharge check valve

60Jack pads

61Lubrication(oil type)

62Warranty

63Storage preparation

64Nameplate language

65Paint

67Five certified copies of test data

68Instruction book language

69Additional hardcopy instruction book

70Record set drawings

71Weekly status reports

72Kick off meeting

73Coc airend mechanical test

74Coc hydrotest

75Coc ls/hs rotor balance

76Coc materials chemical/physical testing

77Coc lube system

78Coc control panel functional test

79Coc motor test certificate

80Coc final inspection report

6.)Select spare parts to recommend

90Premium pares group

91Capital spares

92Control panel spares

7.)Specify any additional items to purchase

8桶润滑油