文档库 最新最全的文档下载
当前位置:文档库 › 2018USACO真题Gold2

2018USACO真题Gold2

2018USACO真题Gold2

USACO 2017 D ECEMBER C ONTEST , G OLD

P ROBLEM 2. B ARN P AINTING

Farmer John has a large farm with barns (), some of which are already painted and some not yet painted. Farmer John wants to paint these remaining barns so that all the barns are painted, but he only has three paint colors available.

Moreover, his prize cow Bessie becomes confused if two barns that are directly reachable from one another are the same color,so he wants to make sure this situation does not happen.

It is guaranteed that the connections between the barns do not form any 'cycles'. That is, between any two barns, there is at most one sequence of connections that will lead from one to the other.

How many ways can Farmer John paint the remaining yet-uncolored barns?

INPUT FORMAT (file barnpainting.in):

The first line contains two integers and (), respectively the number of barns on the farm and the number of barns that have already been painted.

The next lines each contain two integers and () describing a path directly connecting barns and .The next lines each contain two integers and (, ) indicating that barn is painted with color .OUTPUT FORMAT (file barnpainting.out):

Compute the number of valid ways to paint the remaining barns, modulo , such that no two barns which are directly connected are the same color.

SAMPLE INPUT:

4 1

1 2

1 3

1 4

4 3

SAMPLE OUTPUT:

8 Problem credits: Nick Wu N 1≤N ≤105N N K 0≤K ≤N N ?1x y 1≤x ,y ≤N ,x ≠y x y K b c 1≤b ≤N 1≤c ≤3b c +7109

https://www.wendangku.net/doc/af13455691.html,

工程项目管理期末考试试题

2015--2016年第二学期期末考试试题 科目:《工程项目管理》A卷 适用专业:2014级工程管理类 题号一二三四总分得分 本试卷共四大题,共6页,考试分数100分,考试时间90分钟。 一、名词解释(每题3分,共18分) 1.建筑工程招投标: 2.项目成本控制: 3.建筑工程项目质量管理: 4.项目经理: 5.挣值法: 6.建筑工程项目管理组织:

二、选择题(每题2分,共10分) 题号 1 2 3 4 5 答案 1.下列不是流水参数中空间参数的为()。 A.工作面 B.施工段 C.施工层 D.流水步距 2.投标人在递交投标文件以后,在投标截止时间之前,可以对()进行补充修改或撤回,并书面通知招标人。 A.投标文件 B.招标文件 C.履约担保 D.投标保证金 3.建筑工程项目质量控制的要求按企业质量体系的要求,贯彻企业的质量方针,坚持质量第一,预防为主。坚持“()”循环的工作方法,不断改进过程控制。 A.计划、执行、检查、处理 B.计划、检查、执行、处理 C.计划、处理、检查、执行 D.计划、检查、处理、执行 4.()是岗位责任制的重要组成部分,是企业安全管理中最基本的一项制度。 A.企业管理制 B.安全生产责任制 C.建筑工程项目管理制 D.建筑工程项目招投标制 5.下列不是建筑工程项目风险的特点的是()。 A.多样性 B.规律性 C.复杂性 D.全局性 三、简答题(每题8分,共32分) 1.简述工程项目管理的特点; 2.简述竣工验收的作用;

3.简述建筑工程招投标的意义; 4.简述建筑工程项目合同管理的概念和特点。 四、案例分析与计算题(本大题共3小题,共40分) 1.某工程有八项工作组成,它们之间的网络逻辑关系如下表所示,试绘制双代号网络图计算工作的时间参数、工期并找出关键线路并给节点编号。(单位:天/d) A B C D E F G H 工作 名称 紧前 --- --- A A BC D D AEF 工作 2 4 3 3 3 4 2 4 持续 时间

中考英语一般将来时中考真题(1)

必备英语中考英语一般将来时中考真题 一、初中英语一般将来时 1.There ___________ a meeting tomorrow afternoon. A. will be going to B. will going to be C. is going to be D. will go to be 【答案】 C 【解析】【分析】句意:明天下午将有一次会议。根据时间状语tomorrow afternoon 可知这里应该是there be结构的将来时:there will be或there is going to be,根据句意,故答案为C。 【点评】考查be going to表示按计划,安排将要发生的事。注意掌握一般将来时的构成,意义和用法。 2.I’m so lucky because I see more cartoon characters next month. A. is able to B. will be able to C. be able to D. was able to 【答案】B 【解析】【分析】句意:我真幸运因为我下个月能看到更多的卡通人物。next month表将来,因此用will be able to。故选B。 【点评】考查一般将来时。 3.—Have you watched the new movie Kung Fu Panda 3, Kelly? —Not yet. I _____ it with my classmate tonight. A. will watch B. was watching C. have watched 【答案】A 【解析】【分析】句意:—凯莉,你看过新电影《功夫熊猫3》吗?—还没有呢。今天晚上我要和我的同学一起去看。A. will watch一般将来时态形式;B. was watching过去进行时态形式;C. have watched现在完成时态形式。本句描述的是今天晚上将要发生的动作,句子用一般将来时态。故选A。 【点评】本题考查时态辨析。以及will watch;was watching;have watched三种时态的用法和区别 4.I _________ the shops. Can I get you anything? A. go to B. went to C. have gone to D. am going to 【答案】 D 【解析】【分析】句意:我将去商店,我可以给你买一些东西吗迭项八是一般现在时,表示经常性的行为或状态;选项B是一般过去时,表示动作发生在过去,和现在没有关系;选项C 是现在完成时,表示过去发生的动作对现在造成的影响或结果。根据Can I get you anything?

(word版)2020一建《项目管理》真题及答案解析(完整版)

(word版)2020一级建造师《项目管理》考试真题及答案解析(完整版) 一、单项选择题(共70小题,每题1分,每题的备选项中只有1个最符合题意) 1.建设工程管理工作的核心任务是()。一、单项选择题(共70题,每题一分,每题的备选 项中,只有一个最符合题意) 1.建设工程管理的核心任务是()。A.质量管理 B.安全管理 C.目标控制 D.增值服务 【答案】D 【解析】建设工程管理工作是一种增值服务工作,其核心任务是为工程的建设和使用增值 【考点来源】第一章第一节建设工程管理的内涵和任务 2.根据《建设项目工程总承包管理规范》,项目总承包方项目管理工作涉及()。A.项 目决策管理、设计管理、施工管理和试运行管理 B.项目设计管理、施工管理、试运行管理和项目收尾 C.项目决策管理、设计管理、施工管理、试运行管理和项目收尾 D.项目设计管理,采购管理,施工管理、试运行管理和项目收尾 【答案】D 【解析】参考《建设项目工程总承包管理规范》GB/T50358-2017的规定,项目总承包方的管 理工作涉及: (1)项目设计管理。 (2)项目采购管理。 (3)项目施工管理。 (4)项目试运行管理和项目收尾等。 【考点来源】第一章第二节建设工程项目管理的目标和任务 3.关于项目管理职能分工表的说法,正确的是()。 A.业主方和项目各参与方应编制统一的项目管理职能分工表 B.管理职能分工表不适用于企业管理 C.可以用管理职能分工描述书代替管理职能分工表 D.管理职能分工表可以表示项目各参与方的管理职能分工 【答案】D 【解析】A项错误,业主方和项目各参与方,如设计单位、施工单位、供货单位和工程管理咨 询单位等都有各自的项目管理的任务和其管理职能分工,上述各方都应该编制各自的项目管理 职能分分工表。B项错误,管理职能分工表是用表的形式反映项目管理班子内部项目经理、各

项目管理学期末考试试题

项目管理期末考试试题 一、名词解释(20’) 1 项目管理:现代项目管理认为:项目管理是运用各种知识、技能、方法与工具,为满足或超越项目有关各方对项目的要求与期望所展开的各种管理活动。其中,一个项目的有关各方所需满足的要求与期望是复杂多变的。 2 集成管理:项目集成管理是为确保项目各专项工作能够有机地协调和配合而开展的一种综合性和全局性的项目管理工作。它包括协调各种相互冲突的项目目标、选用最佳或满意的项目备选方案、以及集成控制项目的变更和持续改善项目工作方法等方面的内容。 3 范围管理:项目范围是指项目的“产出物范围”和项目的“工作范围”的总和。项目范围管理是指对于项目产出物和工作范围的全面识别、确认和控制的管理工作。 4 挣得值:挣值是一个表示已完成作业量的计划价值的中间变量。这一变量的计算公式如下:EV=实际完成作业量╳其计划成本(价值) 二、简答(20”) 1、项目管理与运营管理的区别 1)管理的对象不同。项目管理的对象是一个或多个项目,管理的是有关项目的评估、决策、和控制过程;而日常运营管理的对象是企业生产和运营的决策、实施与控制。项目管理的对象是一次性的、独特性的项目,而日常运营管理的对象是周而复始的经常性的日常运营工作。 2)管理的方法不同。项目管理的方法与日常运营管理的方法也是不同的,因为项目管理是面向任务和过程的,而日常运营管理是面向部门的和程序化工作的,所以项目管理的方法中有许多针对具体任务的管理技术与方法,而日常运营管理中有更多的部门协调、指挥命令等针对日常运营管理的方法与工具。 3)管理的周期不同。项目管理的周期是一个项目的生命周期,这是相对比较短暂的,而日常运营管理的周期是相对长远的,多数企业希望能够永续经营,期望自己的企业能够通过科学的管理一直能够经营下去。 2、项目的特性 各种不同专业领域中的项目在内容上可以说是千差万别,不同项目都具有自己的特性。但是从本质上来说,项目是具有共同特性的,不管是科研项目、服务项目、服务项目还是房地产开发项目,项目的这些共同特性如下:、 (1)目的性:指任何一个项目都是为实现特定的组织目标服务的。 (2)独特性:指项目所生成的产品或服务与其他产品或服务都有一定的独特之处。

最新一般将来时中考试题分类汇编

最新一般将来时中考试题分类汇编 一、一般将来时 1.—I wonder if you for a picnic tomorrow. —If it ,I will go. A. go, not rain B. go, doesn't rain C. will go, isn't rain. D. will go, doesn't rain. 【答案】 D 【解析】【分析】句意:--我想知道明天你是否去野餐。--如果天不下雨,我就去。分析:第一个句子为宾语从句,主句为一般现在时,从句用原来的时态;第二个句子为条件状语从句,体现主将从现的原则,主语是第三人称单数,因此助动词用does.故选D 【点评】考查动词的用法。 2.Look on the bright side of life,and imagine that you ______ a happy and successful future. A. had B. will have C. have D. have had 【答案】 B 【解析】【分析】考查时态.句意"看看生活中美好的一面,想象你会有一个幸福和成功的未来.".A过去时.B一般将来时态.C动词原形.D现在完成时态.结合语境"看看生活中美好的一面,想象你___一个幸福和成功的未来.",由future未来,可知,表示将来,用一般将来时态.答案是B. 3.— There ________a football match on TV tonight. I can't wait to watch it. — Me, too. It's ________ Guangzhou Evergrande and the Australian team Melbourne Victory. A. will be; between B. will be; both C. will have; between D. will have; both 【答案】A 【解析】【分析】句意为:---今晚将有一场电视直播足球比赛,我非常想看。---我也是。这是广州恒达足球俱乐部与澳大利亚墨尔本足球俱乐部之间的比赛。根据语境,这是there be结构的一般将来时,应用there will be;both指两者,between指两者之间。故选A。 【点评】考查there be结构以及词语辨析。 4.If you want to visit the Palace Museum, I ________ tickets for you tomorrow. A. will book B. booked C. have booked D. was booking 【答案】 A 【解析】【分析】句意:如果你想参观故宫博物馆,我明天给你订票。book,订购,A.一般将来时;B.一般过去时;C.现在完成时;D.过去进行时。根据tomorrow,可知动词用一般将来时,故选A。

2018年一建《项目管理》真题答案及解析

一、单项选择题 1.根据国际设施管理协会的界定,下列设施管理的内容中,属于物业运行管理的是()。 A.财务管理 B.空间管理 C.用户管理 D.维修管理 233网校答案:D 233网校解析:物业运行管理主要包括维修管理和现代化。该题目是2016年真题的再现。 2.关于《项目管理知识体系指南(PMBOK指南)》中项目集和项目组合的说法,正确的是()。 A.项目组合的管理包括识别、排序、管理和控制项目等 B.项目组合中的项目一定彼此依赖或有直接关系 C.项目集指的是为有效管理实现战略业务目而组合在一起的项目 D.项目集中不包括各单个项目范围之外的相关工作 233网校答案:A 233网校解析:考查建设工程项目管理的背景和发展趋势(PMBOK)。选项B,项目组合中的项目或项目集不一定彼此依赖,或者有直接关系;选项C, 它的表达是指项目组合,而项目集是指一组相互关联且被协调管理的项目;选项D,项目集中可能包括单个项目范围。参见教材P8。 3.关于施工方项目管理的说法,正确的是()。 A.可以采用工程施工总承包管理模式 B.项目的整体利益和施工方本身的利益是对立关系 C.施工方项目管理工作涉及项目实施阶段的全过程 D.施工方项目管理的目标应根据其生产和经营的情况确定 233网校答案:C 233网校解析:A选项中,采用施工总承包管理模式是站在业主方的角度的论述,不正确。B选项,项目的整体利益和施工方本身的利益是对立统一的关系,

不正确。D选项,施工方项目管理的成本目标应该根据其生产和经营的情况确定,而不是全部目标,错误。参见教材P10。 4.关于项目结构分析的说法,正确的是()。 A.同一个建设工程项目只有一个项目结构的分解方法 B.居住建筑开发项目可根据建设的时间对项目结构进行逐层分解 C.群体项目最多可进行到第二层次的分解 D.单体工程不应再进行项目结构分解 233网校答案:B 233网校解析:同一个建设工程项目有多个项目结构分解方法,可以按照时间、构成等进行逐层分解,群体项目、单体工程可以进行多层次分解。参见教材P13。 5.下列项目策划的工作内容中属于项目决策阶段合同策划的是()。 A.项目管理委托的合同结构方案 B.方案设计竞赛的组织 C.实施期合同结构总体方案 D.项目物资来购的合同结构方案 233网校答案:C 233网校解析:判断是否是决策阶段的一个要点在于是否包含了“决策期、实施期、使用期”或者是“总体方案”。按照这个技巧,可以迅速判断C选项为正确选项。参见教材P31。 6.下列项目策划的工作内容中,属于项目实施管理策划的是() A.项目实施期管理总体方案 B.生产运营期设施管理总体方案 C.生产运营期经营管理总体方案 D.项目风险管理与工程保险方案 233网校答案:D 233网校解析:该题目的技巧与上一个题目的技巧是相同的。参见教材P32。

四川大学《项目管理学》试题库

《项目管理学》试题库 10201000130.建设工程项目管理的时间范畴是建设工程项目的()。 A.全寿命周期 B.决策阶段 C.实施阶段 D.施工阶段 正确答案: C 10201000230.建设工程项目管理的核心任务是项目的()。A.目标规划 B.目标比选 C.目标论证 D.目标控制 正确答案:D 10201000320.建设项目管理的核心主体是()。 A.工程总承包方 B.业主方 C.施工总承包方 D.工程咨询方 正确答案:B 10201000321.对于建设工程项目而言,虽然有代表不同利益方的项目

管理,但核心是( ) 方的项目管理。 A.设计 B.总承包 C.监理 D.业主 正确答案: D 10201000420.按照建设工程项目不同参与方的工作性质和组织特征划分的项目管理类型,施工方的项目管理不包括()的项目管理。A.施工总承包方 B.建设项目总承包方 C.施工总承包管理方 D.施工分包方 正确答案:B 10201000530.建设工程项目的全寿命周期包括( )。 A.决策阶段、实施阶段和使用阶段 B.设计阶段、招标阶段和施工阶段 C.设计阶段、施工阶段和使用阶段 D.可行性研究阶段、设计阶段和施工阶段 正确答案:A 10201000521.建设工程项目的全寿命周期不包括项目的()。A.决策阶段 B.设计阶段

C.实施阶段 D.运营阶段 正确答案:B 10201000522.建设工程项目的全寿命周期不包括项目的()。A.决策阶段 B.保修阶段 C.实施阶段 D.运营阶段 正确答案:B 10201000533.建设工程项目的全过程管理包括()。 A.决策阶段的开发管理+实施阶段的项目管理+使用阶段的设施管理B.决策阶段的开发管理+实施阶段的项目管理+使用阶段的物业管理C.决策阶段的开发管理+实施阶段的建设管理+使用阶段的设施管理D.决策阶段的开发管理+实施阶段的建设管理+使用阶段的物业管理正确答案:A 10201000534.在全寿命周期中,将项目决策阶段的管理称为( )。A.开发管理 B.设施管理 C.项目管理 D.决策管理 正确答案: A 10201000620.项目决策期管理工作的主要任务是()。

一般将来时中考题集锦

译林版中考英语九年级英语一般将来时中考题集锦 一、初中英语一般将来时 1.- Do you have any plans for tonight? - Yes, I at the new Italian restaurant in town. A. eat B. have eaten C. ate D. am going to eat 【答案】 D 【解析】【分析】句意:——你今晚有什么计划吗? ——是的, 我打算在镇上新开的意大利饭馆吃饭。根据句中的时间词“tonight”判断此句应是一般将来时, 结构:am/is/are+ going to do; will do.故直接选D即可。 【点评】一般将来时 2.Could you tell me____? A. when will they leave Beijing B. when would they leave Beijing C. when they will leave Beijing D. when they would leave Beijing 【答案】 C 【解析】【分析】句意:你能告诉我他们什么时候离开北京吗?这是含有宾语从句的主从复合句。从句用陈述语序,疑问词+主语+谓语,故排除A B;主句中的could表示语气的委婉,不是过去时。根据句意,从句用一般将来时。故选C。 【点评】此题考查宾语从句。注意从的语序和时态。 3.There ______ a funny cartoon on CCTV 6 this evening. A. will B. will have C. is going to be D. is going to have 【答案】 C 【解析】【分析】句意:今天晚上CCTV6有一部有趣的动画片。今天晚上,将会有,用there will be 或者there is going to be因为a funny cartoon是单数。故选C。 【点评】考查时态的用法。 4.—You'd better take an umbrella. The weather report says it in the afternoon. — Thank you. I will put one in my bag. A. will rain B. rains C. is raining 【答案】 A 【解析】【分析】句意:——你最好带把伞。天气预报说是下午要下雨。——谢谢你。我会在包里放一个。A一般将来时,B一般现在时,C现在进行时,根据 in the afternoon和 I will put one in my bag 可知时态是一般将来时,故选A。 【点评】考查时态,注意一般将来时的用法。

最新一般将来时中考真题 经典

最新一般将来时中考真题经典 一、一般将来时 1.—Could you tell me_______? —In five minutes, at 10: 25. A. when did the next underground arrive B. when the next underground arrived C. when will the next underground arrive D. when the next underground will arrive 【答案】D 【解析】【分析】句意:—你能告诉我下一个地铁什么时候到吗?—五分钟后,10点25分。tell后跟宾语从句,宾语从句需用陈述句语序,A、C两项都是疑问句语序,可排除。根据答语In five minutes,结合句意语境,可知还没有到站,需用一般将来时态,故答案选D。 【点评】考查宾语从句。根据语境确定宾语从句的时态,注意陈述语序。 2.—Excuse me,could you please tell me if the meeting ________ on time? —If it ________ tomorrow,we'll have to put it off. A. will hold; snows B. will be held; snows C. will be held; snow D. holds; will snow 【答案】B 【解析】【分析】句意:—打扰了,请你告诉我会议是否准时举行好吗?—如果明天下雪,我们只好推迟了。第一个if引导的是宾语从句,表示将来会发生的事,用will表将来,hold the sports meeting 举办运动会。所以the sports meeting做主语,应该用被动语态。第二个if引导的是条件状语从句,主句是一般将来时,if从句则用一般现在时。故选B。 【点评】考查动词时态,if引导的条件状语从句使用主将从现。 3.In the near future, there ________ self-driving cars in our city. A. is B. was C. are D. will be 【答案】 D 【解析】【分析】句意:在不久的将来,我们城市将会有自动驾驶汽车。根据In the near future,可知时态是一般将来时,there be结构的一般将来时为:there will be,故选D。 【点评】考查时态,注意there be结构的一般将来时为:there will be的用法。 4.We ________ a party for Kate. It's supposed to be a surprise. A. were having B. had C. will have D. have had 【答案】C 【解析】【分析】句意:我们将为凯特举办一个聚会。这应该是个惊喜。根据句意语境可知举办聚会这个动作还没有发生,需用一般将来时,故选C。 【点评】考查动词时态辨析题。熟练掌握时态的用法。

2018一建《管理》真题及答案

2018 年全国一级建造师执业资格考试试卷 建设工程项目管理 注意:按 2018 版教材提供答案页码。 一、单项选择题(共 70 题,每题 1 分。每题的备选项中,只有 1 个符合题意) 1.根据国际设施管理协会的界定,下列设施管理的内容中,属于物业运行管理的是()。P2 A.财务管理B.空间管理C.用户管理D.维修管理 2.关于《项目管理知识体系指南(PMBOK 指南)》中项目集和项目组合的说法,正确的是()。P8 A.项目组合的管理包括识别、排序、管理和控制项目等 B.项目组合中的项目一定彼此依赖或有直接关系 C.项目集指的是为有效管理实现战略业务目而组合在一起的项目 D.项目集中不包括各单个项目范围之外的相关工作 3.关于施工方项目管理的说法,正确的是()。P10 A.可以采用工程施工总承包管理模式 B.项目的整体利益和施工方本身的利益是对立关系 C.施工方项目管理工作涉及项目实施阶段的全过程 D.施工方项目管理的目标应根据其生产和经营的情况确定 4.关于项目结构分析的说法,正确的是()。P13、15 A.同一个建设工程项目只有一个项目结构的分解方法 B.居住建筑开发项目可根据建设的时间对项目结构进行逐层分解 C.群体项目最多可进行到第二层次的分解 D.单体工程不应再进行项目结构分解 5.下列项目策划的工作内容中属于项目决策阶段合同策划的是()。P32 A.项目管理委托的合同结构方案B.方案设计竞赛的组织 C.实施期合同结构总体方案D.项目物资来购的合同结构方案 6.下列项目策划的工作内容中,属于项目实施管理策划的是()。P33 A.项目实施期管理总体方案B.生产运营期设施管理总体方案 C.生产运营期经营管理总体方案D.项目风险管理与工程保险方案 7.施工总承包管理模式与施工总承包模式相比在合同价方面的特点是()。P40 A.合同总价可以一次确定B.分包合同价对业主相对透明 C.不利于业主节约投资D.确定建设项目合同总额的依据不足

项目管理试题及其答案

软件学院研究生课程“IT项目管理”考试题答案 (08级脱产班) 一、填空:(每题2分,10题共20分) 1、人们已经认识到IT项目失败的原因主要有两个,一是由于IT应用项目越来越复杂;二是由于缺乏合格的IT项目管理人才。 2、越来越多的企业引入项目管理,把它作为主要的运作模式和提高企业运作效率的解决方案。 3、自从有了人类,就有了活动,这些活动具有的三个基本特点是目的性、依存性和知识性。 4、IT随着人类的发展,有组织的活动逐步分化为2种类型,它们分别是作业和项目。 5、管理是社会组织中,为了实现预期目标,以人为中心进行的协调活动。这一表述包含了以下五个观点:(1)管理的目的是为了实现预期目标。(2)管理的本质是协调。(3)协调必定产生在社会组织之中。(4)协调的中心是人。(5)协调的方法是多种多样的。 6、P MBOK中核心的知识领域有4个,它们是范围管理、时间管理、成本管理、质量管理。之所以称其为核心知识领域,是因为在这几个方面将形成具体的项目目标。 7、信息技术是以电子计算机和现代通信为主要手段,实现信息的获取、加工、传递和利用等功能的技术总和。 8、组织环境包括自然环境和社会环境,是组织系统所处的环境。 9、范围是指产生项目产品所包括的所有工作及产生这些产品所用的过程。项目范围管理是指对项目包括什么与不包括什么的定义与控制过程。 10、美国着名心理学家詹姆斯指出,一个没有受过激励的人,仅能发挥其能力的20%至30%,而当他受到激励时,其能力可以发挥到80%至90%。

二、选择题:(单选题,请选择最佳答案。每题2分,10题共20分) 1、以下哪一项不是系统方法的内容(B)。 a.系统观念 b.系统测试 c.系统分析 d.系统管理 2、以下哪一项不属于项目管理的辅助知识领域。(A) a.项目质量管理 b.人力资源管理 c.沟通管理 d.风险管理 3、以下哪一项是项目定义阶段中启动过程的一个主要成果。(C) a.获得足够的项目经费 b.编制项目计划 c.选择一位项目经理 d.完成工作分解结构 4、项目成本管理包括的主要过程有(D)。 a.成本估算 b.成本预算 c.成本控制 d.以上都是 5、下列项目管理过程组中,哪一个最耗费时间与资金?(C) a.启动过程 b.计划过程 c.执行过程 d.收尾过程 6、一个由7个人组成的项目组,其沟通渠道的条数是。(B) a.14条 b.21条 c.38条 d.49条 7、项目进行到一半时,客户想取消剩余的工作和合同。最佳的方法是查看下列哪项来确定项目的目的(A) a.项目章程中的目的、目标和商业案例。

最新中考英语一般将来时真题汇编(含答案)

最新中考英语一般将来时真题汇编(含答案) 一、初中英语一般将来时 1.We____ shopping unless it ____ tomorrow. A. will go, will rain B. go, will rain C. will go, rains D. go, rains 【答案】C 【解析】【分析】句意:除非明天下雨,否则我们将会去购物。unless 除非,引导条件状语从句,从句中应该用一般现在时表示将来,主句用一般将来时。故应选C。 【点评】考查动词时态。 2.—Do you know when Mrs. White for dinner this evening? —No, but I think she when she is free. A. will come; will come B. will come; comes C. comes; will come 【答案】 A 【解析】【分析】句意:——你知道怀特太太今晚是否来吃晚饭吗?——不知道。但我认为如果她有空,她会来。空一,句子为含有宾语从句的主从复合句,主句是一般现在时,从句用它所需要的任何时态,根据this evening今晚,可知句子为一般将来时,will come;空二,回答是when引导的时间状语从句,从句是一般现在时,主句应用将来时,will come,故选A。 【点评】此题考查从句的时态。 3.—Excuse me,could you please tell me if the meeting ________ on time? —If it ________ tomorrow,we'll have to put it off. A. will hold; snows B. will be held; snows C. will be held; snow D. holds; will snow 【答案】B 【解析】【分析】句意:—打扰了,请你告诉我会议是否准时举行好吗?—如果明天下雪,我们只好推迟了。第一个if引导的是宾语从句,表示将来会发生的事,用will表将来,hold the sports meeting 举办运动会。所以the sports meeting做主语,应该用被动语态。第二个if引导的是条件状语从句,主句是一般将来时,if从句则用一般现在时。故选B。 【点评】考查动词时态,if引导的条件状语从句使用主将从现。 4.I _________ the shops. Can I get you anything? A. go to B. went to C. have gone to D. am going to 【答案】 D 【解析】【分析】句意:我将去商店,我可以给你买一些东西吗迭项八是一般现在时,表示经常性的行为或状态;选项B是一般过去时,表示动作发生在过去,和现在没有关系;选项C 是现在完成时,表示过去发生的动作对现在造成的影响或结果。根据Can I get you anything?可知,说话的时候,还没有去商店,所以应该用一般将来时。故选:D。

人教版英语英语一般将来时中考真题 含答案百度文库

人教版英语英语一般将来时中考真题含答案百度文库 一、初中英语一般将来时 1.If you want to visit the Palace Museum, I ________ tickets for you tomorrow. A. will book B. booked C. have booked D. was booking 【答案】 A 【解析】【分析】句意:如果你想参观故宫博物馆,我明天给你订票。book,订购,A.一般 将来时;B.一般过去时;C.现在完成时;D.过去进行时。根据tomorrow,可知动词用一般 将来时,故选A。 【点评】考查动词的时态,注意一般将来时的用法。 2.—May I speak to Mr. Smith? —Sorry, he _______ Australia. But he _______ in two days. A. has been to; will come back B. has gone to; will be back C. has been in; would come back D. is leaving for; doesn't come back 【答案】 B 【解析】【分析】考查动词的时态。句意:——我可以和史密斯先生通话吗?——对不 起,他去澳大利亚了。但是两天后回来。have gone to“去某地了(还没回来)”;由时间状 语in two days可确定第二个空用一般将来时,故答案为B项。 3.—Could you tell me_______? —In five minutes, at 10: 25. A. when did the next underground arrive B. when the next underground arrived C. when will the next underground arrive D. when the next underground will arrive 【答案】D 【解析】【分析】句意:—你能告诉我下一个地铁什么时候到吗?—五分钟后,10点25 分。tell后跟宾语从句,宾语从句需用陈述句语序,A、C两项都是疑问句语序,可排除。 根据答语In five minutes,结合句意语境,可知还没有到站,需用一般将来时态,故答案选 D。 【点评】考查宾语从句。根据语境确定宾语从句的时态,注意陈述语序。 4.I don't know if my brother _____________ here tomorrow. If he _____________, I'll call you. A. comes; comes B. will come; comes C. comes; will come D. will come; will come 【答案】 B 【解析】【分析】句意:我不知道是否我哥哥明天将来,如果他来,我将给你打电话。第 一个句子中if意思是是否,tomorrow表明时态是一般将来时,所以用will come;第二个句 子中if 意思是如果,引导条件状语从句,从句用一般现在时,主句用will+动词原形,句子 是从句,所以用一般现在时,主语是he,所以用comes,故选B。

一级建造师项目管理真题及答案解析

1、根据《中华人民共和国招标投标法》及相关法规,对必须招标的项目,招标人行为符合要求的是( )。 A、就同一招标项目向潜在投标人提供有差别的项目信息 B、委托两家招标代理机构,设置两处报名点接受投标人报名 C、以特定行业的业绩、奖项作为加分条件 D、限定或者指定特定的品牌 试题答案:[[B]] 试题解析:考核不合理条件限制、排斥潜在投标人或者投标人,详见教材270页,内容如下: (一)就同一招标项目向潜在投标人或者投标人提供有差别的项目信息;选项A; (二)设定的资格、技术、商务条件与招标项目的具体特点和实际需要不相适应或者与合同履行无关; (三)依法必须进行招标的项目以特定行政区域或者特定行业的业绩、奖项作为加分条件或者中标条件;选项B; (四)对潜在投标人或者投标人采取不同的资格审查或者评标标准; (五)限定或者指定特定的专利、商标、品牌、原产地或者供应商;选项C; (六)依法必须进行招标的项目非法限定潜在投标人或者投标人的所有制形式或者组织形式; (七)以其他不合理条件限制、排斥潜在投标人或者投标人。 2、根据事故造成损失的程度,下列工程质量事故中,属于重大事故的是( )。 A、造成1亿元以上直接经济损失的事故 B、造成1000万元以上5000万元以下直接经济损失的事故 C、造成100万元以上1000万元以下直接经济损失的事故 D、造成5000万元以上1亿元以下直接经济损失的事故

试题答案:[["D"]] 试题解析:考核质量事故按等级分类,详见教材P200,答案选D 3、项目结构信息编码的依据是()。 A、项目管理结构图 B、项目组织结构图 C、项目结构图 D、系统组织结构图 试题答案:[[C]] 试题解析:教材P357,“项目管理组织结构编码,依据项目管理的组织结构图。” 4、根据《建设工程施工劳务分包合同(示范文本)》(GF-2003-0214),应自劳务分包人完成的工作是( )。 A、收集技术资料 B、搭建生括设施 C、编制施工计划 D、加强安全教育 试题答案:[[D]]

项目管理学试题(A卷)

《项目管理学》A卷 一、单项选择题: 1、主要项目管理过程中不包括下列哪项?() A、可行性研究 B、实施 C、计划编制 D、收尾 2、下列表述正确的是() A.项目的生命期是指项目的开始时间和项目的结束时间这一段时间的累计B.不管项目阶段如何划分,一般均可归纳为启动阶段、执行阶段、收尾阶段C.失败的项目也存在收尾阶段D.项目生命期是循环往复的一段时间 3、项目型组织结构适用于()情况。 A.项目的不确定因素较多,同时技术问题一般B.项目的规模小,但是不确定因素较多C.项目的规模大,同时技术创新性强D.项目的工期较短,采用的技术较为复杂 4、项目管理在()组织结构中的角色是兼职的。 A.职能型B.项目型C.强矩阵式D.弱矩阵式 5、在项目团队的发展过程中,在团队的()冲突最大。 A.形成阶段B.震荡阶段C.规范阶段D.辉煌阶段 6、下列表述错误的是()。 A.项目是否具备实施的条件属于项目可行性研究内容之一B.进度安排可行性属于项目可行性研究内容之一C.在进行项目可行性研究时,不必考虑环境对项目的影响D.土地的使用、卫生、安全标准等方面的规章制度也包括在项目可行性研究的内容之中 7、项目计划工作过程应该()。 A.在概念阶段完成时进行B.必须在每项目阶段的相应层次进行C.只有对大项目才是必要的D.可以在执行阶段开始时结束 8、责任分配矩阵确定()。 A.项目团队如何介入项目B.项目团队何时介入项目C.项目团队为什

么介入项目D.项目团队在项目中的责任 9、项目经理可以用()来确保项目团队成员清楚地了解他们所承担的各项任务所包括的工作内容。 A.项目工作范围B.项目章程C.工作分解结构D.风险管理计划 10、项目变更控制的目的是()。 A.阻止项目以外的人们提出变更B.通过项目的变更,有利于项目目标的实现C.防止对被公认的规范的变更D.评估被提议进行的项目变更的结果 11、项目经理并不能确定某个特定的工作包中包含了什么。为了能更好地理解一个工作包中包含了什么,项目经理应该首先查看:() A、进度控制文档 B、账户编码 C、WBS字典 D、风险管理计划 12、一个持续时间为0的活动也叫() A、储备活动 B、虚活动 C、零时差活动 D、监督管理活动 13、在项目生命周期的()阶段颁发项目的许可证书。 A.启动B.计划C.执行D.控制 14、经由项目经理授权的工作()。 A.意味着项目经理不再控制工作B.必须重复上级职能经理的同意C.并没有减轻项目经理对这个工作所负的责任D.它的执行不依赖于其他正在进行的项目工作 15、如果你负责的项目目前的BCWS为100,BCWP为110,这表明该项目目前状态为()。 A.落后于进度计划B.超前于进度计划C.走出预算D.在预算之内 16、挣值是()。 A.已完成工作量的预算成本B.计划工作量的预算费用C.已完成工作的实际费用D.到工作完成时的成本 17、项目范围确认关心的是()。 A.改善项目成本和进度的精确性B.检查项目交给客户前的最后活动C.记录项目产品和服务的特征D.接受而不是纠正项目范围定义的工作结果

中考英语一般将来时知识点题型(1)

必备英语中考英语一般将来时知识点题型 一、初中英语一般将来时 1.If our government attention to controlling food safety now, our health ________ in danger. A. won't pay; is B. doesn't pay; is C. won't pay; will be D. doesn't pay; will be 【答案】 D 【解析】【分析】句意:如果我们的政府现在不注意控制食品安全,我们的健康就会出于危险之中。结合语境可知本句主语描述的是将来某时进行的动作,故用一般将来时态。当主句描述将来时态,条件状语从句中用一般现在时态表示将来动作,结合语境可知选D。【点评】英语中的时态主要是借助于时间状语与上下文语境来进行判断。解答此类题型,首先要注意句子中的时间状语,如果没有则要通过分析上下文,结合语境来判断句子的时态。英语疑问句中一般具有时态上的对应关系,注意结合这一特点进行区分。英语状语从句的时态与主句有比较紧密的联系,若主句为一般将来时,时间和条件状语从句通常要用一般现在时表示将来,而不能直接使用将来时态。 2.If it is clear tomorrow , I ________a bike to the underground station. A. ride B. will ride C. rode D. have ridden 【答案】 B 【解析】【分析】句意:如果明天天气好的话,我会骑自行车去地铁站。ride骑车,动词原形;will ride是一般将来时态;rode是ride的过去式形式;have ridden是现在完成时态。句中if引导的是条件状语从句,从句中一般现在时态,主句应使用一般将来时态,故应选B。 【点评】考查动词的时态,以及if引导的是条件状语从句,从句中一般现在时态,主句应使用一般将来时态。 3.— I hear your father has gone to Tokyo on business? — Yes. And he _______ in three weeks. A. has returned B. will return C. would return D. returns 【答案】 B 【解析】【分析】句意:—我听说你父亲出差去日本了?—是的。他将在三周后回来。时间状语in three weeks与一般将来时连用,故选B。 4.Susan and her sister ________ some photos in the park the day after tomorrow. A. take B. took C. will take 【答案】 C 【解析】【分析】句意:Susan和她的妹妹后天会在公园照一些照片。根据时间状语the

(完整版)英语中考语法真题专练之一般将来时(最新整理)

一般将来时 【2011 河北省】1. My sister wants a new dress. She it to the party, A. wears B. has worn C. wore D. is going to wear 【2011 四川达州】2.—I don’t know if Aunt Li these “stay-home children tomorrow morning. — If I her, I would come earlier. A. will come to take care of; am B. come to look after; were C. will come to take care of; were D. comes to come up with; am 【2011广西梧州】3. – I don’t know if Mr. Li to the party this evening. -- I think he will come if he free. A. will come; is B. will come; will be C. comes; is D. comes; will be 【2011 ft东临沂】4. Chen Guangbiao says he all his money to charities when he dies. A. leaves B. left C. will leave D. would leave 【2011 ft东威海】5.—Mom, when can I go out to play football? —Finish your homework first, or I let you go out. A. don't B. didn't C. won't D. haven't 【2011 江苏宿迁】6. If there is any change to the plan, I you as soon as possible. A. told B. have told C. tell D. will tell 【2011 贵州安顺】7. —Look at the noisy kids! —Haven’t you heard the saying “When the cat is away, the mice ?” A. play B. played C. are playing D. will p lay 【2011 上海】8. We are glad to hear that the Greens to a new flat next week. A. move B. moved C. will move D. have moved 【2011广西玉林】9. Can I take Lisa to the aquarium tomorrow? If she there, she a good time. A. goes; has B. will go; has C. will go; will have D. goes; will have 【2011?江苏扬州】10.—When you reading Jane Eyre? —It’s hard to say. I’m busy recently. A. did; finish B. have; finished C. will; finish D. do; finish 【2011 贵州安顺】11. Put your hands behind your back. Don’t speak. We’ll in ten minutes. A. back B. be back C. are back D. are back to you 【2011?贵州铜仁】12. If it this Saturday, we for a picnic. A. won’t rain; shall go B. doesn’t rain; will go C. isn’t rain; go D. doesn’t rain; go 第 1 页共1 页

相关文档
相关文档 最新文档