文档库 最新最全的文档下载
当前位置:文档库 › psw-part-submission-warrant-零件提交保证书

psw-part-submission-warrant-零件提交保证书

psw-part-submission-warrant-零件提交保证书

Part Number:零件料号:

Part Name:零件名称:

Date:日期:

Ok / X Ok / X OK /X

Declarations(声明):Signature:签核者:Title:职务:Phone #:电话:

Date:日期:

Email:邮箱:

SQE Signature:SQE 签核:Date:日期:Comments:注解:

Approve Conditional (A2)

条件批准(A2)

Result(结果)

I affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable drawings and specifications, and part submission meets all dimensional, material/mechanical/performance/reliability testing, appearance, and statistical requirements for each part feature /characteristic as defined on the design recordand,in the case of production samples, are made from specified materials on production intent tooling and equipment while being manufactured in production intent process flow. Any deviations have been declared below:

我保证此次提交的样品代表我们零件特性符合图纸和规格,并且所有的尺寸,材料,机械特性.可靠性测试,外观以及统计要求都符合零件的设计要求: 此次生产的样品,根据既定的工艺和使用指定的材料.加工工具和仪器生产.如有任何的差异声明如下:Declaration(声明)

Reject(R2)拒绝(R2)

Require(要求)Requested Elements and The Result (Check All That Apply - Should Compare To Producibility Review) 要求提交文件及结果

PART SUBMISSION WARRANT

零件提交保证书

Supplier Manufacturing Information 供应商信息:Contact Information 联系信息:

Require(要求)

Require(要求)Reason For Submission (Select All That Apply)提交原因Supplier Contact:

供应商联络人/电话/E-mail:

Address:供应商地址:

Supplier Code:供应商代码:

Sourcing Specialist:采购/电话/E-mail:

Supplier Quality Engineer:供应商质量工程师/电话/E-mail:

Approve (A1)批准(A1)

Approve (A1) = no issues; Reject (R2) = parts not useable, resubmit; Approve - Conditional (A2) =Running Change.

批准(A1)=没有问题;拒绝(R2)=零件不能用,重新提交;条件批准(A2)=边用边改变Customer Use Only(仅限客户填写)

Supplier Name:供应商名称:Initial Submission (New Part)Engineering Change(s)Correction of Discrepancy New or Modified Tools, Dies, Molds, Etc.Sub-Supplier or Material Source Change Change in Part Processing

Refurbishment - Existing Tooling Tooling / Equipment Transfer

Tooling Inactive > Than 1 Year

Parts Produced at Additional Location

Other - (Please Specify):

1.Warrant 3. Appearance Approval Report

2. Samples

4. Design Record (Drawing, Spec's)

5. Engineering Changes

6.Checking Aids

7. Dimensional Results / Layout 8. Material performance test result 10. Design FMEA

9. Process Flow Diagram 12. Control Plan

16.Other - (Please Specify):

11. Process FMEA (w/ Error-Proofing)14. MSA Studies 13. Process Capability Results 15. Packageing Plan

相关文档