公路沥青路面施工技术规范(JTG_F40-2004)

公路沥青路面施工技术规范(JTG_F40-2004)
公路沥青路面施工技术规范(JTG_F40-2004)

第1页

公路沥青路面施工技术规范

目录

1 总则 ···········································································

2 术语、符号、代号 ·································································2.1 术语···················································································

2.2 符号及代号··········································································

3 基层 ······················································································

4 材料 ······················································································4.1 一般规定·············································································4.2 道路石油沥青·······································································4.3 乳化沥青·············································································4.4 液体石油沥青·······································································4.

5 煤沥青················································································4.

6 改性沥青·············································································4.

7 改性乳化沥青·······································································4.

8 粗集料················································································4.

9 细集料················································································4.10 填料 ·················································································

4.11 纤维稳定剂 ········································································

5 热拌沥青混合料路面······························································5.1 一般规定·············································································5.2 施工准备·············································································5.3 配合比设计··········································································5.4 混合料的拌制·······································································5.5 混合料的运输·······································································5.

6 混合料的摊铺·······································································5.

7 沥青路面的压实及成型···························································5.

8 接缝···················································································

5.9 开放交通及其他····································································

6 沥青表面处治与封层······························································6.1 一般规定·············································································6.2 层铺法沥青表面处治······························································6.3 上封层················································································6.4 下封层················································································5.5 稀浆封层和微表处·································································

7 沥青贯入式路面·····································································7.1 一般规定·············································································7.2 材料规格和用量····································································

-1-

第2页

7.3 施工准备·············································································

7.4 施工方法·············································································

8 冷拌沥青混凝土料路面 ··························································8.1 一般规定·············································································8.2 冷拌沥青混合料的配合比设计··················································8.3 冷拌沥青混合料路面施工························································

8.4 冷补沥青混合料····································································

9 透层、粘层·································································9.1 透层···················································································

9.2 粘层···················································································

10 其他沥青铺装工程 ·······························································10.1 一般规定 ···········································································10.2 行人及非机动车道路 ····························································10.3 重型车停车场、公共汽车站 ···················································10.4 水泥混凝土桥面的沥青铺装 ···················································10.5 钢桥面铺装 ········································································10.6 公路隧道沥青路面 ·······························································

10.7 路缘石及拦水带 ··································································

11 施工质量管理与检查验收·····················································11.1 一般规定 ···········································································11.2 施工前的材料与设备检查 ······················································11.3 铺筑试验路段 ·····································································11.4 施工过程中的质量管理与检查 ················································11.5 交工验收阶段的工程质量检查与验收 ·······································11.6 工程施工总结及质量保证期管理 ·············································附录A 沥青路面使用性能气候分区 ··················································附录B 热拌沥青混合料配合比设计方法 ············································附录C SMA混合料配合比设计方法·················································附录D OGFC混合料配合比设计方法···············································附录E 沥青层压实度评定方法 ························································附录F 施工质量动态管理的方法······················································附录G 沥青路面质量过程控制及总量检验方法 ···································附录H 本规范用词说明 ·································································附件:公路沥青路面施工技术规范(JTG F40-2004)条文说明 ················

1 总则 ·····················································································

2 术语、符号、代号 ···································································

3 基层 ·····················································································

4 材料 ·····················································································

5 热拌沥青混合料路面 ································································

6 沥青表面处治及封层 ································································

7 沥青贯入式路面 ······································································

8 冷拌沥青混合料路面 ································································

9 透层、粘层 ············································································

-2-

第3页

10 其他沥青铺装工程··································································

11 施工质量管理与检查验收·························································附录A 沥青路面使用性能气候分区················································附录B 热拌沥青混合料配合比设计方法··········································附录C SMA混合料配合比设计方法 ··············································附录D OGFC混合料配合比设计方法·············································附录E 沥青层压实度评定方法······················································附录F 施工质量动态管理的方法 ···················································附录G 沥青路面质量过程控制及总量检验方法 ································

-3-

第4页

1 总则

1.0.1 为贯彻“精心施工,质量第一”的方针,保证沥青路面的施工质量,特制定本规范。

1.0.2 本规范适用于各等级新建和改建公路的沥青路面工程。

1.0.3 沥青路面施工必须符合国家环境和生态保护的规定。

1.0.4 沥青路面施工必须有施工组织设计,并保证合理的施工日期。沥青路面不得在气温低于10℃(高速公路和一级公路)或5℃(其他等级公路),以及雨天、路面潮湿的情况下施工。

1.0.5 沥青路面宜连续施工,避免与可能污染沥青层的其它工序交叉干扰,以杜绝施工和运输污染。

1.0.6 沥青路面建设应满足公路交通条件及工程所在地的气候条件的需要,气候分区按附录A的分区执行。

1.0.7 沥青路面施工应有良好的劳动保护,确保施工安全。沥青拌和厂具备防火设施。配制和使用液体石油沥青的全过程严禁烟火。使用煤沥青时应采取措施防止工作人员吸入煤沥青蒸气或避免皮肤直接接触煤沥青造成身体损害。

1.0.8 沥青路面试验检测的实验室应通过认证,取得相应的资质,试验人员持证上岗,仪器设备必须鉴定合格。

1.0.9 沥青路面工程应积极采用经试验和实践证明有效的新技术、新材料、新工艺。

1.0.10 沥青路面施工除应符合本规范外,尚应符合国家颁布的现行有关标准、规范的规定。特殊地质条件和地区的沥青路面工程,应根据实际情况,制定补充规定。各省、市、自治区或工程建设单位可根据具体情况,制定相应的技术指南,但技术要求不宜低于本规范的规定。

-4-

第5页

2 术语、符号、代号

2.1术语

2.1.1沥青结合料 asphalt binder,asphalt cement

在沥青混合料中起胶结作用的沥青类材料(含添加的外掺剂、改性剂等)的总称。

2.1.2乳化沥青emulsified bitumen(英), asphalt emulsion,emulsified asphalt(美)

石油沥青与水在乳化剂、稳定剂等的作用下经乳化加工制得的均匀的沥青产品,也称沥青乳液。

2.1.3液体沥青 liquid bitumen(英), cutback asphalt(美)

用汽油、煤油、柴油等溶剂将石油沥青稀释而成的沥青产品,也称轻制沥青或稀释沥青。

2.1.4改性沥青 modified bitumen(英) , modified asphalt cement(美)

掺加橡胶、树脂、高分子聚合物、天然沥青、磨细的橡胶粉或者其他材料等外掺剂(改性剂),使沥青或沥青混合料的性能得以改善而制成的沥青结合料。

2.1.5 改性乳化沥青modified emulsified bitumen (英), modified asphalt emulsion(美)

在制作乳化沥青的过程中同时加入聚合物胶乳,或将聚合物胶乳与乳化沥青成品混合,或对聚合物改性沥青进行乳化加工得到的乳化沥青产品。

2.1.6 天然沥青 natural bitumen (英)natural asphalt(美)

石油在自然界长期受地壳挤压、变化,并与空气、水接触逐渐变化而形成的、以天然状态存在的石油沥青,其中常混有一定比例的矿物质。按形成的环境可以分为湖沥青、岩沥青、海底沥青、油页岩等。

2.1.7透层 prime coat

为使沥青面层与非沥青材料基层结合良好,在基层上喷洒液体石油沥青、乳化沥青、煤沥青而形成的透入基层表面一定深度的薄层。

2.1.8粘层 tack coat

为加强路面沥青层与沥青层之间、沥青层与水泥混凝土路面之间的粘结而洒布的沥青材料薄层。

2.1.9封层 seal coat

为封闭表面空隙、防止水分侵入而在沥青面层或基层上铺筑的有一定厚度的沥青混合料薄层。铺筑在沥青面层表面的称为上封层,铺筑在沥青面层下面、基层表面的称为下封层。

2.1.10稀浆封层 slurry seal

用适当级配的石屑或砂、填料(水泥、石灰、粉煤灰、石粉等)与乳化沥青、外掺剂和水,按一定比例拌和而成的流动状态的沥青混合料,将其均匀地摊铺在路面上形成的沥青封层。

2.1.11微表处 micro-surfacing

-5-

公路工程施工技术规范---路面工程

5路面工程 5.1一般规定 5.1.1路面工程的实测项目规定值或允许偏差按高速公路、一级公路和其他公路(指二级及其以下公路)两档设定。 5.1.2路面工程实没项目规定的检查频率为双车道公路每一检查段内的检查频率,多车道公路的路面各结构层均须按其车道数与双车道之比,相应增加检查数量。 5.1.3各类基层和底基层压实度平均值的代表值(下置信界限)和单点极值均不得超过规定值。小于代表值规定值2个百分点的测点,应按其占总检查点数的百分率计算扣分值。5.1.4垫层的质量要求同相同材料的其他公路的底基层结构要求;联结层的质量要求同相应的基层或面层结构。 5.1.5表层平整度测定以自动或半自动平整度仪为主,全线每车道连续测定按每100m输出结果计算合格率。采用3m直尺测定路面各结构层平整度时,以最大间隙作为指标,按每尺结果计算合格率。合格率不小于95%时,可得规定分值的满分;合格率小于70%时,其平整度指标为零分;合格率小于95%且不小于70%时,则内插扣分。 5.1.6 路面各结构层厚度设定平均的代表值偏差和极值两个指标。当代表值偏差超过标准值时,评为零分;当代表值偏差满足要求但存在超过极值偏差的测点时,按合格率计分。5.1.7 材料要求和配比控制列入各节基本要求,通过检查施工单位提交的资料进行评定。 5.1.8水泥混凝土上加铺沥青面层的复合式路面,两种路面结构均需进行检查评定。水泥混凝土路面结构不检查抗滑构造,平整度可按相应等级公路的标准;沥青面层不检查弯沉;并相应调整各自的规定分值。 5.2水泥混凝土面层 5.2.1基本要求 5.2.1.1 基层经检测,必须符合检验评定标准各项指标的要求,并应进行基层弯沉测定,验算的基层整体模量应满足设计要求。 5.2.1.2 采用的水泥其物理性能和化学成分应符合国家有关标准的规定。 5.2.1.3粗细骨料、水及接缝填缝料应符合施工规范要求。 5.2.1.4施工配合比应根据现场测定水泥的实际标号进行计算,并经试验室试验,选择采用最佳配合比。 5.2.1.5接缝的位置、规格、尺寸及传力杆、拉力杆的设置应符合设计文件的要求。5.2.1.6 路面横向采取的拉毛或机具压槽等抗滑措施,其构造深度应符合施工规范要求。 5.2.1.7 面层与其他构造物相接应平顺,检查井盖顶面高种应高于周边路面1~3m。雨水口标高按设计比路面代5~8m,路面边缘不积水。 5.2.1.8混凝土铺筑后按施工规范要求养生。 5.2.2外观鉴定 见表5.2.2。 5.2.3 外观鉴定 5.2.3.1混凝土板的断裂块数,高速公路和一级公路不得超过评定路段混凝土板总块数的2‰,其他公路不得超过4‰。不符合要求时每超过1‰减2分。对于断裂板应采取适当措施予以处理。

JTGF40-2004公路沥青路面施工技术规范资料

1 总则 1.0.1为贯彻“精心施工,质量第一”的针,保证沥青路面的施工质量,特制定本规。1.0.2 本规适用于各等级新建和改建公路的沥青路面工程。 1.0.3沥青路面施工必须符合环境和生态保护的规定。 1.0.4沥青路面施工必须有施工组织设计,并保证合理的施工工期。沥青路面不得在气温10℃(高速公路和一级公路)或5℃(其他等级公路),以及雨天、路面潮湿的情况下施工。 1.0.5沥青面层宜连续施工,避免与可能污染沥青层的其他工序交叉干扰,以杜绝施工和运输污染。 1.0.6沥青路面施工应确保安全,有良好的劳动保护。沥青拌和厂应具备防火设施,配制和使用液体油沥青的全过程禁烟火。使用煤沥青时应采取措施防止工作人员吸入煤沥青或避免皮肤直接接触煤沥青造成身体伤害。 1.0.7沥青路面试验检测的实验室应通过认证,取得相应的资质,试验人员持证上岗,仪器设备必须检定合格。 1.0.8沥青路面工程应积极采用经试验和实践证明有效的新技术、新材料、新工艺。 1.0.9沥青路面施工除应符合本规外,尚应符合颁布的现行有关标准、规的规定。特殊地质条件和地区的沥青路面工程,可根据实际情况,制订补充规定。各省、市、自治区或工程建设单位可根据具体情况,制订相应的技术指南,但技术要求不宜低于本规的规定。

2 术语、符号、代号 2.1术语 2.1.1沥青结合料asphalt binder,asphalt cement 在沥青混合料中起胶结作用的沥青类材料(含添加的外掺剂、改性剂等)的总称。 2.1.2乳化沥青emulsified bitumen(英), asphalt emulsion,emulsified asphalt(美) 油沥青与水在乳化剂、稳定剂等的作用下经乳化加工制得的均匀的沥青产品,也称沥青乳液。 2.1.3液体沥青liquid bitumen(英), cutback asphalt(美) 用汽油、煤油、柴油等溶剂将油沥青稀释而成的沥青产品,也称轻制沥青或稀释沥青。 2.1.4改性沥青modified bitumen(英) , modified asphalt cement(美) 掺加橡胶、树脂、高分子聚合物、天然沥青、磨细的橡胶粉或者其他材料等外掺剂(改性剂),使沥青或沥青混合料的性能得以改善而制成的沥青结合料。 2.1.5 改性乳化沥青modified emulsified bitumen (英), modified asphalt emulsion(美) 在制作乳化沥青的过程中同时加入聚合物胶乳,或将聚合物胶乳与乳化沥青成品混合,或对聚合物改性沥青进行乳化加工得到的乳化沥青产品。 2.1.6 天然沥青natural bitumen (英)natural asphalt(美) 油在自然界长期受地壳挤压、变化,并与空气、水接触逐渐变化而形成的、以天然状态存在的油沥青,其中常混有一定比例的矿物质。按形成的环境可以分为湖沥青、岩沥青、海底沥青、油页岩等。 2.1.7透层prime coat 为使沥青面层与非沥青材料基层结合良好,在基层上喷洒液体油沥青、乳化沥青、煤沥青而形成的透入基层表面一定深度的薄层。 2.1.8粘层tack coat 为加强路面沥青层与沥青层之间、沥青层与水泥混凝土路面之间的粘结而洒布的沥青材料薄层。 2.1.9封层seal coat 为封闭表面空隙、防止水分侵入而在沥青面层或基层上铺筑的有一定厚度的沥青混合料薄层。铺筑在沥青面层表面的称为上封层,铺筑在沥青面层下面、基层表面的称为下封层。 2.1.10稀浆封层slurry seal 用适当级配的屑或砂、填料(水泥、灰、粉煤灰、粉等)与乳化沥青、外掺剂和水,按一定比例拌和而成的流动状态的沥青混合料,将其均匀地摊铺在路面上形成的沥青封层。 2.1.11微表处micro-surfacing 用适当级配的屑或砂、填料(水泥、灰、粉煤灰、粉等)采用聚合物改性乳化沥青、外掺剂和水,按一定比例拌和而成的流动状态的沥青混合料,将其均匀地摊铺在路面上形成的沥青封层。

公路工程施工安全技术规范-JTG-F90-2015

公路工程施工安全技术规范 1 总则 1.0.1 为规范公路工程施工安全技术,保障施工安全,制定本规范。 1.0.2 本规范适用于各等级新建、改扩建、大中修公路工程。 1.0.3 公路工程施工安全生产应贯彻“安全第一、预防为主、综合治理”的方针。 1.0.4 公路工程施工应制定相应的安全技术措施。 1.0.5 公路工程施工除应符合本规范的规定外,尚应符合国家和行业现行有关标准的规定。 2 术语 2.0.1 危险源 可能造成人员伤害、疾病、财产损失、作业环境破坏或其他损失的因素或状态。 2.0.2 危险源辨识 发现、识别危险源的存在,并确定其特性的过程。 2.0.3 事故隐患 可能导致事故发生的人的不安全行为、物(环境)的不安全状态和管理上的缺陷。 2.0.4 应急预案 针对可能发生的事故,为迅速、有序地开展应急行动而预先制定的行动方案。应急预案由综合应急预案、专项应急预案、现

场处置方案组成。 2.0.5 风险评估 对工程中存在的各种安全风险及其影响程度进行综合分析,包括风险辨识、风险估测、风险评价和防控措施。 2.0.6 特种设备 涉及生命安全、危险性较大的锅炉、压力容器(含气瓶)、压力管道、电梯、起重机械和场(厂)内专用机动车辆等。 2.0.7 特殊作业人员 从事容易发生事故,对操作者本人、他人的安全健康及设备、设施的安全可能造成重大危害的作业的从业人员。 2.0.8 危险性较大工程 在施工过程中存在的、可能导致作业人员群死群伤或造成重大财产损失、作业环境破坏或其他损失的工程。 2.0.9 警戒区 作业现场未经允许不得进入的区域。 3 基本规定 3.0.1 公路工程施工必须遵守国家有关法律法规,符合安全生产条件要求,建立安全生产责任制,健全安全生产管理制度,设立安全生产管理机构,足额配备具相应资格的安全生产管理人员。 3.0.2公路工程施工应进行现场调查,应在施工组织设计中编制安全技术措施和施工现场临时用电方案,对于附录A中危险

沥青混凝土路面施工工艺标准

沥青混凝土路面施工工艺标准 1适用范围 本标准适用于公路及城市道路工程沥青混凝土路面的机械铺筑施工。 2 施工准备 2.1 材料 热拌沥青混合料应符合《公路沥青路面施工技术规范》JTJ032的有关规定。 2.2 机具设备 2.2.1 主要机械设备 2.2.1.1 履带式沥青混凝土摊铺机、轮胎式沥青混凝土摊铺机。 2.2.1.2 压实机械:6?14t双轮钢筒振动压路机,16?20t轮胎式压路机,1?2t手扶式小型振动压路机。 2.2.1.3 其他机械:铣刨机、运输车、铲车、水车、加油车、路面切缝机。 2.2.2 施工及检测工具 2.2.2.1 施工工具:平铁锨、耙子、小火车、浮动机准梁、筛子、镦锤、烙铁、手锤、测镦、铝合金导梁、钎子、绕线支架、紧线器、喷灯。 2.2.2.2 检测工具:3m 直尺、测平机、核子仪、取芯机、数显测温计、水平仪、经纬仪、钢尺、小线等。 2.3 作业条件 2.3.1 沥青混凝土下面层必须在基层验收合格并清扫干净、喷洒乳化沥青24h后方可进行施工。 2.3.2 沥青混凝土下面层施工应在路缘石安装完成并经监理验收合格后进行。路缘石与沥青混合料接触面应涂刷粘结油。 2.3.3 沥青混凝土中、表面层施工前,应对下面层和桥面混凝土铺装进行质量检测汇总。对存在缺陷部分进行必要的铣刨处理。 2.3.4 沥青混凝土中、表面层施工应在下面层及桥面防水层施工完成经监理验收合格后进行。对中、下面层表面泥泞、污染等必须清理干净并喷洒粘层油。 2.3.5 施工前对各种施工机具做全面检查,经调试证明处于性能良好状态,机械数量足够,施工能力配套,重要机械宜有备用设备。 2.4 技术处理 2.4.1 调查现场情况,编制详细可行的沥青混凝土路面施工计划和施工方案,并经监理审批后组织交底。 2.4.2 沥青混凝土路面施工必须成立施工组织机构,使施工准备、摊铺、压实、质检、后勤和设备保障等全过程处于受控状态。 2.4.3 对计划使用的机械设备和混合料配合比,应通过铺筑试验段进行检验,对拌合、运输、摊铺、碾压以及工序衔接等进行优化,提出标准施工方法。 3操作工艺 3.1 工艺流程 3.2 操作方法 3.2.1 测量放线:参照本册公路与城市道路工程施工测量工艺标准”(忸101 )测放。 3.2.2 沥青混凝土混合料的运输。 3.2.2.1 运输沥青混凝土混合料的车辆应每天进行检查,确保车况良好。对运输车司机应进行教育培训。 3.2.2.2 沥青混凝土混合料应采用后翻式大吨位自卸汽车运输,车厢应清扫干净。为防止沥青

公路路面基层施工技术规范试题

公路路面基层施工技术规范 一、选择题 1、沥青路面基层要有足够的强度和刚度,不允许产生的变形或破坏不包括。 A.残余变形 B.抗压破坏 C.剪切破坏 D.弯拉破坏 2、以下不能作为公路路面基层粒料的是:。 A.水泥稳定土 B.级配砾石 C.填隙碎石 D.级配碎石 3、石灰工业废渣稳定土应用 12t 以上压路机碾压,用 12-15t 三轮压路机 碾压,每层的压实厚度不应超过 15 厘米,用 18-20t 三轮压路机碾压时,每层的压实厚度不应超过厘米。 A.15 B.18 C.20 D.25 4、石灰稳定土应在秋末和夏季组织施工,施工期的日最低气温应在50C 以上,并应在第一次冰冻到之前到两个月完成。 A .一个月 B .一个半月C.两个半月D .三个月 5、石灰稳定土基层应严格控制其厚度和高程,其路拱横坡应与一致。 A.边坡 B.路床 C.面层 D.2%--4% 6、级配碎石的不适用层次为。 A.各级公路的基层和底基层 B.高速公路的基层和底基层 C.较薄的沥青面层与半刚性基层之间的中间层 D.以上都不对 7、级配碎石层施工时,应遵守下列规定和要求。 A.允许少量离析现象 B.塑性指数应符合规定 C.级配必须准确 D.颗粒组成顺滑曲线 8、级配碎石用料的要求中,碎石中的扁平、长条颗粒的总含量应不超过

A .5% B. 10% C.20% D.30% 9、级配碎石路拌法施工,拌和结束时,混合料的含水量应均匀,并较最佳含 水量大左右。 A .2% B.3% C. 4% D.1% 10、级配碎石路拌法施工必须分幅铺筑时,纵缝应搭接拌和,应将相邻的 前幅边部的厘米搭接拌和,整形后一起碾压密室。 A.20 B.30 C.50 D. 100 11、级配砾石的适用层次的说法,不对的是有。 A.高速公路底基层 B.轻交通的二级和二级以下公路 C.各级公路的底基层 D.不宜作底基层 12、级配砾石的级配中天然砂砾符合规定的要求,而且塑性指数或 9 以上 时,可以直接用作基层。 A.6 B.7 C.8 D.9 13、填隙碎石适用层次。 A. 一级公路以上的基层 B.高速公路基层 C. 二级公路以下面层 D.各级公路的底基层 14、填隙碎石基层施工分为和湿法两种方法。 A.干法 B.撒布法 C.分层法 D.湿法 15、填隙碎石基层施工,碾压完成后,基层的固体体积率应不小于,底基 层的固体体积率应不小于 83%。 A.90% B.85% C.80% D.83% 16、沥青稳定碎石基层的碎石力学强度指标中的压碎值应小于30%,或 磨耗率小于。

停车场沥青路面工程施工技术方案

停车场沥青路面工程 施工技术方案 一、工程概况 本工程沥青面层下面层为6㎝厚AC-20,上面层为3㎝厚AC-13C改性沥青混凝土。主要结构形式和工程数量见下表: 二、施工组织 (一)工程用电 工地能够满足正常施工用电要求。 (二)机械设备配置(表1) 表一投入机械设备数量表 (三)人员配备 为了提高工作效率,加强施工过程质量控制,我单位建立项目管理组织机构,并加强施工现场、后台等人员配置及分工,定岗定员,专人负责。

现场人员配置:现场工长1名,施工现场管理人员1名,质检工程师1名,机手3 名,普工8名(修边1人,导梁架设1人,摊铺机前后平料4人,碾压辅助2人) 。 运输车队:队长1名,司机9名,运输车辅助工人3人。 (四) 施工原材料 1、石油沥青: a 要求质地均匀、无水份,当加热到170℃时不起泡沫。 b 每批托运到现场的沥青都应附有制造厂的证明和出厂实验报告,说明装运数量、装运日期、定货数量、规定的试验结果。 c 沥青使用前要按规定进行复检试验,提出合格的试验报告。 2、集料及机制砂 A 粗集料 1 、集料应为按要求尺寸轧碎的坚固、强韧、耐久的石料。全部材料必须干净,不得含有泥土、有机物和其它有害杂质,且具有良好的颗粒形状。扁平细长颗粒长与厚或和短边之比超过3:1 的扁平料含量不大于15。 2、当按照JTJ054-94 进行磨耗试验时,沥青路面联接层石料的磨耗率不得超过40,沥青路面面层石料磨耗率不得超过30。 3、当按JTJ057-94 标准方法试验时,其联结层石料饱水抗压强度不应低于80MPa,压碎值不得大于28%;沥青面层石料饱水抗压强度不应低于100MPa,压碎值不应大于25%。 4 、当按HT054-94 标准进行方法试验时,集料的裹附率应在95%以上;按JTJ052-93 最佳方法试验时,对沥青的粘结力不得低于IV级。否则,应自费掺加外掺剂,其外掺剂应取得监理工程师批准。 5 、2mm 筛孔筛余的混合集料应是碎石轧碎的砾石,粗集料中轧碎颗粒含量应在95%以上按重量计。 6 、当按适当比例同其他必须的细集料和填充料混合而成混合料时,所合成的混合料应符合规定的级配要求。 B 细集料 1、细集料应为干净、坚韧、表面粗糙而棱角的颗料,其石料质量应满足粗集料中15

公路沥青路面施工技术规范

7 公路沥青路面施工技术规范 (JTJ 032——94) 1.0.5 沥青面层不得在雨天施工,当施工中遇雨时,应停止施工。雨季施工时必须切实做好路面排水。 1.0.6 沥青路面施工应确保施工安全,施工人员应有良好的劳动保护。沥青拌和厂应具备防火设施,配制液体石油沥青的车间严禁烟火。使用煤沥青的施工人员应防止吸入煤沥青蒸气或皮肤直接接触煤沥青,使身体受到损害。 4.2.1 道路石油沥青适用于各类沥青面层,并应符合下列规定: 4.2.1.1 高速公路、一级公路铺筑沥青路面时,应采用符合本规范附录C表C.1“重交通道路石油沥青技术要求”规定的沥青。 表C.1 重交通道路石油沥青技术要求 试验项目 AH-13 0AH-11 AH-9 AH- 70 AH- 50 针入度(25o C,100g,5s)(0.1mm) 120~ 140 100~ 120 80~ 100 60 ~80 40 ~60 延度(5cm/min,15o C)不小于(cm)10010010010080 软化点(环球法)(o C) 40~ 50 41~ 51 42~ 52 44 ~54 45 ~55 闪点(COC)不小于(o C)230 含蜡量(蒸馏法)不大于(%)3 密度(15o C)(g/cm3)实测记录溶解度(三氯乙烯)不小于(%)99.0 薄膜加热试验163o C5h 质量损失不大于(%) 1.3 1.2 1.00.80.6针入度比不小于(%)4548505558延度(25o C)不小于(cm)7575755040

要求干燥、洁净,其质量应符合本规范附录C表C .12的技术要求。 表C.12 沥青面层用矿粉质量技术要求 指标高速公路、一级公路其他等级公路视密度不小于(t/m3) 2.5 2.45含水量不大于(%)11 粒度范围<0.6mm (%)<0.15mm (%) <0.075mm (%) 100 90~100 75~100 100 90~100 70~100 外观无团粒结块 7.3.4 对用于高速公路和一级公路沥青路面的上面层和中面层的沥青混凝土混合料进行配合比设计时,应通过车辙试验机对抗车辙能力进行检验。在温度60℃、轮压0.7MPa条件下进行车辙试验的动稳定度,对高速公路应不小于800次/mm,对一级公路应不小于600次/mm。 7.6.7 当高速公路和一级公路施工气温低于10℃、其他等级公路施工气温低于5℃时,不宜摊铺热 拌沥青混合料。 7.7.1 沥青混合料的分层压实厚度不得大于l0cm。 7.9.1 热拌沥青混合料路面应待摊铺层表面温度低于50℃后,方可开放交通。 11.4.4 施工单位在施工过程中必须对各种施工材料进行抽样试验,其项目与频度应不少于本规范附录E表E.1的规定。 表E.1 施工过程中材料质量检查的内容与要求 材料检查项目 检查频度 高速公路、一级公路其他等级公路 石油沥青针入度 软化点 延度 含蜡量 每100t 1次 每100t 1次 每100t 1次 必要时 每100t 1次 必要时 必要时 必要时

07《公路工程施工安全技术规范》JTGF90 2015考试题及答案

《公路工程施工安全技术规范》(JTGF90-2015)考试题及答案 姓名:成绩: 一、单选题(每题2分共30题) 1、大雨、大雪、大雾和及以上大风等恶劣天气不得进行露天作业。(C) A:四级B:五级C:六级 2、施工现场生产区、生活区、办公区应分开设置,距离集中爆破区应不小于m。(B) A:300B:500C:800D:1000 3、储油罐与在建工程的防火间距应不小于m,并应远离明火作业区、人员密集区、建(构)筑物集中区。(B) A:10B:15C:20 4、公路工程施工应进行现场调查,应在施工组织设计中编制安全技术措施和施工现场临时用电方案,对于危险性较大的工程应编制,并附具安全验算结果,或组织专家进行论证、审查。(B) A:安全技术措施B:专项施工方案C:技术方案D:施工方案 5、公路工程施工前应进行危险源辨识,并应按要求对桥梁隧道、高边坡路基等工程进行施工安全风险评估,编制,现场应监控。(A) A:风险评估报告B:总体风险评估报告C:专项风险评估报告 6、应对从业人员进行安全生产教育培训,未经培训不得上岗。特殊作业人员应按相关规定经专门培训,取得,持证上岗。(A) A:相应资格证书B:单位同意C:技师证D:高级技工证 7、工程货运车辆运送人员。(C) A:可以B:采取安全措施后可以C严禁 8、双车道施工便道宽度不宜小于m。单车道施工便道宽度不宜小于m,并宜设置错车道,错车道应设在视野良好地段,间距不宜大于300m。设置错车道路段的施工便道有效长度宜不小于20m,宽度宜不小于m。(A) A:6.5、4.5、6.5B:6、4.5、6C:5、4.5、5 9、施工用电设备数量在台及以上,或用电设备容量在kW及以上时,应编制用电组织设计。(A) A:5、50B:5、100C:10、50D:10、100 10、施工现场开挖沟槽边缘与埋设电缆沟槽边缘的安全距离不得小于m。(A) A:0.5B:1.0C:1.5D:2.0 11、总配电箱应设在靠近电源的区域;分配电箱应设在用电设备或负荷相对集中的区域;开关箱与分配电箱的距离不得大于m,开关箱应靠近用电设备,与其控制的固定式用电设备水平距离不宜大于m。(C) A:20、3B:20、5C:30、3D:30、5 12、模板堆放高度不宜超过m。(C) A:1.0B:1.5C:2.0D:2.5 13、支架支撑使用前应预压,预压荷载应为支架需承受全部荷载的倍。(B) A:1.00-1.05B:1.05-1.10C:1.10-1.15D:1.15-1.20 14、水泥隔离垫板的刚度及稳定性应满足要求。袋装水泥应交错整齐码放,高度不得超过袋,且不得靠墙。砂石料堆放不得超过规定高度。(B)

国沥青路面施工技术规范规定

国沥青路面施工技术规范规定,沥青混凝土路面面层压实度的检测方法,是从成型的面层中钻取芯样,按jtj052-93《公路工程沥青及沥青混合料试验规程》规定 方法测定芯样密度 我国沥青路面施工技术规范规定,沥青混凝土路面面层压实度的检测方法,是从成型的面层中钻取芯样,按jtj052-93《公路工程沥青及沥青混合料试验规程》规定方法测定芯样密度。沥青混合料的标准密度以沥青拌和厂取样试验的马歇尔 试件密度为准。路面中取出芯样密度测定方法应与马歇尔试件标准密度测定方法 相同。这样用沥青混合料马歇尔试件标准密度计算的压实度称为马歇尔密度的压 实度,我国规范对压实度要求规定为96%。本文结合工程实例,以马歇尔密度 的压实度为理论基础,对沥青混凝土路面的密实度检测方法与步骤进行了检验分 析研究,以供参考 检验沥青路面面层压实度是用沥青混合料最大理论密度标准进行计算,最 大理论密度是取松散沥青混合料用真空法测定,将混合料试样浸入水中,在真空度为97.3kpa下持续15±2min,解除负压后测定其最大理论密度。这样用最大 理论密度计算的压实度称为最大理论密度的压实度。本文结合规范有关条款及实际,就沥青路面压实度检测中的标准密度取值、实际密度测试方法及压实度标准 等问题进行探讨,提出以理论密度作为压实度检测的标准密度。对任意一种沥青路面而言,压实度都是施工工艺中最重要的施工质量管理项目,在路面质量评定中也是一个重要指标。《公路路基路面现场测试规程》(JTJ059-95)(以下简称“测试规程”)给出其定义式为:K=ρs/ρox100(%)式中:K—沥青面层某一测定部位的压实度(%),ρs—沥青混合料芯样试件的实际密度(g/cm3),ρo—沥青混合料的标准密度(g/cm3)。在《公路工程质量检验评定标准》(JTJ071-98)(以下简称“评定标准”)中规定,沥青混合料的标准密度为拌和厂当天取样的马 歇尔试验标准制件密度ρs或试验路段路面芯样密度ρo,客观上实际密度和标准密度在一定条件下都是定值,因此,压实度也为定值。但由于标准密度取值方法、实际密度试验方法等不同,对检测结果的影响是显而易见的。 1 沥青混合料标准密度检测 按照现行规范,标准密度可以有两种取值方法,即试验路段路面芯样密度或当天 取样的马歇尔试验标准制件密度。结合多年的沥青路面施工以及质量管理经验, 我们发现此二种方法都存在一定的局限性,下面逐一进行分析: 1.1 试验路段路面芯样的密度我们知道,在正式摊铺之前都要铺筑试验 路段,其目的主要是:①确定生产采用的标准配合比;②确定松铺系数;③确定 碾压方法和碾压遍数。只要确定了上述参数,沥青混合料的生产即可正常进行。 在确定上述参数时,压实度也是评价指标之一。当然,如果实际施工过程中所有 的因素如油石比、级配和施工条件等都不发生变化的话,以试验路段密度作为标准密度也是可行的。但实际上,沥青混合料的生产是一个动态过程,实际摊铺的沥青混凝土面层的密度是一个不断变化的数值,它会因当时沥青混合料油石比以 及施工条件的不同而变化。以某路段的实际生产为例,所使用的沥青混合料型为AC-251,最佳油石比为 4.1%。在实际生产过程中,每天的生产状况与试验路 的生产状况很难保持一致,在一定范围内有着相对较大的变化。因此,以试验路段密度作为标准密度在大多数情况下是不可取的。实际应用中也很少以此作为标 准密度。 1.2 当天取样的马歇尔试验标准制件密度在很多工程实践中,常用当天取样的马歇尔密度作为标准密度ρo来计算压实度,当天马歇尔密度是从当天生

公路路面基层施工技术规范

路面基层施工技术规范 信息来源:作者:发布时间:2011-6-14 13:44:27 阅读: 11654 次 F02 JTJ 034-2000路面基层施工技术规范 1 总则 1.0.1为适应我国公路建设需要,建成质量符合要求的公路路面基层,避免因基层质量不好而产生的面层过早破坏现象,特制定本规范。 1.0.2本规范适用于新建和改建各级公路的刚性(水泥混凝土)路面、半刚性(半刚性基层沥青)路面或柔性(柔性基层沥青或中级)路面的基层和底基层施工。 1.0.3本规范规定了水泥稳定土、石灰稳定土、石灰工业废渣稳定土、级配碎石、级配砾石和填隙碎石的施工和质量管理要求。 1.0.4用沥青碎石混合料和沥青贯入式碎石做基层时,其技术要求、施工方法和质量管理应符合国家标准《沥青路面施工及验收规范》(GB50092)。 1.0.5用贫混凝土、碾压式混凝土做基层时,其技术要求、施工方法和质量管理应符合国家标准《水泥混凝土路面施工及验收规范》(GBJ97)和本规范。 1.0.6凡有可能改建提高等级的中级路面,都应采用本规范中的基层结构作为主要承重层,其上可用砂砾土、石屑土、砂土等材料做磨耗层。 1.0.7垫层的技术要求、施工方法和质量管理应符合本规范对同类材料的底基层的规定。 1.0.8本规范采用重型击实试验方法的最大干密度作为标准干密度。 1.0.9本规范涉及的试验方法应符合交通部现行有关试验规程的规定。 2 术语 2.0.1基层 base 直接位于沥青面层下、用高质量材料铺筑的主要承重层或直接位于水泥混凝土面板下、用高质量材料铺筑的一层称做基层。基层可以是一层或两层,可以是一种或两种材料。 2.0.2底基层 sub base 在沥青路面基层下、用质量较次材料铺筑的次要承重层或在水泥混凝土路面基层下、用质量较次材料铺筑的辅助层称做底基层。底基层可以是一层或两层以上,可以是一种或两种材料。 2.0.3细粒土 fine grained soil 颗粒的最大粒径小于9.5mm,且其中小于2.36mm的颗粒含量不少于90%(如塑性指数不同的各种粘性土、粉性土、砂生土、砂和石屑等)。 2.0.4中粒土 medium grained soil 颗粒的最大粒径小于26.5mm,且其中小于19mm的颗粒含量不少于90%(如塑性指数不同的各种粘性土、粉性土、砂性土、砂和石屑等)。 2.0.5粗粒土 coarse grained soil 颗粒的最大粒径小于37.5mm,且其中小于31.5mm的颗粒含量不少于90%(如砂砾土、碎石土、级配砂砾、级配碎石等)。 2.0.6水泥稳定土 cement stabilized soil

《公路工程技术标准》JTG B 新条文应用要点

《公路工程技术标准》JTG B01-2014新条文应用要点新版《公路工程技术标准》JTG B01-2014已自2015年1月1日起施行,为便于设计人员全面把握新标准及其变化,技术质量部组织召开了新标准应用研讨会,现将2014版标准中新条文应用要点总结如下: 1、公路建设中对环境保护新增“保护优先”原则()。 2、高速公路、一、二级公路和有特殊要求的公路建设项目应做环境影响评价和水土保持方案评价()。 3、为节约工程建设资源,公路改扩建项目应充分利用公路废旧材料(;)。 4、明确高速公路分离式断面可采用分幅分期修建()。 5、公路改扩建的时机应根据实际服务水平论证确定;沙漠、戈壁、草原等小交通量地区的高速公路分离式断面路段利用现有二级公路改建为一幅时,其设计洪水频率可维持原标准不变,设计速度不宜大于80Km/h ()。 6、在非机动车、行人密集路段可根据具体情况设置非机动车道和人行道()。 7、二级及以上干线公路应在设计时进行交通安全评价()。 8、公路设计车辆外廓尺寸加大(),相应圆曲线加宽值等应进行调整。 9、公路限制速度作为公路设计的一个重要环节,应根据设计速度、运行速度及路侧干扰与环境等因素综合论证确定()。

10、中央分隔带宽度应根据公路项目中央分隔带功能定位和项目区域建设条件确定,不再指定推荐值();为满足大型货车临时停靠要求,硬路肩宽度有所变化();取消对路基总宽度的指标规定(),只规定公路路基断面中各部分宽度,以便因地制宜选用横断面布置形式和宽度。 11、连续长、陡下坡路段,应结合交通安全评价论证设置避险车道()。 12、为加强安全性,互通式立交、服务区、停车区、公共汽车停靠站等各类出、入口应满足识别视距要求(),设计中需进行视距验算。 13、取消原标准中最小坡长限制及关于长、陡纵坡中间设置缓和坡段的规定(新标准);要求对于连续长、陡纵坡路段应进行安全性评价()。 14、明确提出应进行路基表土综合利用方案设计(),公路改扩建项目应对路面材料再生循环利用进行论证(),以充分利用资源。 15、公路改扩建项目应加强路基、路面拼接设计()。 16、城市周边地区的公路路基设计洪水频率应结合城市防洪标准,考虑救灾通道、排洪、泄洪需求综合确定()。 17、对特重与极重交通荷载等级条件,提高了路基下路床和路堤部分等位置的路基压实度标准(),以适应重载交通不断发展的变化趋势。 18、重载交通条件下可灵活选择路面设计轴载标准,采用分向、分道方式进行路面结构设计()。

沥青路面基层施工技术方案

沥青路面基层施工技术方案 1.0材料 1.1路用的水泥、石子、砂等材料必须监理工程师批准。未经批准的不允许进场,更不准使用。 1.2水泥:选用终凝时间较长(宜在6小时以上),且宜用325#矿渣及普通硅酸盐水泥。快硬水泥、早强水泥以及受潮变质的水泥严禁使用。水泥品牌的选用应考虑其质量稳定性、生产数量、运距等各种因素。水泥每次进场前应有合格证书,每200T应对水泥的凝结时间、标号进行抽检。 1.3碎石:要求其压碎值不超过30%,最大粒径不大于30mm.碎石的颗粒组成应符合JTJ034——93中第 2.2.1.6中2#级配要求。为了施工方便,宜采用10——30mm的粗集料、5——10mm的中集料,0——5mm的石屑细集料三种粒料配合。其粗集料的压碎值、各种粒料的筛分(主要检查所进料的颗粒级配的偏差情况),0.5mm以下细土的塑性指数,小于0.075mm的颗粒含量应符合JTJ034——93中的要求,上述材料进场后的试验项目每2000m3做2个样品试验。 1.4水:凡人或牲畜的饮用水均可用于水泥碎石的施工。 2.0混合料的组成设计 2.1组成设计原则:①粉料含量不宜过多。②在达到强度的前提下,采用最小水泥剂量,但不小于4.0%.③改善集料级配,减少水泥用量,使水泥用量不大于6%.

2.2水泥剂量的配制可采用4%、4.5%、5%、5.5%、6%五种剂量。 2.3每种剂量的试件制取9个(最小数量)。 2.4试件必须在规定的温度(20±2℃)保湿养生6天,浸水养生1天后进行无侧限抗压强度,并计算试验结果的平均值、偏差系数,并计算RX(1-1.645Cv)是否大于Rd(本工程设计强度为 3.5MPa)。设计剂量要选用满足强度的最小剂量,并不超过6%. 2.5根据设计剂量做延迟时间对混合料强度的影响试验,并通过试验确定应该控制的延迟时间。 2.6工地实际采用的水泥剂量与原设计相同。 3.0水泥稳定碎石的质量控制标准。 3.1具体检测技术指标: 3.2每一作业段碾压完成后,立即各项指标的检测,整理好内业资料向监理人员报验(24小时内)强度指标单独报验。监理人员应在现场及时抽检,发现问题及时通知处理。 3.3各分项工程按照《河北省公路工程质量检验评定标准》、《河北省公路工程质量监督检查评比办法》进行评分。各项工程评分必须在97分以上。达不到此要求的不准交工。 4.0施工工艺要点 4.1水泥碎石的施工工艺详见JTJ034-93《公路路面基层施工技术规范》中2.5-2.7条中的内容。 4.2底基层检测及培土模

公路工程技术标准规范标准

公路工程技术规范标准 1 总则 1.0.1 适用范围 本标准适用于新建和改建公路。 新建公路,必须按本标准执行。 改建公路,当利用现有公路的局部路段受条件限制时,对本标准规定的个别技术指标,经过技术经济比较,可作合理变动;对于改线路段,应符合本标准的规定。 1.0.2 公路分级 公路根据使用任务、功能和适用的交通量分为高速公路、一级公路、二级公路、三级公路、四级公路五个等级。 高速公路为专供汽车分向、分车道行驶并全部控制出入的干线公路。 四车道高速公路一般能适应按各种汽车折合成小客车的远景设计年限年平均昼夜交通量为25000~55000辆; 六车道高速公路一般能适应按各种汽车折合成小客车的远景设计年限年平均昼夜交通量为45000~80000辆; 八车道高速公路一般能适应按各种汽车折合成小客车的远景设计年限年平均昼夜交通量为60000~100000辆。 其它公路为除高速公路以外的干线公路、集散公路、地方公路,分四个等级。 一级公路为供汽车分向、分车道行驶的公路,一般能适应按各种汽车折合成小客车的远景设计年限年平均昼夜交通量为15000~30000辆。 二级公路一般能适应按各种车辆折合成中型载重汽车的远景设计年限年平均昼夜交通量为3000~7500辆。 三级公路一般能适应按各种车辆折合成中型载重汽车的远景设计年限年平均昼夜交通量为1000~4000辆。 四级公路一般能适应按各种车辆折合成中型载重汽车的远景设计年限年平均昼夜交通量为:双车道1500车以下;单车道200辆以下。 1.0.3 公路等级的选用 公路等级应根据公路网的规划,从全局出发,按照公路的使用任务、功能和远景交通量综合确定。 一条公路,可根据交通量等情况分段采用不同的车道数或不同的公路等级。

公路沥青路面施工技术规范

公路沥青路面施工技术 规范 TPMK standardization office【 TPMK5AB- TPMK08- TPMK2C- TPMK18】

UDC 中华人民共和国行业标准CJJ P CJJ XX-2009 城镇道路路面设计规范 Code for Pavement Design of Urban Road 征求意见稿 2009-XX-XX发布2009-XX-XX实施

中华人民共和国住房和城乡建设部发布 中华人民共和国行业标准 城镇道路路面设计规范 Code for Pavement Design of Urban Road CJJ XX-2009 批准部门:中华人民共和国住房和城乡建设部 实施日期:2009年X月X日

中国建筑工业出版社 2009 北京

前言 根据建设部2007年7月13日建标[2007] 125号“关于印发《2007年工程建设标准规范制修订工作计划》的通知”的要求,规范编制组在广泛调查研究,认真总结实践经验,吸取相关研究成果,借鉴国外先进技术,并在广泛征求意见的基础上编制了《城镇道路路面设计规范》。 本规范共分九章,即: 总则、术语与符号、基本规定、基层与垫层、沥青路面、水泥混凝土路面、砌块路面、其他路面工程、路面排水,以及四个附录。 本规范的编制: 1 制定了路面设计的控制要素; 2 路面设计上引入了可靠度的概念; 3 沥青路面设计增加了沥青面层底面拉应变和沥青面层剪应力等指标; 4 制订了水泥混凝土路面设计要点; 5 制定了砌块路面设计要点。 本规范由住房和城乡建设部负责管理,由上海市政工程设计研究总院(地址:上海市中山北二路901号,邮政编码:200092)负责具体技术内容的解释。 本规范主编单位:上海市政工程设计研究总院 本规范参编单位:同济大学 北京市市政工程设计研究总院 天津市市政工程设计研究院

公路基层施工技术规范下载

竭诚为您提供优质文档/双击可除公路基层施工技术规范下载 篇一:公路路面基层施工技术规范 路面基层施工技术规范 信息来源:作者:发布时间:20xx-6-1413:44:27阅读:11654次 F02jtj034-2000路面基层施工技术规范 1总则 1.0.1为适应我国公路建设需要,建成质量符合要求的公路路面基层,避免因基层质量不好而产生的面层过早破坏现象,特制定本规范。 1.0.2本规范适用于新建和改建各级公路的刚性(水泥混凝土)路面、半刚性(半刚性基层沥青)路面或柔性(柔性基层沥青或中级)路面的基层和底基层施工。 1.0.3本规范规定了水泥稳定土、石灰稳定土、石灰工业废渣稳定土、级配碎石、级配砾石和填隙碎石的施工和质量管理要求。 1.0.4用沥青碎石混合料和沥青贯入式碎石做基层时,其技术要求、施工方法和质量管理应符合国家标准《沥青路

面施工及验收规范》(gb50092)。 1.0.5用贫混凝土、碾压式混凝土做基层时,其技术要求、施工方法和质量管理应符合国家标准《水泥混凝土路面施工及验收规范》(gbj97)和本规范。 1.0.6凡有可能改建提高等级的中级路面,都应采用本规范中的基层结构作为主要承重层,其上可用砂砾土、石屑土、砂土等材料做磨耗层。 1.0.7垫层的技术要求、施工方法和质量管理应符合本规范对同类材料的底基层的规定。1.0.8本规范采用重型击实试验方法的最大干密度作为标准干密度。 1.0.9本规范涉及的试验方法应符合交通部现行有关试验规程的规定。 2术语 2.0.1基层base 直接位于沥青面层下、用高质量材料铺筑的主要承重层或直接位于水泥混凝土面板下、用高质量材料铺筑的一层称做基层。基层可以是一层或两层,可以是一种或两种材料。 2.0.2底基层subbase 在沥青路面基层下、用质量较次材料铺筑的次要承重层或在水泥混凝土路面基层下、用质量较次材料铺筑的辅助层称做底基层。底基层可以是一层或两层以上,可以是一种或两种材料。

沥青路面施工技术方案[1]

一、编制依据和原则 1、编制依据 施工进度计划依据锦屏水电站对外交通专用公路金林乡、羊房沟段合同文件(合同编号:JPIC-200411、12)和设计补充通知、现行的与本工程相关的公路工程施工规范以及我公司的施工经验和专项工程施工能力编制。 2、编制原则 根据本合同工程(包括金林乡、羊房沟两个合同段,以下简称本合同段)的施工特点和施工技术总体规划,结合在以往类似工程中的施工经验,初拟施工总进度编制原则如下: 1、严格按照招标文件规定的合同控制工期,充分发挥在公路工程施工中的技术优势,科学合理安排施工程序及施工进度,确保合同总工期如期实现。 2、统筹安排、合理编制施工程序,组织好全线平行交叉作业和流水作业。 3、充分考虑现场各种施工干扰因素、突发因素对工期的影响,采用适中的施工强度指标安排进度计划,对施工中的不可预见因素皆有回旋余地。 二、路面工程进度计划 根据我公司的施工进度计划安排原则、施工程序,以及发包人对本工程的工期要求,结合我公司的机械化施工能力和施工水平,具体进度计划见:《施工进度计划横道图》。 1、施工进度安排 根据本标段工程特点,就各项目工程施工工期具体安排如下: 1、施工准备 从2005年11月25日开始着手组织路面工程的施工,并在30天完成本合同段所需的全部临建设施的建设安装,以确保本合同工程顺利施工。

2、路面基层 本分项工程包括水泥稳定土基层、级配碎石底基层施工,计划于2005年12月15开工,2006年3月15日完工。具体工程进度安排见“施工总进度计划横道图”。 3、路面铺筑 本分项工程按通知要求初拟于2005年12月25日开工,2006年3月31日完工。具体工程进度安排见“施工总进度计划横道图”。 8、其他附属工程 本分项工程初拟于2006年3月1日开工,2006年5月31日完工,具体工程进度安排见“施工总进度计划横道图”。

公路工程施工安全技术规范

公路工程施工安全 技术规范 1 2020年4月19日

公路工程施工安全技术规范 1总则 1.0.1为规范公路工程施工安全技术,保障施工安全,制定本规范? 1.0.2本规范适用于各等级新建?改扩建?大中修公路工程? 1.0.3公路工程施工安全生产应贯彻”安全第一?预防为主?综合治理”的方针? 1.0.4公路工程施工应制定相应的安全技术措施? 1.0.5公路工程施工除应符合本规范的规定外,尚应符合国家和行业现行有关标准的规定? 2术语 2.0.1危险源 可能造成人员伤害?疾病?财产损失?作业环境破坏或其它损失的因素或状态? 2.0.2危险源辨识 发现?识别危险源的存在,并确定其特性的过程? 2.0.3事故隐患 可能导致事故发生的人的不安全行为?物(环境)的不安全状态和管理上的缺陷? 2.0.4应急预案 针对可能发生的事故,为迅速?有序地开展应急行动而预先制定的行动方案?应急预案由综合应急预案?专项应急预案?现场处理方案组成?

2.0.5风险评估 对工程中存在的各种安全风险及其影响程度进行综合分析, 包括风险辨识?风险估测?风险评价和防控措施? 2.0.6特种设备 涉及生命安全?危险性较大的锅炉?压力容器(含气瓶)?压力管道?电梯?起重机械和场(厂)内专用机动车辆等? 2.0.7特殊作业人员 从事容易发生事故,对操作者本人?她人的安全健康及设备?设施的安全可能造成重大危害的作业的从业人员? 2.0.8危险性较大工程 在施工过程中存在的?可能导致作业人员群死群伤或造成重大财产损失?作业环境破坏或其它损失的工程? 2.0.9警戒区 作业现场未经允许不得进入的区域? 3基本规定 3.0.1公路工程施工必须遵守国家有关法律法规,符合安全生产条件要求,建立安全生产责任制,健全安全生产管理制度, 设立安全生产管理机构,足额配备具相应资格的安全生产管理人员? 3.0.2公路工程施工应进行现场调查,应在施工组织设计中编制安全技术措施和施工现场临时用电方案,对于附录A中危险 性较大的工程应编制专项施工方案(内容见附录B),并附具安 全验算结果,或组织专家进行论证?审查?