轨道工程冬季施工方案

轨道工程冬季施工方案
轨道工程冬季施工方案

目录

目录

一.编制依据......................................................... - 0 -

二.工程概况......................................................... - 0 -

三.冬季施工工期及时间的确定 ......................................... - 1 -

四.冬季施工措施..................................................... - 1 -

五.作业准备......................................................... - 2 -

六.技术要求......................................................... - 2 -

七.施工工艺流程..................................................... - 3 -

八.质量控制技术措施 ................................................. - 3 -

九.施工要求......................................................... - 5 -

十.劳动力组织....................................................... - 6 -十一.材料要求....................................................... - 6 -十二.设备和机具..................................................... - 7 -十三.质量检测....................................................... - 7 -十四.安全及环保要求 ................................................. - 7 -

11

目录

通辽客专轨道工程(硫磺锚固)

冬季施工方案

一.编制依据

1.国家相关法律、法规和现行铁路施工规范规程、质量检验标准及验收规范等;

2.《铁路工程施工组织设计规范》(Q/CR9004-2015);

3.铁道第三勘察设计院关于新建通辽至新民北客运专线初步设计文件、指导性施工组织设计、图纸及说明书等文件;

4.国家、铁路总公司、地方政府有关安全、环境保护、水土保护的法律、规程、规则、条例;

5.集团公司针对本工程的项目策划书;

6.集团公司组织的本工程现场施工调查报告;

7.公司所拥有的人力、机械设备资源、施工管理水平、工法及科研成果及相关资料。

二.工程概况

本项目位于蒙东地区的通辽与辽宁省西部地区,线路自京沈客专新民北站引出,经彰武、甘旗卡,引入通辽站,线路全长196.934km,其中辽宁境内104.488km,内蒙境内92.446km。新建北京方向上、下行联络线共计12.208km,全部位于辽宁省范围内,TLSG-2标段轨道工程施工起止里程为DK633+125~DK194+325.36,正线铺新轨398.88km、站线铺新轨18.03km、道岔铺设66组。

由于辽宁地区、内蒙地区现场作业温度较低,特别是由于工期紧

- 0 -- 0 -

冬季混凝土路面施工方案

永年县农村道路网改造工程(一期工程)一般乡村公路6标段 冬 季 施 工 方 案 编制人 审批人 邢台市正阳建筑安装有限公司

目录 1.适用范围 (3) 2.施工准备 (3) 3.冬季施工措施 (5) 4.安全与防火措施 (7)

永年县农村道路网改造工程(一期工程)一般乡村公路6标段 混凝土路面冬季施工方案 一、适用范围 适用于现场浇筑混凝土路面施工。 二、施工准备 当室外日平均气温连续五昼夜低于5℃时,混凝土路面的施工应按冬期施工规定进行。 2.1 技术准备 1.认真审核设计图纸和设计说明书。 2.混凝土路面原材料已进行试验,并确定混凝土配合比。混凝土配合比满足混凝土的设计强度、耐磨、耐久和混凝土拌合物和易性的要求。 2.2 材料要求 1.水泥 (1)采用普通硅酸盐水泥,水泥强度等级为42.5MPa。 (2)水泥进场应有产品合格证和出厂检验报告,进场后应对强度、安定性及其他必要的性能指标进行取样复试。其质量必须符合国家现行标准《硅酸盐水泥、普通硅酸盐水泥》(GB 175)等的规定。 (3)对水泥质量有怀疑或出厂期超过3个月或受潮的水泥,必须经过试验,按其试验结果决定正常使用或降级使用。已经结块变质的水泥不得使用。不同品种的水泥不得混合使用。 2.骨料:冬季施工中对骨料除要求没有冰块雪团外,还要求清洁,级

配良好,质地坚硬,不应含有易受冻成分的矿物。所用骨料的储备地点应选择地势高不积水的地方。 3.外加剂:防冻剂的质量和应用技术应符合国家现行标准《混凝土外加剂》(GB 8076)和《混凝土外加剂应用技术规范》(GB 50119)的有关规定。 防冻剂应有产品说明书、出厂检验报告及合格证性能检测报告,进场后应取样复试,并应检验外加剂与水泥的适应性。有害物含量检测报告应由相应资质检测部门出具。 4.水:采用净水,即一般饮用的自来水及天然水,因其不含有导致延缓水泥正常凝结、硬化的杂质以及引起导致混凝土腐蚀的离子。 6.钢筋:混凝土路面所用的钢筋网、传力杆、拉杆等钢筋的品种、规格、级别、质量应符合设计要求,钢筋应顺直,不得有裂纹、断伤、刻痕、表面油污和锈蚀。钢筋进场应有产品合格证和出厂检验报告单,进场后应按规定抽取试件做力学性能检验,其质量必须符合有关标准的规定。 2.3 机具设备 1.搅拌、运输机具:配有自动控制系统的混凝土搅拌机站一套、自卸车、小翻斗车、手推车、混凝土搅拌运输车等。 2.振捣机具:平板振动器、插入式振动器、振捣梁等小型机具。 3.其他工具:混凝土切缝机、纹理制作机、灌缝机、普通水泵、移动式照明设备等。 4.抹面机具:电抹子、木抹子、铁抹子等。 5.施工测量和检验试验仪器设备。 2.4 作业条件

铁路工程轨道施工专项方案

铁路工程轨道施工专项方案 1概述 根据设计,本标段只有XX岭隧道(XX岭隧道出口段XX车站范围内采用有砟轨道)和XX隧道内施作弹性支承块式无砟道床,合计20114m。 隧道内弹性支承块道床结构高度为68cm,宽282cm。进出口洞外各设20m 过渡段,由有砟轨道过渡至弹性支承块式无砟轨道,过渡段采用重型有砟轨道,过渡段道床结构高度从洞内往洞口方向由68cm渐变至77cm。 无砟道床主要工程量如下:弹性支承块预制67061块,底座及道床板(C40砼)21542米,底座及道床板钢筋1470.356t,伸缩缝及沉降缝沥青木板19377m。 2施工方案 2.1弹性支承块预制方案 弹性支承块由支承块、块下橡胶垫板和橡胶套靴组成。支承块为C50钢筋砼结构。块下橡胶垫板放置在橡胶套靴之内支承块的下方,略小于支承块地面尺寸。橡胶套靴覆盖在支承块四周及底面。 支承块预制场地设在XX隧道出口位置附近,可以方便使用和节约运输费用,占地面积约5000m2,其中生产区搭设长40m、宽40m、高4.5m的厂房,厂房要求密封良好。厂房分四个区:砼搅拌区、砼振动成型区、蒸汽养护区及拆模区。材料库、钢筋加工区、养生、套靴组装及成品堆放区设在厂房外, 预制场地建设按照5个月考虑,2011年2月1日开始建厂,2011年6月30日建厂结束,2011年7月1日开始试生产,2011年8月1日开始正式生产,2012年7月31日预制工作全部结束。 预制工作按照每天1个循环进行安排。每月按照25天考虑,67061块弹性支承块预制12个月,共需投入模型224套,考虑一定的备用模型,模型共投入238套。 2.2弹性支承块无砟道床施工方案 弹性支承块无砟道床施工采用组合式轨道排架铺装和现场浇筑砼的方法进

安全施工专项施工方案

安全施工专项施工方案 施工单位:深圳市新宝通建设集团有限公司 工程地点: 项目部安全施工目标:不发生人身死亡事故(零死亡率),不发生重大施工机械设备损坏事故,不发生一般或重大火灾事故,不发生一般或重大垮(坍)塌事故。文明施工目标:为确保现场周围公共区域正常工作环境不受干扰,我项目部根据施工现场的特点编制一整套严格的施工作业管理措施。 1. 为加强现场管理,我项目部将全面负责现场的安全、保卫、消防、噪音、卫生环保、建筑垃圾清理、施工废水处理、暂住人口管理、计划生育等工作;并设有专职安全员、治安员、消防员,且落实到位; 2. 我项目部施工人员将持证上岗,管理人员和操作人员均挂牌施工,并严格遵守总包的各种管理制度,做到文明施工; 3. 项目部实行周度检查、月度检查,所有安全控制资料保证齐全; 4. 安全文明施工、环保措施符合有关部门颁发的法令及法规。 三.安全生产保证措施安全文明施工是工程按计划施工的前提条件,也是有关部门对施工企业的强制性要求。我项目部将按文件要求及总包的安全管理制度规定做好安全文明施工工作,并对容易发生施工安全事故的环节采取有力措施,保证施工安全一直处于受控状态。 具体措施如下: 1、安全技术交底和安全技术教育:根据我公司ISO9001国际质量体系、ISO14001环境保障体系及OHSAS18001职业健康体系文件,所有施工人员必须通过安全培训,考核合格才有资格上岗操作。所有操作者在开工前必须进行安全技术交底和安全技术教育。安全技术交底及安全技术教育应有相关的质量记录;特种作业人员需持证上岗,如架工、焊工、电工、机操工等。无相应证件作业者,一经发现,立即清除出施工现场,并对有关责任人员进行重罚;针对工程的特点,对进行较易发生安全问题的施工作业人员进行上岗前特别安全、技术交底,确保施工过程零事故率。 2、安全检查:切实落实施工安全规范,按照规范要求设置安全检查员,安全检

PHC管桩冬季施工方案

PHC管桩冬季施工方案 一、工程概况 工程名称:江苏华电句容煤炭储运工程。 工程地点:镇江市句容市华电路句容电厂内。 拟建镇江港高资港区江苏华电句容煤炭储运工程紧邻句容电厂,位于句容市北部,长江下游镇扬河段世业洲右汉口门的右岸、大道河口至虹桥口岸段。厂区地理坐标概位为119° 15’ E, 32° 12’ No厂区距句容约SOknir距镇江市约20knu 轨道基础下地基采JUeeOOPHC管桩(C型几桩顶标高4. SOm,桩底标高-31. 25in?33. 177m 不等。桩工程量约18000nb共480根,其中360根直桩.120根斜桩,斜桩斜率8:1。 拟建场地现状主要为空地,局部有施丄便道、堆上,除堆上外地势较平坦。中心地带日前已少量积水。 拟建场地位于江苏省镇江市句容市华电路属平原正常地带正常沉积地段,按地层沉积时代、成因类型及其物理力学性质指标的差异详见地勘报告。 桩端进入土层满足设计要求。 山于该工程合同工期紧,为满足业主的要求,不影响工期,必须在冬季困难能克服的悄况下需采取一定的措施,继续施工。 二.冬季施工的项目 PHC管桩的施工 三.PHC管桩冬季施工需解决的问题 PHC桩冬期施工过程中的焊接质量控制; 2、管桩桩机钢丝绳的养护: 3、机械设备的工作措施: 4、冬季施工人员的注意事项。 四、冬季施工注意事项 进入冬季施工阶段,也是安全生产事故高发阶段,施丄项U部必须高度巫视安全生产, 积极定期、定岗、定人检査施工现场存在的安全隐患,并及时消除隐患。 (一)PHC桩接头焊接的质量控制 1、PHC桩接头焊接过程中增大焊接电流,减低焊接速度; 2、桩焊口周围设置挡风圉挡; 3、当温度低于零下2摄氏度时,停止施丄。

铁路轨道工程施工组织设计

铁路轨道工程施工组织设计 轨道是铁路线路的上部建筑,铁路轨道施工是指在业已建成的先期工程如路基、桥涵和隧道等线下建筑物之上进行轨道铺设的工作。它包括铺轨和铺碴两项基本内容。 轨道工程实施性施工组织设计的编制,应在充分掌握线路设计文件中指导性施工组织设计的基础上,针对本单位施工的线路情况、轨道铺设起讫点里程和铺设长度、施工期限和施工进度等,并结合本单位具体条件,确定轨道铺设方案和施工方法,编制轨道铺设进度计划,制定出加快铺设进度,保证铺设质量、安全施工、降低施工成本,确保轨道工程如期完成的相应技术措施和组织管理措施。 轨道铺设工作按其基本内容和顺序分为准备工作、基本工作和整修工作等三个阶段。 一、轨道工程施工准备工作 认真做好施工准备是确保轨道铺设施工顺利进行的前期工作,准备工作包括:资料准备、施工调查和测设,施工前准备和编制施工组织设计。 1.1资料准备 ⑴施工技术资料的收集 工程施工单位事前应向有关单位收集施工资料:线路施工图设计文件和路基、桥隧等工程竣工资料。如:曲线表、断链表、桥梁表、隧道表、车站表、水准基点表、中线桩控制表、架桥岔线表、路基有无路拱地段表、陡坡地段表、整体道床地段表、宽枕铺设地段表、制动地段表、桥头路基填土夯实密度试验纪录、绝缘地点表、坡度表、设计高程表和路基检查证等。 ⑵审核和复制技术(施工)文件 按照《铁路轨道施工及验收规范》TB10302-96的要求,认真做好设计文件及施工技术资料的审核工作,查明铺轨起讫里程和工程数量,使施工资料正确可靠,避免造成返工浪费。在施工资料审核正确无误的前提下,

复制车站简图和正线施工缩图,整理施工技术文件,以供铺轨施工使用。 1.2施工调查和测设 1.2.1施工调查 施工调查使施工准备的关键,其主要内容有 ⑴考察并择定铺设基地设置方案,落实道碴采集场,并考虑采用的运输方案和道路系统。 ⑵落实所需水、电、材料及机具设备供应。 ⑶了解架梁河道概况,必要时提出临时通航及采用便桥通过方案。 ⑷了解平交道口附近地形、地貌和车辆通行情况,提出维持道路交通的临时措施。 ⑸调查站前工程完成情况,看其能否保证铺轨、铺碴、架梁工作的顺利进行。 ⑹检查路基整修情况 ⑺检查线路中线桩和临时标志埋设是否符合规定是否齐全,如有缺损应在铺轨前补齐。 ⑻检查界限情况,检查跨越路基的通讯和电力线路的高度及其他建筑物限界能否保证铺轨机、架桥机安全通过,否则必须在铺架机械到达前进行处理。 1.2.2施工测设 路基成型后,施工单位应进行线路复测,恢复线路中心线并钉设永久性中线桩,施工规范规定直线地段每隔25米,圆曲线地段每隔20米,缓和曲线每隔10米各设一桩;铺设钢筋混凝土宽枕地段,无论直线还是曲线,中线桩桩距均为10米;圆曲线和缓和曲线起终点、平交道和道岔理论中心点均钉设中线桩。 1.3施工前准备 ⑴轨道铺设基地和轨排倒装站的设置 ⑵路基整修。不论采用何种铺轨方案,在铺轨前都必须根据测量结果进行路基整修,使之达到规范规定的技术要求后,方可铺轨、铺碴。 ⑶预铺部分道碴。为保证铺轨列车的安全行驶,防止压断轨枕和破坏

某市地铁路网管理中心电气施工组织设计(完整版)

某市轨道交通路网管理服务中心电气安装工程施工组织设计(完整版) 1、编制说明 1.1依据: 1.1.1根据国家施工电气施工规范、标准、图集。 化北标办《建筑电气通用图集》、1—13册、DBJ-26-96《建筑安装分项工程施工工艺规范》第四分册、《施工现场临时用电安装技术规范》JGJ46-88、《电气装臵安装施工质量验收规范》GB50303-2002、《建筑安装工程质量检验评定标准》GBJ303-88。 1.1.2该项工程有关的设计施工图:某市轨道交通路网管理服务中心一期工程电施;某市轨道交通路网管理服务中心一期工程弱电施。 1.1.3施工图纸会审记要。 1.1.4土建工程总体施工组织与设计。 1.2定额: 1.2.1全国安装工程预算定额。 1.2.2全国安装工程预算定额某市基价。 2 工程概况: 本工程为某市轨道交通指挥中心、清算管理中心。分为中心综合楼、综合楼辅楼、研发、培训中心、办公楼及职工公寓的建筑群体,属一类高层建筑,防火等级为一级建筑工地面积为5.595万平方米、地上十一层、地下二层、下二层为汽车库、ACC、TCC、OCC电源室;地

下一层为变电所、制冷机房、水泵房及部分ACC机房,一至五层为ACC、TCC、OCC机房,六层以上为办公用房。 3 电气工程概况 3.1 电气工程包含内容 3.1.1 10KV╱0.4 KV供配电系统 3.1.2..动力、照明系统; 3.1.3 防雷接地系统; 3.1.4 火灾报警及联动系统 3.1.5 有线广播系统 3.1.6 楼宇设备自控系统 3.1.7 闭路电视监视系统 3.1.8 安全防范系统 3.1.9 停车场自动化管理系统 3.1 10 综合布线系统 2.1.11 有线电视系统 3.1.12 无线信号接入系统 2.1.13 无线对讲系统; 3.1.14 地卡通系统 3.1.15 多功能会议系统; 3.1.16 主计时时钟系统; 3.1.17 智能化建筑管理系统; 3.2 供电控制方案 本工程为一类高层建筑,防火等级为一级。

安全专项施工方案标准版本

文件编号:RHD-QB-K6351 (解决方案范本系列) 编辑:XXXXXX 查核:XXXXXX 时间:XXXXXX 安全专项施工方案标准 版本

安全专项施工方案标准版本 操作指导:该解决方案文件为日常单位或公司为保证的工作、生产能够安全稳定地有效运转而制定的,并由相关人员在办理业务或操作时进行更好的判断与管理。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 第一章、工程概况 一、工程概述 本工程为年产20万吨已内酰胺一期工程厂外西侧规划道路第二标段,设计使用年限为50年,安全等级为二级,设计抗震烈度6度。工程范围:道路位于巴公镇兰花新材料门前,是一条南北向的主干道,全线现状为土路面,路面破损严重,全长约520.44m宽约12m,为保证施工过程原有道路、交叉道路、出入口的通车、过人功能,同时保证施工运输车辆安全进入工地,特编制交通维护组织措施。

二、编制说明 1、B/T 50903-2013《市政工程施工组织设计规范》。 2、工程施工图纸及相关文件。 3、市政道路施工的相关技术规范。 4、其他有关的国家及地方强制性规范和本工程现场实际情况。 5、我公司现阶段施工能力、管理水平及历年来承担类似工程的施工经验。 第二章、工程特点 一、工程特点 1、本工程道路两侧为临建房屋和厂区围墙及护坡,贯穿于厂区和天辰工程部中间。上下班人流量较大。 2、工期短,又逢雨季及冬季施工,施工难度

大。 第三章、交通维护组织措施 二、基本措施: 1、危险地段,悬挂警示标志; 2、车辆进入施工区域,应有专职人员指挥疏导; 3、进行道路临时封闭施工,并派专人监守,并设置明显临时交通引导标志和禁令标志,确保行人与车辆的安全。 三、施工路段的交通组织 1、交通组织设计 本路段设置临时封闭措施,天辰工程部西侧设置临时道路。 2、设置交通标志及设施 建设工程施工现场,应在明显位置及主要通道、

轨道工程冬季施工方案

目录 一.编制依据..................................................................................................... - 0 - 二.工程概况..................................................................................................... - 0 - 三.冬季施工工期及时间的确定 ................................................................... - 1 - 四.冬季施工措施 ............................................................................................ - 1 - 五.作业准备..................................................................................................... - 2 - 六.技术要求..................................................................................................... - 3 - 七.施工工艺流程 ............................................................................................ - 3 - 八.质量控制技术措施.................................................................................... - 3 - 九.施工要求..................................................................................................... - 5 - 十.劳动力组织................................................................................................. - 6 -十一.材料要求................................................................................................. - 6 -十二.设备和机具 ............................................................................................ - 7 -十三.质量检测................................................................................................. - 7 -十四.安全及环保要求.................................................................................... - 8 -

(强烈推荐)大瑞铁路路基、轨道设计及项目施工方案毕业论文

摘要 本设计是根据毕业设计任务书的要求和相关设计规范的规定,对大瑞铁路K211+000--K213+000段进行路基、轨道设计及施工组织设计。 本设计的主要内容包括路基横断面的设计,土石方量的计算及调配,普通无缝线路的设计和施工组织设计的编写。大理至瑞丽铁路,是我国《中长期铁路网规划》中完善路网布局和西部开发性新线项目之一,也是我国西南进出境通道之一的中缅国际铁路通道的重要组成部分。大瑞铁路是我省贯彻落实国家西部大开发战略,加快中国连接东南亚、南亚国际大通道建设的关键性交通基础设施项目,是实现云南经济社会又好又快发展的一项重点工程,是沿线各族群众期盼已久的一条致富路。 设计中首先读高程绘制横断面,进行土石方计算,第二部分无缝线路设计,进行最不利轮位计算,再对无缝线路稳定性强度检算,第三部分进行无缝线路配轨、轨道设计、轨排组装计算,第四部分编写施工组织,铺轨的施工工序及其工艺。 设计成果包括路基横断面图、施工场地平面布置图等一系列设计图纸,以及设计说明书和各个设计过程的相关数据。 设计所有内容都是依据我国现行的相关规范编写,符合《铁路轨道施工验收规范》要求,符合国家标准。本设计全部设计图纸采用计算机辅助设计绘制,计算机排版,打印出图。 关键词:土石方;无缝线路;轨道设计;铺轨

Abstract This design is based on the design plan descriptions of the graduation requirement and relevant design norms, Dali--Ruili railway K211 + 000-K213 + 000 sections roadbed, course design and the construction organization design. This design include the design of the subgrade cross, the calculation of the quantity of conditions and regulations, and ordinary seamless route design and the writing of the construction organization design. Dali--Ruili railway, is our country long-term rail network planning of network layout and western developmental perfect new project, and also one of southwest China inbound and outbound passage of one of Burma international railway an important part of the channel. Big red is to implement the national railway in the strategy for western development to accelerate China connection southeast Asia, South Asia international thoroughfare construction of key transportation infrastructure project, is the realization of yunnan to the sound and rapid eco-social development of a key project, is all along the anticipation of a riches gradually. Design first read elevation drawing cross conditions for calculation, the second part of seamless route design, the most unfavorable round a calculation, and then a seamless track by calculating the stability strength, and the third part of seamless track rails, orbit with design, GuiPai assembly calculation, the fourth part of writing the construction organization, the railway construction process and its process. The design results including the roadbed cross-sectional diagram, construction site layout and so on a series of design drawings, and the design specification and each of the design process related data. All of the content is designed according to China's current related standard, writing, and in compliance with the railway track construction inspection standard requirement, conform to the state standards. This design all design drawings adopt cad drawing, computer typesetting, a printed map. key words:earth work;The Continuous welded railway;the track of design ;Laying rails

地铁机电安装工程电气施工工艺与控制管理

地铁机电安装工程电气施工工艺与控制管理 摘要:随着社会逐渐进步与现代技术的应用,地铁行业的机电安装工程亦获得了长足的进步。其中,地铁工程电气施工就属于非常重要环节,而对此环节施工加强研究则非常具有意义。基于此,本文主要介绍了地铁行业机电安装工程中的电气施工,并针对加强地铁行业机电安装工程中电气施工控制与质量管理措施进行了分析,以期望可以对提高地铁机电安装工程质量给予帮助。 关键词:地铁机电安装工程;电气施工;工艺与控制管理 1强电工程工艺技术要点 1.1施工准备 首先,做好机电安装与土建施工的协调,基于土建施工完成情况下施行机电安装。其次,不仅要提前做好现场踏勘,严格审查施工图纸,同时还应做好对图纸和现场的比对、研究,以确保施工图纸有效性。此外,按照工程现场状况,合理安排施工人员,优化现场资源,确保后方机电安装有序。 1.2机电安装工程管线铺设 在对机电进行安装时,将会涉及到各种不同设备,故而管道的连接方式也各不相同。但是铺设管道时,因受到各个因素影响,极易产生严重质量问题。倘若对线路的设计不合理,没能遵照施工图纸进行施工,那么必将影响到管道敷设的质量。基于此情况下,施工企业须在进行管道敷设之前进行现场检查,然后依照图纸的要求及设计条件,方能保证机电安装线路合理性。此外,在敷设时还应按照管道的不同要求,选择的处理方式也是不一样的,并针对结构施工要求进行管道预埋、预留。 1.3做好防雷工艺 一是应先对防雷接地体焊接做好,再遵照相关规定进行接地连接,以期进一步提高接地体防腐处理,然后在基于检验合格后实施下一步工作。二是防雷引线的安装,引线与防雷等级有着密切的关系,这就要求施工人员具备一定的专业知识。三是防雷装置的安装,结合现场情况,按设计要求选材配套,确保防雷装置的安全可靠。 1.4预留洞及预留点 随着机电设备数量的不断增加,设计领域也朝着多样化方向发展。在安装过程中,线路较多,比较复杂。施工前对机电施工预留孔洞、预留点进行控制,并加强管理,以满足后续机电安装的具体要求。从总体上看,目前预留洞的位置、尺寸、高度等,这些均是在施工时需要着重给予管理和控制的内容。对比结合设计参数,不仅可以确保预留设计合理准确性,亦可以防止此类问题为机电安装造成的影响,降低由此引发的美观问题、质量问题。 2电气施工工艺与控制管理存在问题 2.1电气施工工艺较落后且优化困难 截止当前,我国机电安装工程中的电气施工技术仍然陈旧,并且很难优化,这在于大数据的收集和理论操作在电气施工过程中起着重要的作用,需要进行一些仿真实验。我国科学技术水平虽然较高,却难以在施工现场配备精密的试验设备,让施工现场处于理想化环境,无法让理论操作实现高精度计算结果,而且很大程度上这些因素也将影响着电气施工技术的运行,尤其会严重影响到机电安装工程的整体质量。因此,在正式施工前,大多企业会交由更专业的计算机构处理这类工作,利用更精密设备进行计算。

安全专项施工方案

第一章工程概况 一、工程概况 ..。 二、施工工期 本工程计划开工:2018年10月8日,计划完工时间:2019年4月30日。 三、安全承诺 始终贯彻“安全第一、预防为主”的方针,建立健全安全保证体系,制定完善的安全管理制度,确保施工期间无重大安全事故和人员伤亡事故。 四、环保承诺 严格遵守国家建设项目的环保规定和本公司的三标一体体系文件,按照环境保护原则办事,既要达到工程建设的规划目标,又要达到美化绿化环境的目的,实现生态效益、经济效益以及社会效益的协调发展。

第二章安全施工保证措施 根据国家行政主管部门制定的各项安全生产法规、规章和制度,结合工程特点,制定本项目的安全生产保证体系。 一、安全生产目标 确保无重大安全生产事故,工伤事故频率控制在0。 二、安全生产保证体系 安全生产体系运转图 三、安全生产管理组织及职责 1、公司经理是企业的法人代表,对公司的劳动保护和安全生产总负责,公司安全领导小组负责对公司所属一切生产、工作场所进行安全督促检查,消除隐患,防止各类事故,保证施工安全生产秩序。 2、部门经理、主任、主管应对本部门劳动保护和安全生产工作具体负责任,认真执行安全生产规章制度并按规章指挥,制定和实施安全技术措施,经常进行安全检查,消除事故隐患,制止违章作业,对职工进行安全技术和安全纪律教育,发生事故要及时上报,并根据“三不放过”(即事故原因没有分析清楚不放过,事故责任者没有受到教育不放过,没有采取切实可行的措施不放过)的原因认真分析事故原因,提出和实现改进措施。 3、班组长负责本班的安全作业,有权拒绝违章指挥,上班前要对所使用的工具、设备、防护用具、作业环境进行安全检查,发现问题立即采取改进措施,指导和督促工人执行各项安全生产规章制度,经常进行现场检查,纠正违章作业现象,及时消除事故隐患。负责对新工人进行班组安全教育,开展经常性的安全教育,督促操作人员正确使用防护用具。发生了工伤事故要立即上报所在部门经理、主管,保护现场,并参加事故调查,组织安全生产竞赛,在评奖时应把安全生产情况作为考核内容之一。 4、专职安全员要经常对所属部门员工进行安全生产教育,督促员工遵守安全操作规程和各种安全生产制度,正确地使用个人防护用品,检查和维护本班组的安全设施,如发现生产中有不安全、不卫生情况,要及时报告,并参加事故的分析和研究,协助公司安全领导小组实施防止事故的措施。 5、生产工人要认真学习并严格遵守各项安全生产规章制度不违章作业,并

(完整版)安装冬季施工方案

安装冬季施工方案 一、工程概况 本工程施工地区位于**省**市**区,该地区冬季较长且寒冷干燥少雪。极端最低气温-32.6℃,最冷月平均气温-9.7℃,最冷月平均相对湿度51%,冬季平均大气压力898.4hPa,最大积雪深度9.0cm,冬季平均风速2.2m/s ,土壤标准冻深120.0cm,基本雪压0.25kN/m2。 根据工程进度分析,处于冬季施工的设备制作与安装、钢结构、管道制作与安装等重点施工步骤的防风、防滑、防冻、防火的等问题较为突出。针对该地区季节特点,焦化项目部根据工程的进度、专业制定了以下冬季施工方案,以确保冬季施工质量及工期。 二、冬季施工方案 1、冬季施工准备工作 ⑴对冬施将要施工的分部分项工程进行图纸复查,列出主要工程实物量,安排好施工进度计划。对不适合冬施要求的分项或部位,及时向建设单位、设计单位提出修改设计建议。 ⑵编制专题冬施方案,达到技术可靠、经济合理,同时组织有关人员学习,并对有关班组详细进行交底。 ⑶按照冬施计划,编制切实可行的冬施物资需用计划,尽快落实货源,及时进场。对有毒、易燃、易爆物品应符合相关的管理规定。 ⑷对掺加外加剂人员、测温保温人员、试验人员及计量、外加剂管理人员定岗定责,加强管理。

2、冬季钢结构工程施工要点 ⑴钢结构制作工程 1)冬季施工中钢结构的制作和安装要严格依据有关钢结构冬季施工规定执行。 2)钢构件正温制作负温安装时,应根据环境温度的差异考虑构件收缩量,并在施工中采取调整偏差的技术措施。 3)参加负温钢结构施工的电焊工必须是经过负温度焊接工艺培训,考试合格,并取得相应的合格证的专业人员。 4)负温下使用的钢材及有关连接材料须附有质量证明书,性能符合设计和产品标准的要求。 5)碱性焊条在使用前必须按照产品出厂证明书的规定进行烘焙,烘焙合格后,存放在80~100℃烘箱内,使用时取出放在保温筒内,随用随取。负温下使用的焊条外露不得超过2小时,超过2小时重新烘焙,焊条烘焙次数不超过3次。焊剂在使用前按规定进行烘烤,使其含水量不超过0.1 %。 6)构件下料时,应预留收缩余量,焊接收缩量和压缩变形量应与钢材在负温度下产生的收缩变形量相协调。 7)负温下对9mm以上钢板焊接时应采用多层焊接,焊缝由下向上逐层堆焊,每条焊缝一次焊完,如焊接中断,在再次施焊之前先清除焊接缺陷。严禁在焊接母材上引弧。一个构件两端不得同时进行焊接。8)在负温度下厚钢板焊接完成后,在焊缝两侧板厚2-3倍范围内立即进行后热处理,加热温度150-300℃,保持1-2h。焊缝焊完后或热

轨道交通轨道铺设施工要点及工艺要求

轨道交通轨道铺设施工要点及工艺要求 1.铺轨门吊走行轨的安装 铺轨门吊是洞内轨排、钢筋、混凝土等材料吊运必不可少的机具之一。为此,对铺轨门吊和走行轨的要求是:铺设及拆除方便、快捷,保证在线路30‰大坡道和400m小曲线半径上门吊走行平衡安全。铺轨门吊一般选择可以根据施工环境的限制进行改装跨距的起吊运输设备,从而满足不同工程施工需要。 在走行轨的的选用上,为便于人工搬运,钢轨不宜太重,为保证走行轨钢轨的支承断面,根据龙门吊吊重时的轴重,一般选用24Kg/m钢轨,走行轨支承点间距为1.0m. 在走行轨铺设方式上采用特制高度可调式钢支墩,龙门吊走行轨一般应超前钢筋网铺设地段进行布设。根据隧道断面及结构底面,钢支墩抽盒底板根据底板面的形状制作成几种不同的结构,可满足各种工况施工的需要。在安装铺轨门吊走行轨钢支墩时,先利用4个M16膨胀螺丝将钢支墩底板固定在隧道底板上或桥面上,再调整钢支墩的高度至确定位置;钢支墩上板采用螺栓与钢轨底板紧固连接。 2.钢筋网的铺设 针对地下线整体道床,钢筋网采取在洞外下料加工,洞内绑扎焊接的作业方式布设。钢筋在轨排井或预留下料口旁捆绑成束,吊入洞内平板车;布设时由洞内龙门吊吊运至铺设地段,一捆一捆分散布置后,人工抬运钢筋散布在道床底板上或隧底填充混凝土面上;人工绑扎固

定,调整网格间距,每个钢筋网片以3-4米最佳。按照纵向每间隔两个轨枕的间距,横向在每两根架立钢筋中点按设计各钉入一个胀锚螺栓,并绑扎在底层钢筋上。胀锚螺栓采用YG2型M16×245螺栓,布置时避开结构筋,钉入深度110mm,露出部分与道床钢筋绑扎在一起,当胀锚螺栓无法与道床钢筋绑扎时,可以不与道床钢筋绑扎。 道床钢筋网应满足杂散电流专业的要求,每段道床块两端第一根横向箍筋为8mm×50mm镀锌扁钢,镀锌扁钢及道床块中每隔不大于5m的一根横向钢筋与所有纵向钢筋焊接,并保证各纵向钢筋的电气连续。 3.埋入式长轨枕轨排的组装 轨排组装前须做好配轨计算,并充分满足焊轨的需要,根据设计文件、技术资料及报经业主批准的无缝线路施工设计方案编制轨排表。直线段长度根据各坡度分段计算,配轨时应按钢轨长度和预留轨缝连续计算,并确定曲线始点前(或后)的钢轨接头。曲线段长度以外股为依据,配轨按外股钢轨长度和预留轨缝连续计算,并确定曲线始点前(或后)的钢轨接头到曲线终点的距离。同一轨排宜选用长度公差相同的钢轨配对,相差量不得大于3mm. 轨枕按照设计规定数量等距悬挂,前后两块间距允许偏差为±10mm.过渡段轨枕间距按设计要求布置。枕位先用白油漆标于轨腰内侧,曲线段标于外轨轨腰内侧。轨枕应与钢轨中轴线垂直,内外对齐,并根据不同地段组装不同型号扣件。轨排应根据铺设顺序来编号,先铺设者在上,后铺设者在下,顺序装车。

工程专项安全施工方案实用版

YF-ED-J6612 可按资料类型定义编号 工程专项安全施工方案实 用版 In Order To Ensure The Effective And Safe Operation Of The Department Work Or Production, Relevant Personnel Shall Follow The Procedures In Handling Business Or Operating Equipment. (示范文稿) 二零XX年XX月XX日

工程专项安全施工方案实用版 提示:该解决方案文档适合使用于从目的、要求、方式、方法、进度等都部署具体、周密,并有很强可操作性的计划,在进行中紧扣进度,实现最大程度完成与接近最初目标。下载后可以对文件进行定制修改,请根据实际需要调整使用。 第一节模板安装与拆除的一般安全要求 一、一般安全要求 (一)模板安装的一般要求 1.模板安装必须按模板的施工设计进行,严禁任意变动。 2.楼层高度超过4m或二层及二层以上的建筑物,安装和拆除钢模板时,周围应设安全网或搭设脚手架和加设防护栏杆。在临街及交通要道地区,尚应设警示牌,并设专人维持安全,防止伤及行人。 3.现浇整体式的多层房屋和构筑物安装上

层楼板及其支架时,应符合下列要求: (1)下层楼板混凝土强度达到1.2MPa以后,才能上料具。料具要分散堆放,不得过分集中。 (2)下层楼板结构的强度要达到能承受上层模板、支撑系统和新浇筑混凝土的重量时,方可进行。否则下层楼板结构的支撑系统不能拆除,同时上下层支柱应在同一垂直线上。 (3)如采用悬吊模板、桁架支模方法,其支撑结构必须要有足够的强度和刚度。 4.当层间高度大于5m时,若采用多层支架支模,则在两层支架立柱间应铺设垫板,且应平整,上下层支柱要垂直,并应在同一垂直线上。 5.模板及其支撑系统在安装过程中,必须

铁路轨道工程施工方案

中铁十四局集团霍尔果斯口岸站施工项目部 二О一二年七月

铁路路堑边坡光面、预裂爆破设计与施工技术标准 轨道工程施工方案 一、编制范围、依据和原则 、编制依据 适用于新建霍尔果斯铁路口岸站,精伊霍铁路 ~ 、 ~ (中哈铁路接轨点),含宽轨场、准轨场、边检场、客运车场、换装场以及相关配套设施,“一关两检”等口岸相关设施,预留快运、特货作业场地等 年开通项目等。 、编制依据 《关于新建霍尔果斯铁路口岸站项目建议书的批复》铁计函〔 〕 号; 《关于新建霍尔果斯铁路口岸站部分站前工程初步设计的批复》铁鉴函〔 〕 号; 《关于新建霍尔果斯铁路口岸站工程初步设计的批复》铁鉴函〔 〕 号; 《铁路工程施工组织设计指南》(铁建设〔 〕 号); 《铁路建设项目竣工验收交接办法》 铁建设〔 〕 号 。 《经霍尔果斯-阿腾科里口岸连接中哈两国铁路专门工作组第五次会议纪要》; 《铁路营业线施工及安全管理办法》(铁办〔 〕 号)。 新建霍尔果斯铁路口岸站工程施工设计图纸; 国家和铁道部现行设计、施工、验收规范、规则、标准以及工程建设标准强制性条文。 新建霍尔果斯铁路口岸站指导性施工组织设计。 、编制原则 坚持确保质量、安全和工期的原则; 坚持不断优化施工方案的原则;

坚持均衡生产、突出重点、统筹兼顾、合理安排和信息化施工的原则; 坚持因地制宜、灵活机动进行临时工程设置的原则; 坚持专业化施工的原则。 二、工程概况 新建霍尔果斯口岸站工程位于新疆伊宁哈萨克自治州境内,包含客站改造以及新建工程两部分。正线铺新轨 铺轨公里,站线铺轨 铺轨公里,铺新岔 组 铺道床 公里;改建拆除线路 公里,重铺 公里,拆除道岔 组,重铺 组,铺道床 公里。 二、主要技术标准 铁路等级: 级重型,准轨正线采用 ,宽轨正线采用 。到发线和其他站线、次要站线采用 千克 米钢轨; 正线数目:单线; 准轨场、宽轨场线路有效长度:准轨 米、宽轨 米; 牵引方式:准轨线电力牵引,宽轨线内燃牵引; 轨距:准轨线轨距 、宽轨线轨距 ; 三、主要工程数量 主要工程量统计表

地铁及轻轨轨道交通地下车站电气施工方案

施工组织设计或施工技术方案报审表编号:轨道交通通用表-047

XX 轨道交通X 号线X 期工程 (XX ——XXX )车站设备安装工程X 标 XX 车站动力、照明电气安装 施 工 方 案 编制 审核 审批 XX 建工集团有限公司XX 轨道交通X 号线X 期工程(XX ——XXX )车站设备安装工程X 标项目经理部 二零一三年三月十八日

目录 一、工程概况 (1) 二、编制依据 (1) 三、主要实物工程量 (1) 四、施工准备 (2) 五、施工工艺流程 (3) 六、车站动力供配电系统安装要点及要求 (4) 七、电气管线、桥架装配方法 (5) 八、设备安装技术措施 (11) 九、电力电缆技术要求和安装方法 (19) 十、电气设备接线及试运

转 (32) 十一、通用电气装置、器具做法 (34) 十二、工程质量控制保证 (41) 十三、安全控制保证措施及文明施工 (43) 十四、施工进度安排 (44) 十五、现场施工管理组织和人力安排 (44) 十六、施工主要机,工具计划 (45)

一、工程概况 XX站为轻轨六号线二期第7个车站,位于XX组团核心区规划行政用地及公园用地北侧,该站为地下二层岛式车站,地下一层为站厅层,地下二层为站台层,车站总面积25502平方米,该站有4个出入口。站厅层净高4.95米,有吊顶,吊顶下净空3.15米, 站台层净高4.65米,有吊顶,吊顶下净空3.1米。站台板下为电缆通道,净高1.9米,本站为降压变电所,站厅左右两端各设置有一个环控电控室,站厅层站台层左右两端各设置有一个照明配电室。 二、编制依据 1.XX市轨道交通X号线X期工程XX站电气施工图。 2.有关规范《建筑工程施工质量验收统一标准》(GB50300-2001)。 3.《地下铁道工程施工及验收规范》(GB50299-1999)。 4.《电气安装工程施工图册》增订本。 5.《民用建筑电气设计与施工》(08D800)。 6.《等电位联结安装》(02D501-2)。 7.《建筑电气工程施工质量验收规范》(GB50303-2002)。 8.其它适用于重庆地区图集和标准。 三、主要实物工程量

最新安全专项施工方案(总体方案

安全专项施工方案(总 体方案)

江门市江海区濠江花园建设项目工程 安全生产施工方案 1 工程概况 1.1工程基本情况 江门市江海区濠江花园建设项目工程位于江门市江海区,五邑路与永康路交界路口;由江门市濠江房地产开发有限公司投资兴建的项目,由江门市建筑设计研究院设计、由江门市工程监理有限公司监理。 本工程为濠江花园建设项目一期工程,北临五邑路,西临永康路(路对面为江门市江海区建设局),南边与碧桂园共用小区道路,西侧为乡村道路。五邑路和小区道路可作为本工程项目的出入口。 1.2 建筑设计概况 设计概况:本工程是由三幢高层商住楼和五组别墅群组成的建设项目,高层商住楼地下室1层,地上24层建筑,地下室面积为4093 m2,总建筑面积约20000m2;建筑结构形式为框架剪力墙结构;别墅群地下室1层,地上4层建筑,总建筑面积约 20000m2。 1.3 施工范围 1、土建工程,包括:零星土石方工程、地基与基础工程、主体结构工程、建筑装修装饰工程、建筑屋面工程等; 2、机电安装工程,包括:建筑电气工程、建筑给排水工程、消防工程等; 3、人防工程; 4、施工用临时用水、用电工程的报装、施工及维护(已含发包人直接发包的专业工程施工用临时用水、用电需求); 5、施工总承包管理及总协调;即对发包人直接发包的专业工程、以及发包人直接发包的专业工程(主要包括:电梯工程、高低压变配电工程、弱电工程、永久性用水、电信工程、煤气主管道的接驳工程等)。 2 编制依据及执行标准 2.1 编制依据

安全控制的目的是保证项目施工中没有危险,不出事故,不造成人身伤亡和财产损失。安全是为质量服务的,质量要以安全作保证,在质量控制的同时,必须加强安全控制,工程质量和施工安全同是工程建设两大永恒主题。 由于建筑施工安全控制的难点多,劳保责任重,施工项目安全控制处在企业安全控制的大环境中,施工现场是企业安全控制的重点。因此,建立本工程的安全管理体系、安全责任制、安全技术措施、安全保证措施,作为本工程施工安全过程中实施安全工作的标准和指导性规则。 2.2 执行标准 1、《中华人民共和国安全生产法》 2、《中华人民共和国消防法》 3、《建设工程安全生产管理条例》 4、《建筑施工安全检查标准》JGJ59-99; 5、《建设工程安全监督管理资料汇编》广州市质监站2000年版; 6、《建筑施工手册》中国建筑工业出版社(京)新登035号; 7、《施工现场临时用电安全技术规范》JGJ 46—2005; 8、《建筑施工高处作业安全技术规范》JGJ 80—91; 9、《建筑机械使用安全技术规程》JGJ 33—2001 J119—2001; 10、设计图纸及有关政府部门颁发的文件; 11、现行国家有关施工规范及标准等; 3 安全管理组织机构 3.1 安全生产领导小组人员架构