文档库 最新最全的文档下载
当前位置:文档库 › Crane Safety

Crane Safety

Crane  Safety
Crane  Safety

附录

Crane Safety

Many types of cranes, hoists, and rigging devices are used at [COMPANY] for lifting and moving materials. [COMPANY]'s policy is to maintain a safe workplace for its employees;therefore, it cannot overemphasized that only qualified and licensed individuals shall operate these devices. The safety rules and guidance in this chapter apply to all operations at[COMPANY] that involve the use of cranes and hoists installed in or attached to buildings and to all [COMPANY] employees, supplemental labor, and subcontractor personnel who use such devices Responsibilities

Supervisors are responsible for:

? Ensuring that employees under their supervision receive the required training and are certified and licensed to operate the cranes and hoists in their areas.

? Evaluating crane and hoist trainees using the Crane Safety Checklist and submitting the Qualification Request Form to the Safety Office to obtain the operator's license.

? Ensuring that hoisting equipment is inspected and tested monthly by a responsible individual and that rigging equipment is inspected annually.

Crane and Hoist Operators are responsible for:

? Operating hoisting equipment safely.

? Selecting and using rigging equipment appropriately.

? Having a valid operator's license on their person while operating cranes or hoists.

? Participating in the medical certification program, as required.

Engineering/Maintenance/Operations Department is responsible for:

? Performing annual maintenance and inspection of all [COMPANY] cranes and hoists that are not covered by a program with maintenance responsibility.

? Conducting periodic and special load tests of cranes and hoists.

? Maintaining written records of inspections and tests, and providing copies of all inspections and test results to facility managers and building coordinators who have cranes and hoists on file.

?Inspecting and load testing cranes and hoists following modification or extensive repairs (e.g., a replaced cable or hook, or structural modification.)

? Maintaining all manuals for cranes and hoists in a central file for reference Safety Department is responsible for

? Conducting training for all Crane & Hoist Operators

? Issuing licenses to Crane and Hoist Operators

? Periodically verifying monthly test and inspection reports.

? Interpreting crane and hoist safety rules and standards.

Safe Operating Requirements

All workers who use any [COMPANY] crane or hoist shall have an operator's license. The company issues licenses for authorized employees who have been

specifically trained in crane and hoist operations and equipment safety.

Crane and Hoist Safety Design Requirements

Following are the design requirements for cranes and hoists and their components:

? All crane and hoist hooks shall have safety latches.

? Hooks shall not be painted (or re-painted) if the paint previously applied by the manufacturer is worn.

? Crane pendants shall have an electrical disconnect switch or button to open the main-line control circuit.

? Crane bridges and hoist monorails shall be labeled on both sides with the maximum capacity.

? Each hoist-hook block shall be labeled with the maximum hook capacity. ? A device such as an upper-limit switch or slip clutch shall be installed on all building cranes and hoists. A lower-limit switch may be required when there is insufficient hoist rope on the drum to reach the lowest point.

? All cab and remotely operated bridge cranes shall have a motion alarm to signal bridge movement.

? If an overload device is installed, a load test to the adjusted setting is required. General Safety Rules

Operators shall comply with the following rules while operating the cranes and hoists:

? Do not engage in any practice that will divert your attention while operating the crane.

? Check that all controls are in the OFF position before closing the main-line disconnect switch.

Operation Rules

Pre-operational Test

At the start of each work shift, operators shall do the following steps before making lifts with any crane or hoist:

1.Test the upper-limit switch. Slowly raise the unloaded hook block until the

limit switch trips.

2.Visually inspect the hook, load lines, trolley, and bridge as much as possible

from the operator's station; in most instances, this will be the floor of the building.

3.If provided, test the lower-limit switch.

4.Test all direction and speed controls for both bridge and trolley travel.

5.Test the pendant emergency stop.

6.Test the hoist brake to verify there is no drift without a load.

7. If provided, test the bridge movement alarm.

起重机安全

在企业里有许多种起重机,升降机,以及船的缆索装配被用来举起和移动物料,企业的职责是为他的员工们提供一个安全的工作环境,因此不能过分的强调质量,以下部分中的安全规则和指导适合企业中的所有操作,包括各种架设或固定在建筑物上的起重机和升降机。

职责

管理人的职责:

?在他们的管理下,确保员工都能接受必要的训练,且员工必须出示他们被允许操作起重机的相关证明。

?运用起重机安全手册对起重机学员进行考核,并且学员向安全部门递交资格申请表以获得操作许可证。

?确保每个月都能进行一次起重机的检查和测试,每年进行一次钢丝绳的检查。

起重机操作人员的职责

?安全的操作起重机设备;

?正确的挑选和使用钢丝绳;

?在操作起重机时必须持有效许可证;

?按照要求参加医疗认证计划项目。

工程维护部门的职责

?对未包含在项目中的起重机实施年度维护和检查的职责;

?对起重机进行定期的,特殊的载重测试;

?保存检查和测试的书面记录,并向持有起重机设备经理和制造商提供所有检查测试结果的记录副本;

?对起重机进行检查和载重测试并随后进行修改或全面的修理。

安全部门的职责

?对所有起重机操作者进行培训;

?为起重机的操作者发放上岗许可证;

?周期性的进行月测试并写检查报告;

?制定起重机安全法制和标准。

安全操作要求

所有操作起重机的工作人员必须有一个操作许可证,对于那些已接受过起重机操作和设备安全方面的特殊培训并被认可的员工,由公司为其发放证书。

起重机安全要求

?所有的起重机吊钩必须有一个安全弹簧锁;

?不能在吊钩上有腐蚀性的涂料;

?起重机起升装置上安有起升高度限制器或能够启动主控制电路的按钮;

?双梁或单梁起重机的主梁两边必须标记其最大承载能力;

?每一个起重机吊钩都的标记其最大承吊能力;

?所有的司机室都应该有一个运动传感器来显示起重机的运行状况;

?如果要安装一个超载的装置,必须做一个载荷测试,确保装置的正确运行。

一般的安全规则

当操作起重机时,操作者必须遵守以下规则

?操作时注意力要集中;

?在闭合主开关之前,检查所有其他开关确保其打在off的位置。

操作规则

操作前的检查

在用起重机提升货物之前,操作者需按以下步骤进行操作

1.检查起升高度限位开关;

2.尽可能的从操作者的位置直观的对吊钩,起升货物,起升小车,梁进行检查,在生活

中,这就好比是一幢楼的地基;

3.条件允许的话,检查低电位开关;

4.检查起重机大车和小车的运行方向和速度控制器;

5.检查起升装置的应急停止情况;

6.检查起重机的制动装置确保没有堆积物;

7.允许的话,检查起重机运转的报警器。

简单吊车租赁合同协议书

简单吊车租赁合同协议书 吊车租赁合同协议书参考 承租方(甲方):_________ 出租方(乙方):_________ 兹有甲方因施工需要租用乙方吊车,为明确责任和义务,经双方友好协商,特立本合同,共同遵守执行。 一、吊车类型及数量:_________;施工地点:_________;施工内容:_________;使用时间:_________年_________月_________日至_________年_________月_________日。 二、租赁金和付款方式: 出租金:_________;合同总价:_________元整。 1、吨吊车工作台班单价_________元/台班,闲置台班单价_________元/台班; 2、每日以一个台班起算; 3、每个台班为8小时,以驾驶员进出场时间为准。超过部分租金=累计超过作业时间/8小时 _____台班费。(以外出施工记录表为准) 4、吊车进场及退场经协商由按吊车的台班 _____2=台班支付费用。 5、对于价值超过_________元设备的吊装,吊车台班单价 _________元。

6、付款方式:在合同签订后一次付清,或乙方吊车到现场时,预付人民币_________元,余款在吊车退场前结清。 三、安全责任: 1、施工时应严格按照安全技术操作规程执行。甲乙双方均有权阻止对方的违章操作、违章指挥,坚持实施吊车作业_________原则。甲方需配备合格的起重指挥,现场的安全管理由甲方负责。 2、由于对施工场地地面和地下设施情况申报不清而造成的事故,其责任和损失由甲方负责。 3、吊装作业前,负责向乙方吊车司机进行交底。严禁干超出作业方案以外的工程,指派专人指挥作业,双方统一信号确保作业,施工过程中若发生野蛮作业,乙方吊车机组人员有权拒绝作业。由于指挥失误或因安全措施未落实而造成的事故,其责任和损失由甲方负责。 4、施工中若发生安全事故时,责任划分原则为;吊钩以上属于吊车机械设备由乙方负责;吊钩以下(钢丝绳、吊耳、卸扣、捆扎、指挥等原因)由甲方负责。 四、甲方的权利和义务 1、必须确保这次施工_________个台班,若实际台班超过 _________个,按实际发生结算。 2、在出租期间内对出租吊车具有使用权,但无所有权。不得转让、转租、变卖或抵押乙方的设备,不得擅自转移作业地点,

轮胎式起重机(汽车式起重机)操作规程简易版

The Daily Operation Mode, It Includes All The Implementation Items, And Acts To Regulate Individual Actions, Regulate Or Limit All Their Behaviors, And Finally Simplify Management Process. 编订:XXXXXXXX 20XX年XX月XX日 轮胎式起重机(汽车式起重机)操作规程简易版

轮胎式起重机(汽车式起重机)操作 规程简易版 温馨提示:本操作规程文件应用在日常的规则或运作模式中,包含所有的执行事项,并作用于规范个体行动,规范或限制其所有行为,最终实现简化管理过程,提高管理效率。文档下载完成后可以直接编辑,请根据自己的需求进行套用。 1.起重机的启动参照有关内燃机的规定执 行。 2.起重机在公路或城市道路上行驶时,应 执行交通管理部门的有关规定。 3.起重机作业前的注意事项 (1)检查各安全保护装置和指示仪表应齐 全。 (2)燃油、润滑油、液压油及冷却水应添加 充足。 (3)开动油泵前,先使发动机低速运转一段 时间。

(4)检查钢丝绳及连接部位应符合规定。 (5)检查液压系统压力是否正常。 (6)检查轮胎气压及各连接件应无松动。 (7)调节支腿,务必按规定顺序打好完全伸出的支腿,使起重机呈水平状态,调整机体使回转支承面的倾斜度在无载荷时不大于 1/1000(水准泡居中)。 (8)充分检查工作地点的地面条件,工作地点地面必须具备能将起重机呈水平状态,并能充分承受作用于支腿的力矩的条件。 (9)注意地基是否松软,如较松软,必须给支腿垫好能承载的木板或木块。 (10)支腿不应靠近地基挖方地段。 (11)应预先进行调查地下埋设物,在埋设物附近放置安全标牌,以引起注意。

简易吊车设计说明书

毕业设计(论文)题目:简易吊车设计 系别航空与机械工程系 专业名称机械设计制造及其自动化 班级学号108102307 学生段盼光 指导教师吴晖 二O一四年五月

毕业设计(论文)任务书 I 、毕业设计(论文)题目: 简易吊车设计 II 、毕 业设计(论文)使用的原始资料(数据)及设计技术要求: 设计一移动式简易吊车,要求提升的最大重量为G=750公斤,提升的线速 度为s m v /46.00=,提升的最大高度为,5.2m H =适用于机械加工车间小围 的起重和搬运。 I I I 、毕 业设计(论文)工作容及完成时间: 1. 收集资料、外文资料翻译、开题报告 第1周—第2周 2. 总体方案的确定 第3周—第4周 3. 参数确定及设计计算 第5周—第7周 4. 简易吊车装配图设计及零部件图设计 第8周—第15周 5. 撰写毕业设计论文 第16周—第17周

Ⅳ、主要参考资料: [1] 璞良贵,纪名刚主编.机械设计.第七版.:高等教育,2001 [2] 桓,作模主编.机械原理.第六版.:高等教育,2002 [3] 成大先主编.机械设计手册.:化学工业,2004 [4] 学田主编.机械设计自学入门.:冶金工业,1982 [5] Ye Zhonghe, Lan Zhaohui. Mechanisms and Machine Theory. Higher Education 航空与机械工程系机械设计及其自动化专业类1081023班 学生: 填写日期:2014 年2月15日 指导教师: 助理指导教师(并指出所负责的部分):

航空与机械工程系系主任(签名): 附注:任务书应该附在已完成的毕业设计说明书首页。 学士学位论文原创性声明 本人声明,所呈交的论文是本人在导师的指导下独立完成的研究成果。除了文中特别加以标注引用的容外,本论文不包含法律意义上已属于他人的任何形式的研究成果,也不包含本人已用于其他学位申请的论文或成果。对本文的研究作出重要贡献的个人和集体,均已在文中以明确方式表明。本人完全意识到本声明的法律后果由本人承担。 作者签名:日期:

英文版报价单模板Quotation

Tel :+86 (0512) xxxxxxxx Fax :+86 (0512) xxxxxxxx LOGO Factory address :No.116.xxxxx Road, xxxx district , xxxxx , China . QUOTATION Quotation number: 201902XXQXXX To: Xxx xxxx From: Xx xxxx Company: XXXX Tel 1762678xxxx Tel E-Mail xxxx.xx@https://www.wendangku.net/doc/b612550733.html, E-Mail xxxx.xxxx@https://www.wendangku.net/doc/b612550733.html, Fax: 6618xxxx Fax: xxxxxxx Date: 201902xx Quotation: Customer :XXX Currency :RMB Customer Code :1608 TAX :16% NO Description Unit Qty Unit Price Amount Remark 1 12315527 61604 19210313 FILTER ELEMENT Set 2 280 560 (No Tax) Deliverv 10-12 weeks 2 TAX 16% 合计人民币陆佰肆拾玖圆陆角(含16%税金) 649.6 (Including 16% tax) Deliverv 10-12 weeks Terms: 30% in advance (T/T), 65% before shipment (T/T), 5% for 1year warranty. Note: 1. Pricing: Good for 30 days. 2. Spare parts beyond contract need extra charge.

简易吊车租赁协议

编号:_______________ 本资料为word版本,可以直接编辑和打印,感谢您的下载 简易吊车租赁协议 甲方:___________________ 乙方:___________________ 日期:___________________

承租方:(简称甲方) 出租方:(简称乙方) 根据双方共同协商,同意租用吊车,配合甲方吊装,具体内容磋商如下: 一、施工机械名称吨吊车,数量:台。 二、施工内容和地点:. 三、租赁时间从________年____月____日至________年____月____日。 四、甲方同意支付乙方设备进出场费用元整。 五、税后计收费标准元/月,没有满月按元/天计算,租用费用按月付款,租赁时间每满一个月时,承租方在三天内汇入出租方指定帐户。甲方退场当天结清所有月租金,如未结清乙方有权不退场,并按月租价的2%收取每天的滞纳金,结帐时乙方不提供正式发票。 1、乙方机组人员在甲方施工期间,住宿就餐等生活问题由甲方负责; 2、乙方机组在施工期间所用燃油料,由甲方负责; 3、乙方机械在施工行驶过程中所发生的过路、过桥费由甲方负责。 六、施工现场的场地条件、吊装条件及吊具均由甲方负责。如需夜间施工,甲方必须做好充足的照明工作。乙方机械进场后,如因上述问题不能起吊,由此造成的损失由甲方负责。 七、严格执行安全操作规程,不能违章作业,严禁超负荷起吊。乙方机械进场后,甲方须负责每天工作之余该吊车的保卫工作,以免发生机械意外,如因甲方原因造成乙方机械损坏或丢失(包括车上零部件),甲方要负责赔偿。 八、甲方在吊装中,必须指派具有起重指挥资质的起重工指挥,并在施工前做好安全技术交底工作,统一指挥信号,确保施工安全。如因甲方在吊装指挥中的失误造成的损失由甲方负责,坚持做到“十不吊”即: 1、超过额定负荷不吊。 2、指挥信号不明,重量不明不吊。 3、吊索和附件捆绑不牢,不符合安全要求不吊。

最新吊车包月租赁合同简易(共10篇)

吊车包月租赁合同简易(共10篇)

吊车包月租赁合同简易(共10篇) 篇一:吊车包月租赁合同 设备租赁合同 承租方(甲方):出租方(乙方): 甲乙双方经协商,就甲方向乙方承租设备事宜签订以下合同,共同遵守执行。 一、租赁设备的名称、规格型号 设备名称:汽车吊规格型号: 台数:出厂日期: 二、设备使用地点、工程项目名称及设备进场时间本租赁设备使用地点:凤阳中都水泥厂;工程项目名称:;设备进场时间:随叫随到,不固定时间。 三、租赁期限: 根据甲方需要,随叫随到,不固定期限。 四、租赁费标准及结算方式 1、租用吊车为包月制,租金按月计费/月(不含税金)。不足一个月的按实际产生的天数/30天乘20000元计算。包月最低期限为一个月。 五、租赁相关费用的约定 2、设备租赁时间自设备进场正式使用起计算。

3、吊车燃油费以及乙方操作人员的吃饭和住宿由保养维修相关费用由乙方承担。 4、方为该设备配备司机、起重工。 5、采用按月结算方式设备,当月由甲方现场负责人签单,不足一个月的按实际产生的时间按台班计算。另甲方在工程结束后五日内应结清乙方所有的租赁费。 六、甲方责任 1、不得强迫乙方司机违反设备安全操作规程作业,保证设备有正常的维修保养时间。 2、不得将乙方设备转租、抵押及变卖,未经乙方同意不得在设备上增加、拆除任何部件或变更施工地点,施工地点为(中都水泥总厂)。 七、乙方责任 1、保证设备技术状况良好,做到设备正常运行,保证设备在租赁期间能正常投入使用。车辆每月维修期限为两天,维修时间可以尊重甲方的意见,乙方应已不影响甲方现场施工进度为主,合理安排修理时间。 2、乙方司机应按设备操作规程持证操作,服从甲方施工管理人员的调度与指挥, 并保证遵守法律法规和甲方施工现场的规章制度。

完整报价单模板(文字版)

完整的外贸报价单模板 一、报价单的头部 01,卖家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 02,买家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 03,报价单的抬头: 报价单标题(Quotation/Quotation Form/Price List)参考编号(Reference No.) 报价日期(Date) 有效日期(Valid date) 二、产品基本资料(Product’s Basic information) 序号(No.) 货号(Item No.) 型号(Type) 产品名称(Product’s Name) 产品图片(Photo) 产品描述(Description) 原材料(Materials) 规格(Specification)

简单吊车租赁合同协议书简易版

It Is Necessary To Clarify The Rights And Obligations Of The Parties, To Restrict Parties, And To Supervise Both Parties To Keep Their Promises And To Restrain The Act Of Reckless Repentance. 编订:XXXXXXXX 20XX年XX月XX日 简单吊车租赁合同协议书 简易版

简单吊车租赁合同协议书简易版 温馨提示:本协议文件应用在明确协议各方的权利与义务、并具有约束力和可作为凭证,且对当事人双方或者多方都有约制性,能实现监督双方信守诺言、约束轻率反悔的行为。文档下载完成后可以直接编辑,请根据自己的需求进行套用。 吊车租赁合同协议书参考 承租方(甲方):_____ 出租方(乙方):_____ 兹有甲方因施工需要租用乙方吊车,为明确责任和义务,经双方友好协商,特立本合同,共同遵守执行。 一、吊车类型及数量:_____;施工地 点:_____;施工内容:_____;使用时间:_____年_____月_____日至_____年_____月_____日。 二、租赁金和付款方式: 出租金:_____;合同总价:_____元整。 1、吨吊车工作台班单价_____元/台班,闲

置台班单价_____元/台班; 2、每日以一个台班起算; 3、每个台班为8小时,以驾驶员进出场时间为准。超过部分租金=累计超过作业时间/8小时×台班费。(以外出施工记录表为准) 4、吊车进场及退场经协商由按吊车的台班×2=台班支付费用。 5、对于价值超过_____元设备的吊装,吊车台班单价_____元。 6、付款方式:在合同签订后一次付清,或乙方吊车到现场时,预付人民币_____元,余款在吊车退场前结清。 三、安全责任: 1、施工时应严格按照安全技术操作规程执行。甲乙双方均有权阻止对方的违章操作、违

简单吊车租赁合同协议书正式版

The cooperation clause formulated through joint consultation regulates the behavior of the parties to the contract, has legal effect and is protected by the state. 简单吊车租赁合同协议书 正式版

简单吊车租赁合同协议书正式版 下载提示:此协议资料适用于经过共同协商而制定的合作条款,对应条款规范合同当事人的行为,并具有法律效力,受到国家的保护。如果有一方违反合同,或者其他人非法干预合同的履行,则要承担法律责任。文档可以直接使用,也可根据实际需要修订后使用。 吊车租赁合同协议书参考 承租方(甲方):_____ 出租方(乙方):_____ 兹有甲方因施工需要租用乙方吊车,为明确责任和义务,经双方友好协商,特立本合同,共同遵守执行。 一、吊车类型及数量:_____;施工地点:_____;施工内容:_____;使用时 间:_____年_____月_____日至_____年 _____月_____日。 二、租赁金和付款方式: 出租金:_____;合同总价:_____元整。

1、吨吊车工作台班单价_____元/台班,闲置台班单价_____元/台班; 2、每日以一个台班起算; 3、每个台班为8小时,以驾驶员进出场时间为准。超过部分租金=累计超过作业时间/8小时×台班费。(以外出施工记录表为准) 4、吊车进场及退场经协商由按吊车的台班×2=台班支付费用。 5、对于价值超过_____元设备的吊装,吊车台班单价_____元。 6、付款方式:在合同签订后一次付清,或乙方吊车到现场时,预付人民币 _____元,余款在吊车退场前结清。 三、安全责任:

简易吊车回转部分设计

毕业设计(论文) 设计(论文)题目:简易吊车设计 回转部分设计 学院名称:机械工程学院 专业:机械设计制造及自动化 班级: 姓名: 指导教师: 定稿日期:2013年04月30 日

摘要 本课题的目的就是设计一简易吊车来代替人力实现重物的搬运。该吊车的工作原理是:由电动机经带轮传动和一对开式齿轮传动,将运动和动力传给卷筒,再通过钢丝绳和滑轮组来提升重物。通过任务书中的条件参数,设计计算相关的数据,选择钢丝绳的种类和型号,进而计算出卷筒和滑轮的直径,确定一些其他的标准零部件。在此基础上进行传动装置的设计和计算,完成其进行结构设计,工作主要包括完成了轴的设计、确定了带轮的结构、齿轮的结构、卷筒的结构、滑轮的结构、伸臂杆和支撑杆的结构,绘制了吊车的总装配图、制动轮装置和卷筒装置的结构图,完成部分零件工作图的设计。 关键词:简易吊车;设计计算;结构设计

目录 1 引言…………………………………………………………………………………………错误!未定 义书签。 1.1 吊车的历史……………………………………………………………………………错误!未定 义书签。 1.2 吊车国内外的研究现状……………………………………………………………………错误! 未定义书签。 1.3 吊车的发展趋势 (2) 2 回转部分设计方案 (4) 3 回转部分主要零件分析计算 (5) 3.1 电动机的功率及轴承的选择与计算 (5) 3.1.1 初选圆锥滚子轴承的型号 (5) 3.1.2 回转部分受力分析 (5) 3.1.3 计算径向力Fr、轴向力Fa (5) 3.2 输入轴及轴上零件的设计计算 (6) 3.2.1 输入轴的设计 (6) 3.2.2 输入轴中各轴上零件的设计 (8) 3.2.3 输入轴上键的确定 (1) 错误!未定义书签。 3.3 输出轴及轴上零件的设计计算 (14) 3.3.1 输出轴的设计 (14) 3.3.2 输出轴中各轴上零件的设计 (15) 3.2.3 输出轴上键的确定 (17) 结论 (18) 致谢 (19) 参考文献 (20)

完整的报价单范文

一、报价单的头部(Head) 01,卖家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 02,买家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 03,报价单的抬头: 报价单标题(Quotation/Quotation Form/Price List) 参考编号(Reference No.) 报价日期(Date) 有效日期(V alid date) 二、产品基本资料(Product’s Basic information) 序号(No.) 货号(Item No.) 型号(Type) 产品名称(Product’s Name) 产品图片(Photo) 产品描述(Description) 原材料(Materials) 规格(Specification)

简单吊车租赁合同协议书

简单吊车租赁合同协议书 吊车,是工地工程开展的好帮手,今天小编就给大家来看看汽车租赁合同,欢迎大家来多多参考一下哦 吊车租赁合同协议书参考 承租方(甲方):_________ 出租方(乙方):_________ 兹有甲方因施工需要租用乙方吊车,为明确责任和义务,经双方友好协商,特立本合同,共同遵守执行。 一、吊车类型及数量:_________;施工地点:_________;施工内容:_________;使用时间:_________年_________月_________日至_________年_________月_________日。 二、租赁金和付款方式: 出租金:_________;合同总价:_________元整。 1、吨吊车工作台班单价_________元/台班,闲置台班单价_________元/台班; 2、每日以一个台班起算; 3、每个台班为8小时,以驾驶员进出场时间为准。超过部分租金=累计超过作业时间/8小时台班费。(以外出施工记录表为准) 4、吊车进场及退场经协商由按吊车的台班2=台班支付费用。 5、对于价值超过_________元设备的吊装,吊车台班单价_________

元。 6、付款方式:在合同签订后一次付清,或乙方吊车到现场时,预付人民币_________元,余款在吊车退场前结清。 三、安全责任: 1、施工时应严格按照安全技术操作规程执行。甲乙双方均有权阻止对方的违章操作、违章指挥,坚持实施吊车作业_________原则。甲方需配备合格的起重指挥,现场的安全管理由甲方负责。 2、由于对施工场地地面和地下设施情况申报不清而造成的事故,其责任和损失由甲方负责。 3、吊装作业前,负责向乙方吊车司机进行交底。严禁干超出作业方案以外的工程,指派专人指挥作业,双方统一信号确保作业,施工过程中若发生野蛮作业,乙方吊车机组人员有权拒绝作业。由于指挥失误或因安全措施未落实而造成的事故,其责任和损失由甲方负责。 4、施工中若发生安全事故时,责任划分原则为;吊钩以上属于吊车机械设备由乙方负责;吊钩以下(钢丝绳、吊耳、卸扣、捆扎、指挥等原因)由甲方负责。 四、甲方的权利和义务 1、必须确保这次施工_________个台班,若实际台班超过_________个,按实际发生结算。 2、在出租期间内对出租吊车具有使用权,但无所有权。不得转让、转租、变卖或抵押乙方的设备,不得擅自转移作业地点,不得自行操作乙方吊车,如果因此发生事故或造成损失由承担全部责任。

完整的外贸报价单模板

完整的外贸报价单 一、报价单的头部 01,卖家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 02,买家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 03,报价单的抬头: 报价单标题(Quotation/Quotation Form/Price List) 参考编号(Reference No.) 报价日期(Date) 有效日期(Valid date) 二、产品基本资料(Product’s Basic information) 序号(No.) 货号(Item No.) 型号(Type) 产品名称(Product’s Name) 产品图片(Photo) 产品描述(Description) 原材料(Materials)

汽车吊安全协议简易版

汽车起重机进场安全协议 甲方:中国中铁电气化局有限公司西安地铁一号线TJSG-9标项目经理部(以下简称甲方) 乙方: 为了贯彻“安全第一,预防为主,综合治理”的方针,进一步明确在朝阳门地铁站16T汽车吊使用过程中甲乙双方的安全责任,确保汽车起重机在使用过程中的施工及人员安全,防止意外事故的发生,依照国家、西安市及西安市地铁的有关法律、法规、政策和规定,经甲乙双方协商,达成以下协议: 一、乙方进场前必须向甲方上报本汽车吊相关安全合格证书及操作人员证件(吊车司机操作证),且上报合格证书及操作人员证件必须符合国家有关规定。 二、乙方在施工过程中,必须针对本汽车起重机操作特点落实相应的安全措施,乙方操作人员必须经过甲方安全技术交底和安全教育,并在安全技术交底和安全教育记录上签字,留甲方备案。 三、乙方在施工中要认真执行起重作业安全操作规程、起重作业“十不吊”原则,并严格遵守本项目部的机械管理制度,甲方将严格按照上述各项制度及有关标准作为施工过程中安全检查的依据。 四、乙方操作机械人员进场后必须服从甲方的统一管理,遵守甲方施工现场的安全管理制度,保证施工安全。如不遵守甲方的管理制度,甲方有权对乙方人员进行经济处罚。 五、如乙方提供的机械设备不合格,或特殊工种操作人员无证

操作,甲方有权根据现场实际情况要求乙方对机械设备或施工人员进行更换或将乙方清退出场,由此而给甲方造成的损失由乙方承担。 六、乙方施工必须为施工人员提供必须的安全防护用品,加强施工中的劳动保护。 七、乙方必须保证机械设备性能良好,各安全装置齐全有效、动作灵敏(如钢丝绳、卡环、限位等)等,并及时做好机械日常保养维修记录,每月25日之前交甲方物资设备部备案。对于乙方未及时检查(机械设备带病运转)或在甲方检查提出问题未及时整改而造成的事故,乙方要负完全责任。 八、本协议未尽事宜,依据有关法律、法规、规章处理,规章中没有明确的,经甲乙双方协商处理解决。 甲方(章):乙方(章): 法定代理人:法定代理人: 委托代理人:委托代理人: 年月日年月日

吊车租赁合同(简约版)

编号:_____________ 吊车租赁合同 承租方:_______________________ 出租方:_______________________ 签订日期:____ 年 ___ 月____ 日

承租方(甲方): 岀租方(乙方): 因甲方工程施工需要,向乙方租赁吊车_________ ,根据《中华人民共和国合同法》和《租赁法》及 相关规定,为维护双方合法权益和明确双方责任和义务,经双方协商,达成以下意见,特订立本 合同,以便双方共同遵守执行。 一、工程地点: _____________ 工程施工现场(具体作业地点根据甲方实际施工需要安排) 二、吊车型号和租赁期限: 1、型吨吊车______ 台,车牌号:; 2、租赁时间:从年月日开始,退场日期以甲方通知的退场日期为准。 三、租金费用计算与支付方式: 1、吊车租金以月租计算,每个月租金为(人民币):______ 元(大写: ____________ 整)(不含税) (如甲方要求提供有效增值税发票的,乙方按要求自行办理岀具与结算支付等额的有效增值税发 票,费用按实际发生税额计算,甲方另行支付给乙方)。 2、吊车到达甲方工地经甲方验收合格开始施工任务之日起计租赁租金,至次月当日为上月租金结算日(以此类推),到甲方通知退场停工当日为合同租金结算截止日。 3、租金按甲方结算管理规定每月________ 日办理一次结算,结算表经甲方审批手续完成后,— 个工作日内支付当期租金。 4、在乙方接到甲方要求吊车退场通知后办理最终退场结算,结算表经甲方审批手续完成后,______ 个工作日内支付租金。 5、吊车每月工作时间标准为_____ 小时,如因甲方原因造成工作时间不足_______ 小时的,甲方按月 租金结算给乙方。 7、进退费用: 设备由进场到甲方通知退场当日时间计算满叁个月的,进退场费用由乙方全部承担,如不足叁个 月的费用由甲方负责。 8、每月吊车正常维修、保养时间限定_________ 天,三天内保养时间甲方不扣除租金,超岀叁天以上的按(月租费+ 30天)每天计算扣除租金给甲方。 四、甲方职责和权利: 1、甲方免费提供乙方作业人员食宿(一车一人),免费提供机械用主油(0#柴油),其它副油及

可拆装式小吊车设计

可拆装式小吊车前言 第一章工作机构的设计 1.1钢丝绳的选择 1.2卷筒和滑轮直径的选取 第二章传动装置的设计和计算 2.1卷筒功率和转速的计算 2.2电动机和制动器的选取 2.3传动机构的设计和计算 第三章结构设计 3.1带轮的结构设计 3.2齿轮的结构设计 3.3卷筒的结构设计 3.4滑轮的结构设计 3.5支架的结构设计 第四章轴的设计和计算 4.1小齿轮轴的设计 4.2卷筒轴的设计 第五章支架的设计 第六章吊车的稳定性问题 结论 致谢

参考文献 1 前言 吊车即借助机械操作相对容易的把重物垂直调到高出的机械装置。吊车一般用于中大型机械企业,但随着我们日常生活中所遇到的新问题越来越多,如北方农民每到丰收季节需要把粮食送到房顶晾晒等一些单靠人力比较困难的情况。 因而本次设计课题主要针对家用或者广泛的说是民用。 而我们所设计的可拆装式简易吊车具有实用性强,操作简单,价格低廉,易于收取且收起来时不怎么占用空间。非常适合民用。当然由于时间相对仓促,我们设计水平有限,因而应该会有许多不足之处,往老师斧正。

工作机构的设计 这里的工作机构是这吊车的起升机构,即包括卷筒,滑轮和钢丝绳。 1.1钢丝绳的选择 1.1.1钢丝绳的种类 钢丝绳又叫钢索,是用优质高强度碳素钢制成的。其拉力强度高,耐磨损,是起重机工作中最常用的材料之一。其种类很多。 1按钢丝绳的绳股数量不同可分为单股和多股。单股刚性较强,不易挠曲。多股是先由钢丝拧成股,再有股拧成绳,随着股数的增加,股内的钢丝愈细愈多,加上中间有个柔软的芯子,其挠曲性也就愈来愈好,其可在直径较小的卷筒和滑轮中工作,在起重机中以6股和8股应用最多。 2按搓捻方向不同可分为右同向捻,左同向捻,右交互捻,左交互捻和混合捻等几种。钢丝搓捻方向和钢丝股搓捻方向一致的称为同向捻,反之称为交互捻,相邻两股钢丝的捻向相反称为混合捻。 同向捻钢丝绳表面平整,比较柔软,易于弯曲。它与滑轮槽的接触面积大,因而单位面积压力小,不易磨损,比交互捻钢绳耐用,但由于绳股和钢丝都向一个方向搓捻,因而吊重物时会使重物旋转,而起同捻还易于打结,纠缠给工作带来不便,故不适合用于吊车。交互捻钢绳的性能却刚好与之相反,虽然耐磨性差点,但可满足吊车工作要求。3按芯材分可分为纤维芯,石棉芯和金属芯三种。油浸泡过的纤维芯钢绳比较柔然,易于弯曲,且因油的作用可使钢绳不易生锈,但其不能在高温和横向重压下工作。石棉芯除了比较柔软,易于弯曲外还可

简易吊车租赁协议

编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载 简易吊车租赁协议 甲方:___________________ 乙方:___________________ 日期:___________________ 说明:本合同资料适用于约定双方经过谈判、协商而共同承认、共同遵守的责任与 义务,同时阐述确定的时间内达成约定的承诺结果。文档可直接下载或修改,使用 时请详细阅读内容。

承租方:(简称甲方) 出租方:(简称乙方)根据双方共同协商,同意租用吊车,配合甲方吊装,具体内容磋商如下: 一、施工机械名称吨吊车,数量:台。 二、施工内容和地点:. 三、租赁时间从______ 年 __ 月___ 日至______ 年 _ 月__ 日。 四、甲方同意支付乙方设备进出场费用元整。 五、税后计收费标准元/ 月,没有满月按元/天计算,租用费用按月付款,租赁时间每满一个月时,承租方在三天内汇入出租方指定帐户。甲方退场当天结清所有月租金,如未结清乙方有权不退场,并按月租价的2%收取每天的滞纳金,结帐时乙方不提供正式发票。 1、乙方机组人员在甲方施工期间,住宿就餐等生活问题由甲方负责; 2、乙方机组在施工期间所用燃油料,由甲方负责; 3、乙方机械在施工行驶过程中所发生的过路、过桥费由甲方负责。 六、施工现场的场地条件、吊装条件及吊具均由甲方负责。如需夜间施工,甲方必须做好充足的照明工作。乙方机械进场后,如因上述问题不能起吊,由此造成的损失由甲方负责。 七、严格执行安全操作规程,不能违章作业,严禁超负荷起吊。乙方机械进场后,甲方须负责每天工作之余该吊车的保卫工作,以免发生机械意外,如因甲方原因造成乙方机械损坏或丢失(包括车上零部件),甲方要负责赔偿。 八、甲方在吊装中,必须指派具有起重指挥资质的起重工指挥,并在施工前做好安全技术交底工作,统一指挥信号,确保施工安全。如因甲方在吊装指挥中的失误造成的损失由甲方负责,坚持做到“十不吊”即: 1、超过额定负荷不吊。 2、指挥信号不明,重量不明不吊

外贸报价单模板

PRODUCT QUOTATION Company address Official website of the company

1. Company Introduction 1.1 Profile We are one of the China’s leading suppliers of the paper bag making machine in the eco friendly food paper bags industries. To give client completely solutions of manufacturing paper bags based on client’s real demand. Only high quality products can win the widest market. Hence, we strictly focus on manufacturing every component with high standard quality of paper Bag Machines and paper bag auxiliary machine since the beginning. In the production process of paper Bag Machine, we pay attention to every detail and quality control of the production line. We can get high quality materials with lower prices. We always focus on manufacturing paper bag machines and paper handle machines with lowest cost and good quality. Through the utilization of high quality materials and stringent quality controls, our products are extremely reliable, easy to operate, and performs at a high speed.

简易吊车设计

简易吊车设计 本课题的目的就是设计一简易吊车来代替人力实现重物的搬运。该吊车的工作原理是:由电动机经带轮传动和一对开式齿轮传动,将运动和动力传给卷筒,再通过钢丝绳和滑轮组来提升重物。通过任务书中的条件参数,设计计算相关的数据,选择钢丝绳的种类和型号,进而计算出卷筒和滑轮的直径,确定一些其它的标准零部件。在此基础上进行传动装置的设计和计算,完成其进行结构设计,工作主要包括完成了轴的设计、确定了带轮的结构、齿轮的结构、卷筒的结构、滑轮的结构、伸臂杆和支撑杆的结构,绘制了绘制了吊车的总装配图、制动轮装置和卷筒装置的结构图,完成部分零件工作图的设计。 1 前言 起重机是在一定范围内垂直提升和水平搬运重物的多动作起重机械,又称吊车。它主要用来吊运成件物品,配备适当吊具后也可吊运散状物料和液态物料。起重机的工作特点是作间歇性运动,即在一个工作循环中取料、运移、卸载等动作的相应机构是交替工作的。各机构经常处于起动、制动和正反方向运转的工作状态。起重机通常按结构分为臂架型起重机和桥架型起重机。臂架型起重机包括塔式起重机、门座起重机、浮游起重机、自行式起重机、由桅杆和臂架组成的桅杆起重机、沿墙壁运行的壁行起重机和装在船舶甲板上的甲板起重机等;桥架型起重机包括桥式起重机、龙门起重机、运载桥和缆索起重机等。随着我国机械化的发展,中、大型机械设备越来越多的运用于各行各业。由于人力资源有限以及人力的局限性,在很多人力无法完成搬运的时候,我们更多的会想起用一种机器代替人力,起重设备就孕育而出。吊车作为起重设备的一种,它具有操作简单、易于移动、使用灵活方便、适应性强等优点,简易吊车由电动机经带传动和一对开式齿轮传动,将运动和动力传给卷筒,再通过钢丝绳和滑轮组提升重物。但如何发展大起重量的起重机、提高电气设备的可靠性和使用寿命逐步成为研究热点。 1.1 吊车的历史 中国古代灌溉农田用的桔槔是臂架型起重机的雏形;14世纪,西欧出现人力和畜力驱动的转动臂架型起重机;19世纪前期,出现了桥式起重机;起重机的重要磨损件如轴、齿轮和吊具等开始采用金属材料制造,并开始采用水力驱动;到了19世纪后期,蒸汽驱动的起重机逐渐取代了水力驱动的起重机;20世

汽车吊吊装施工方案简易版

沧州市太原路提升改造工程综合管廊工程 起重吊装施工方案 编制人: 审核人: 批准人: 河北建工集团有限责任公司 2017年7月10日

目录 一、工程概况 (2) 二、编制依据 (2) 三、施工 (3) 四、汽车吊施工组织流程 (3) 五、吊装准备工作 (3) 六、吊运步骤 (4) 七、汽车吊使用注意事项 (4) 八、汽车吊参数 (7)

一、工程概况 1、本工程为沧州市太原路(北高速出口~迎宾大道)提升改造工程综合管廊工程一期工程,位于河北省沧州市迎宾大道西侧,高速北出口东侧,东西走向,呈线型布置,对应桩号为K3+250--K3+550,全长约300米。基坑开挖深度最小约为7.1m,最深约为7.45m;基坑开挖最窄约为27m,最宽约为31m。临时路为宽六米混凝土路,布置在管廊南吊装时吊车以路中心为轴线支设。路中距管廊北侧槽边约为25m?27m。 2、本工程施工作业工程量大,工期紧任务重,钢筋、模板、螺栓定型模板等材料无法依靠人工倒运至施工高度,综合上述施工问题依据本工程施工现场成线型特征综合考虑施工进度和施工质量,经我公司会议协商决定使用8T、50T汽车吊来配合本工程施工。汽车吊的主要任务是对每个单项工程施工过程中所需的各种材料的吊装,以及配合每道工序的施工作业,主要吊装的材料有:钢筋、模板、螺栓定型模板、预埋件、架管等。 3、工程相关单位 建设单位:沧州市建设投资集团有限公司 监理单位:沧州三环工程建设监理有限公司 设计单位:上海市政工程设计研究总院(集团)有限公司 施工单位:河北建工集团有限责任公司 二、编制依据 《汽车式起重机租赁公司提供的出厂检测报告、产品说明书》 《建筑机械使用安全技术规程》 JGJ33-2001 《建筑施工安全检查标准》 JGJ59-99 《现场施工平面布置图》 《一期施工组织设计》 《基坑开挖支护图纸》 三、施工准备

完整的外贸报价单模板-

完整的外贸报价单一、报价单的头部 01,卖家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 02,买家基本资料(举例) 工厂标志(Factory Logo) 公司名称(Company) 详细地址(Detailed Address) 邮政编码(Post Code) 联系人名(Contact) 职位名称(Job title) 电话号码(Telephone No.) 传真号码(Fax No.) 手机号码(Mobile No.) 邮箱地址(E-mail Address) 聊天方式(Messenger Online) 公司网址(Website Address) 03,报价单的抬头: 报价单标题(Quotation/Quotation Form/Price List) 参考编号(Reference No.) 报价日期(Date) 有效日期(Valid date) 二、产品基本资料(Product’s Basic information) 序号(No.) 货号(Item No.) 型号(Type) 产品名称(Product’s Name) 产品图片(Photo) 产品描述(Description) 原材料(Materials)

相关文档
相关文档 最新文档