STANDARD OPERATION SHEET - STATIC

JOB NAME

Date: January 10, 2006Upper left hand door assembly GMX-245

Written By:

Dan Cerovec

Element Time

11-ULH Pre-Assemble Switch Bezel 143WORK FLOW DIAGRAM

2Get Upper Door from rack

53

3Inspect , Install LEDs and place in fixture 154Fasten Switch Bezel to Upper 135Install 4 Clips

156Mark and Trim Assembly 177Install Belt Molding

142

8

Place finished upper door on WIP rack

5

5

Totals

9813

Takt Time 159Total Cycle Time

Actual Takt Time

143

% of Mix

Weighted Totals

PPE - Personal Protective

Gets a pick list from Verification Station every HOUR

Equipment:

Signature Block - All Shifts

Kavlar Gloves

Safety Glasses

Mo / Yr

Initials What change

Initials Added a fourth clip

March 15, 2004Added a New Molding type

November 15, 2005

Group / Team GMX-245 Door Assembly Team

Address: LEFT Hand DOOR Station #1

Revision Log

Confirmation from other shift(s)

S Y M B O L

S E Q #

JES Register Number

Element Name

111

Date

Symbols

Work Walk

Legend

Walking

Safety for Operator

Critical Team Leader Group Leader R ED =OJO-

Date

Date Date In Process Return Walk

seconds

Cycle Time Chart

Time

Option

or

Model

seconds seconds Other Activities

Mandatory

Quality B e l t M o l d i n g

T o r q u e G u n

S t a p l e s G u n

Retainer

Pall -Nuts

Lock Switch

Memory Switch

Staples

LED Assembly

Sub-Assembly Area

W I P C o m p l e t e d A s s e m b l y R a c k

10 p c s M a x

Belt Molding

Rejects

Non Bose / No memory Unassembled Switch Bezel

Pre-Assembled Bose / Memory

Switch Bezel

Speaker Grille

Memory Seat Switch

1st Level 3rd Level

4th Level

2nd Level Switch Bezels

Switch Bezels 9 pcs Max 9 pcs Max

2

Trash

13

4

58

C

UPPER DOOR

6Shift Days

Aft.

20042005

M. Smith P B. Jones S.

B. J.S. A.P Mc.M. S.7