文档库 最新最全的文档下载
当前位置:文档库 › 大学英语四级考试流程及详细分数分布

大学英语四级考试流程及详细分数分布

大学英语四级考试流程及详细分数分布
大学英语四级考试流程及详细分数分布

大学英语四级考试流程及详细分数分布大学英语四级考试流程:

8:50——9:00 试音时间

9:00——9:10 播放考场指令,发放作文考卷

9:10 取下耳机,开始作文考试

9:35 发放含有快速阅读的试题册(但9:40才允许开始做)

9:40——9:55 做快速阅读 (15分钟)

9:55——10:00 收答题卡一(即作文和快速阅读)

9:55——10:00 重新戴上耳机,试音寻台,准备听力考试

10:00 开始听力考试,电台开始放音

听力结束后完成剩余考项。

11:20全部考试结束。

新题型英语四级各题详细分值

1.作文:15,,合106.5分;

2.快速阅读:10,合71分,每个7.1分; 10个

3.听力客观题(单选):25,合177.5分每个7.1分;

4.听力主观题(复合式听写):10,合71分,前八个每个3.55分共

28.4分,后三个每个14.2分,共42.6分; (共11个) 5.阅读短句问答:10% 合71分,每个14.2分; 5个 6.仔细阅读理解:15,合106.5分,共10个每个

10.65分。 7.完形填空:10,合71分,共20个每个3.55分。 8.句子翻译:5,合35.5分,共5个,每个7.1分。 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to

eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

9.加起来总计:100,合710分。

1.作文分数占总分的15%,也就是106.5分,在这部分你要达到63.9分为及格。答题时间为30分钟。

2.快速阅读占总分的10%,即71分,在这部分你要达到42.6分为及格分。题号为1-10题,答题时间为15分钟。

3.听力部分占总分的35%,即248.5分,在这部分的及格分为149.1分。题号为11-35题,答题时间为35分钟。

4.是一篇篇章词汇理解和两篇传统的阅读理解,总分数为177.5分。在这部分你要达到106.5分为及格分。题好为36-66。答题时间为25分钟。

5.是完形填空(或改错),占总分的10%,即71分,在这部分你要达到42.6分及格。题号67-86,答题时间为15分钟。

6.翻译,汉译英并且需译部分只是一般的短句翻译。占总分的5%,即35.5分,在这部分你要达到21.3分为及格,题号为87-91,答题时间是15分钟

四级听力题目构成与比例

小对话: 8% 选择题共8段小对话,8道题,放音一遍

长对话: 7% 选择题共2段长对话,7道题,放音一遍

(短文听力: 10% 选择题共3篇文章,10道题,放音一遍)

复合式听写:10% 听写填空填8个单词和3句话,放音三遍

听力位于考试的卷二部分,共占全卷35%

the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding

omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable

tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

CET4考试流程

时间项目说明

开始入凭准考证、身份证,检查准考证上的考场号8:45 场是否与本考场相符,不携带违规物品入场。

迟到考生禁止入场。

发答题卡1和答题卡2。只能用黑色字迹签入场结9:00 字笔在答题卡上填写姓名、准考证号,用束 2B铅笔涂黑相应的信息点。暂不填写答题卡2上试卷代号一栏。不能提前答题。

考试正式开始。考生做试题的第一部分,即考试开9:10 写作部分(用黑色字迹签字笔答题)。考试始全程,考生不得提前退场。

监考员发试题册。将试题册背面向上放到考发试题生桌子左上角,并要求考生不得提前翻阅或9:35 册改变试卷位置,否则按违规违纪处理。考生不能提前翻阅试题册。

写作部分考试结束。考生打开试题册,开始写作结做试题的第二部分,即快速阅读理解部分, 9:40 束 15分钟后(即9:55)结束快速阅读理解部分的答题。

收答题收答题卡1。收卷期间考生不得答题,否则9:55 卡1 作违规违纪处理。

听力考试正式开始。监考员播放听力磁带。

注:考试听力磁带AB双面都有内容。A面

内容播放完后将有提示语,提示监考教师将

磁带手动转换到B面,请不要使用录音机的听力考10:00 自动翻面功能。提示语为:“A面内容已结试开始束,请监考教师听到‘嘀’的一声后,手动将磁带转换到B面继续播放”。

听力考试结束后,考生开始做试题的第四部

分。

离考试结束还有十分钟,将试题册封面上的填写试11:10 试卷代号填涂在答题卡2上试卷代号一卷代号栏。

考试结束,立即停止答题。

监考员验收各考生试题册和答题卡2,清点考试结11:20 无误后,组织考生退场(严禁考生带走试题束册和答题卡)。

违规违纪考生在登记表上签字确认。

the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors,

avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

题型分值所占比例题数×

每小题

分数

写作 106.5分 15% 1题×

106.5

分/题

快速阅读 71分 10% 10题×

7.1分/

题听客观题 177.5分 25% 25题×

(单选) 7.1分/

题力主观题前8题 28.4分 8题×

(复合10% 3.55分

式听写) /题

后3题 42.6分 3题×

14.2/

选词填空 71分 10% 10题×

7.1分/

阅读理解 106.5分 15% 10题×

the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable

tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

10.65

分/题

完形填空 71分 10% 20题×

3.55分

/题

句子翻译 35.5分 5% 5题×

7.1分/

总计 710分 100% 共92

样卷答题

试题内容答题卡结构时间

Part 30

Writing

I minutes Answer

Sheet 1 Part Reading Comprehension(Skimming 15

II and Scanning) minutes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find

fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

Part 35

Listening Comprehension

III minutes Part Reading Comprehension(Reading 25 IV in Depth) minutes Answer

Sheet 2 Part 15

Cloze

V minutes Part 5

Translation

VI minutes

the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable

lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes

相关文档