文档库 最新最全的文档下载
当前位置:文档库 › 合同中的不可抗力、延期和仲裁条款

合同中的不可抗力、延期和仲裁条款

合同中的不可抗力、延期和仲裁条款

15. Force Majeure 不可抗力条款

不可抗力条款 = 不可抗力时间 + (当事方)采取的行动

在运输中,或许会遇到一些非人为因素的影响或者破坏,这个时候我们需要事先协商好如何解决以免发生不必要的争执。

例1:如果遭遇无法控制的时间或情况应视为不可抗力,但不限于火灾、风灾、水灾、地震、爆炸、叛乱、传染、检疫、隔离。如要是不可抗力一方不能履行合同规定下义务,另一方应将履行合同的时间延长,所延长的时间应于不可抗力事件的时间相等。

Any event or circumstance beyond control shall be regarded as Force Majeure but not restricted to fire, wind, flood, earthquake, explosion, rebellion, epidemic, quarantine and segregation. In case either party that encounters Force Majeure fails to fulfill the obligation under the contract, the other party should extend the performance time by period equal to the time that Fore Majeure will last.

例2:如果不可抗力持续6个月以上,合同双方应尽快通过友好协商的方式调整继续履行合同事宜。如果双方不能达成协议,则根据合同中第12条款通过仲裁决定。

If the Force Majeure last over 6 months, the two parties of the contract should settle the case of continuing the contract by friendly negotiation as soon as possible. Should the two parties fail to reach an agreement will be settled by arbitration aording to Clause 12 of the contract thereof.

16. Late Delivery and Penalty 延期交货和惩罚条款

合同中,如果有一方未能完全履行合同,或者按照合同规定交货,应该受到惩罚。

例1:如果乙方因自身原因而未准时完工,乙方应付违约罚款,每天按总价的千分之一计算,即一千二百六十美元整。

If party B fails to finish the work on schedule due to its own reason, he shall pay to the other party the penalty at 1‰of the total value of the work per day, that is USD one thousand two hundred and sixty dollars.

例2:如果合资一方未能按本合同第5条规定按期付款,违约方应在逾期后一个月付给另一方10%的利息。如果违约方逾期3个月仍未如资,合同另一方根据本合同第53条规定有权终止合同并向违约方索赔损失。

Should either joint-venturer fails to pay the contribution on schedule aording to Clause 5, the default party should pay the other 10% of the interest one month after the dead line. The other party shall hold right to terminate the contract or to claim the damage against / to him aording to Clause 53 thereof, if the default party has not done so three months after the deadlin

内容仅供参考

英文合同中不可抗力条款的约定

英文合同中不可抗力条款的约定 一、什么是不可抗力条款(Force Majeure Clause) 合同一经制定,合约双方都希望能够按照合同规定顺利履行合同。但是有时因情势变更,往往会出现一些出乎当事人意料的事情发生,而导致当事人无法履行合同。这种由于当事人所不能控制的事故而导致合同不能履行的,即是不可抗力(Force Majeure),合同中关于这一事项的约定的条款就是不可抗力条款(Force Majeure Clause)[①]。该条款实际上也是一项免责条款。在合同签订后,不是由于当事人的过失或疏忽,而是由于发生了当事人所不能预见的、无法避免和无法预防的意外事故,以致不能履行或不能如期履行合同,遭受意外事故的一方可以免除履行合同的责任或可以延期履行合同,另一方无权要求损害赔偿。“Force Majeure”一词来自于《法国民法典》第1148条,英文译为:“There is no occasion for damages where, in consequence of force majure or accident the debtor has been prevented from conveying or doing that to which he has obliged or has done what he was debarred from doing.”[②]《牛津法律词典》是这样解释的:“Irresistible compulsion or coercion. The phrase is used particularly in commercial contracts to describe events possibly affecting the contract and that are completely outside the parties’ control. Such events are normally listed in full to ensure their enforceability; their may be include *acts of God, fires, failure of suppliers or subcontractors to supply the suppliers under the agreement, and strikes and other labour disputes that interfere with the suppliers’ performance of an agreement. An express clause would normally excuse both delay and a total failure to perform the agreement.”[③] 二、不可抗力条款的基本内容 一般来说,不可抗力条款中应当包括以下几个方面的内容: 1. 不可抗力发生的原因(种类); 2. 不可抗力发生后通知对方的期限、通知的方法以及应当提交的证明文件; 3. 不可抗力发生的免责事项及善后处理事项。 (一)不可抗力发生的原因(种类) 对于不可抗力条款,约定的越详细越好,有些合同,为了省事,往往只是笼统地规定“This contract is subject to force majeure clause”(合同根据不可抗力条款订定),这是相当粗糙的。因为对于什么是“不可抗力”,哪些情况属于不可抗力,不同的人理解是不一样的,有些情况对于处于不同法律地位的当事人来说,并不认为是不可抗力,所以不可抗力发生后,一旦有纠纷就会无所适从。 并非所有的意外事故都可以视为不可抗力而免除当事人的履行合同的义务,所以对于哪些事故足以构成不可抗力,从而免除当事人履行合同的义务,自然而然地就有必要加以明确的约

房屋租赁合同不可抗力

房屋租赁合同不可抗力 篇一:房屋租赁合同(承租方) [ ]房屋屋面租赁合同 合同签订地:[ ] 甲方:[ ] (出租人) 法定代表人\负责人:[ ] 地址:[ ] 乙方:中国电信股份有限公司[ ] 分公司(承租人)法定代表人\负责人:[ ] 地址:[ ] 甲乙双方本着平等、自愿的原则,经协商一致订立本合同,并共 同遵守。 第一条租赁标的 甲方同意将坐落在[ ] (地址)[ ] (部位)的房屋屋面 /楼顶(“房屋屋面”)出租给乙方作架设通信天线和/或搭建机房用途 使用,使用面积为[ ] 平方米,具体位臵见附件(可附有关平面图并 加划红线确定)。 甲方应提供乙方使用的房屋屋面配套设备(如有),详

见 附件[ ] 。 第二条租赁期、租金及支付 租赁期为[ ] ,自[ ]年[ ]月[ ]日(“起租日”)起,至[ ]年[ ]月[ ]日。甲方应在起租日前将房屋屋面交付乙方使用。 房屋屋面使用费(“租金”)为每年度[ ] 元人民币(¥[ ] 元/年)。上述租金的确定,适用以下第[ ] 方式: (1)租金中已含税,甲方自行承担缴税义务及责任。 (2)租金中不含税,乙方负责代扣代缴相应税金。 乙方按照以下第[ ] 种方式向甲方支付租金: (1)租金按[ ] (月、季、年)结算,在甲方出具相应金额的、 符合国家规定的发票后,乙方在每[ ] (月、季、年) 度第一个[ ] (月、季)的[ ] 日前以[ ] (现金、支票、转账)方式支付下一 结算周期的租金给甲方。 (2)租金按[ ] (月、季、年)结算,乙方应在每[ ] (月、 季、年)度第[ ] 个[ ] (月、季)的[ ] 日前以[ ] (现金、

工程合同履行过程中的不可抗力因素

建设工程合同履行过程中的不可抗力因素有哪些? 2009-10-11 22:49 建设工程合同履行时间长,履行过程中会遇到一些难以预料的风险发生,风险发生就意味着要加重一方的经济责任,或者导致工期延长。但是有些风险因素是无须双方承担责任的,最主要的就是不可抗力。 民法通则规定:“因不可抗力不能履行合同或者造成他人损害的,不承担民事责任,法律另有规定的除外”建设工程合同履行过程中的不可抗力是指承、发包双方在签约时不可预见、不可避免并不能克服的客观情况。发生不可抗力的情况后,承包方应迅速采取保护措施以尽力减少损失,并在最短期限内通知发包方损失情况。如因承包方未及时采取有关的保护措施或未履行尽快的通知义务,致使损失扩大的,承包方对扩大的损失承担责任。律师可依据拟签订的合同合理提示委托人在发生不可抗力不能履行合同时,应当及时书面通知另一方,并在不可抗力结束后及时提供证明。不可抗力包括重大的自然灾害,如重大的地震、海啸、台风、海浪、洪水、蝗灾、风暴、冰雹、沙尘暴、火山爆发、山体滑坡、雪崩、泥石流;还包括战争等不能有合同当事人预见等社会因素。此外,工程建设合同当事人还可以约定其他双方不能预见的因素,以降低自身的责任风险,比如约定交通管制、法规修改、政策变化、物价急剧变化等社会因素。 没有任何法律条文对工程施工过程中出现不可抗力的赔偿标准进行过界定,但在《建设工程施工合同(示范文本)》第二部分《通用条款》39.3有针对不可抗力费用承担的划分依据,而这个文本是业内比较常用的一个文本,其中有许多内容,基本上是约定俗成的,尤其是通用条款,通常人们在合同签订时不会对这块进行改动。如果你签订的是建设部推荐使用的文本,则在第39.3有如下约定:“发包人承担的不可抗力事件导致的费用主要包括:工程本身的损害、因工程损害导致第三人人员伤亡和财产损失、施工场地内施工材料及待安装设备的损害以及工程所需清理修复费用等,承包人机械设备损坏、停工损失则由承包人自行承担,双方的人员伤亡由各自所在单位负责。”因此,如果建设工程项目《施工合同》采纳了上述合同范本,且在《专用条款》等合同文件中未另行约定,发包人与承包人应按上述约定分别承担不可抗力所导致的损失风险。 注:根据《民法通则》和《合同法》的规定,“不可抗力”是指不能预见、不能避免并不能克服的客观情况。不可抗力主要包括以下几种情形:(1)自然灾害:如地震、台风、洪水、冰雹、火灾、暴风雨、雪灾、海啸等;(2)政府行为,如征收、征用;(3)社会异常事件,如罢工、骚乱、战争等。显然,地震属于“不可抗力”。 房地产建筑工程节点 1、拆迁完成(毛地--净地) 2、工程开挖(破土动工)

不可抗力对施工合同履行的影响

不可抗力对施工合同履行的影响--《建筑经济》 不可抗力对建设工程施工合同履行的影响 1、概述 “5.12”汶川大地震发生后,许多建筑物倒塌并造成人员伤亡,受灾地区大部分在施工程项目停工,许多在建工程出现了不同程度的损坏。经过全国人民的共同努力,灾区重建工作已经有序开展,除在建工程毁损严重或项目停建者外,大部分工程项目已经具备复工条件。但由于地震的影响,很多地方的建筑材料被用作抗震救灾物资,造成建筑材料短缺性涨价。同时,由于地震引发的大量川籍农民工回乡救灾,致使工程项目出现“农民工荒”,农民工工资大幅上涨。这对本来利润就极其微薄的施工企业来说,无疑是雪上加霜,面临巨额亏损。由此可见,地震对建设工程施工合同的履行产生了较为严重的影响,甚至一定程度上造成了合同当事人双方利益的失衡。本文以此为切入点,结合法律规定和《建设工程施工合同(示范文本)》及《土木工程施工合同条件(FIDIC)》中的具体规定,对不可抗力对建设工程施工合同履行的影响进行分析,以期对建设工程合同管理和工程实践有所帮助。 2、不可抗力与不可抗力条款 关于不可抗力的定义,我国法律有明确规定,即认为不可抗力是指不能预见、不能避免并不能克服的客观情况。所谓“不能预见”是指以一般人的判断能力无法预见某种事件的发生;“不能避免”是指当事人已经尽到了最大的努力,仍然不能避免某种事件的发生;“不能克服”是指当事人在某种事件发生后已尽到最大努力仍不能克服事件所造成的后果。不可抗力主要包括自然灾害,政府行为及社会异常事件等。 建设工程中广泛使用的《建设工程施工合同(示范文本)》(1999年发布)(以下简称《示范文本》)及《FIDIC土木工程施工合同条件》(以下简称《FIDIC合同条件》)中除对不可抗力进行定义外,还以列举的方式对其进行了详细解释。 值得注意的是,《示范文本》及《FIDIC合同条件》都属于格式合同文本,不具有当然的法律效力,仅在当事人将其作为双方认可的合同文本或在合同中引

建设合同条款中不可抗力的界定

建设合同条款中不可抗力的界定、认定 及与价款中费用的界限之探讨 河南建筑职业技术学院许可 在建设合同中如何约定不可抗力范围与工程价款的确定方式密切相关,目前很多省市的工程合同仍以定额确定合同价款的方式居多,因此,如何在合同条款中约定不可抗力的范围、出现了不可抗力事件后如何认定及与工程定额取定费用的界限如何划分至关重要。本文着重讨论与工程合同中的不可抗力的相关内容。 “不可抗力”是一个法律术语,按照我国《民法通则》和《合同法》等法律的定义,不可抗力是指不能预见、不能避免并不能克服的客观情况。它包括自然现象和社会现象两种,自然现象诸如地震、台风、洪水、海啸,社会现象如战争、海盗、罢工、政府行为等。 《民法通则》等107条规定“因不可抗力不能履行合同或者造成他人损害的,不承担民事责任”。 《招投标法》第六十条规定“中标人不履行与招标人订

立的合同的,履约保证金不予退还,给招标人造成的损失超过履约保证金额的,还应当对部分予以赔偿;没有提交履约保证金的,应当对招标人的损失承担赔偿责任。中标人不按照与招标人订立的合同履行义务,情节严重的,取消其二年至五年内参加依法必须进行招标的项目的投标资格并予以公告,直至由工商行政管理机关吊销营业执照。因不可抗力不能履行合同的,不适用前两款规定。” 《合同法》第117条规定,“因不可抗力不能履行合同的,根据不可抗力的影响,部分或者全部免除责任”。 从这些规定可以看出,不可抗力是关于违约责任和侵权责任的一种免责抗辩权和索赔权,即免除由于不可抗力事件而违约的一方的违约责任。一般应规定的内容包括:不可抗力事件的范围,事件发生后通知对方的期限,出具证明文件的机构以及不可抗力事件的后果。并由此计算因不可抗力造成损失进行损失计算及责任分担。 合同中的不可抗力条款,按对不可抗力事件范围规定的不同,主要有以下三种方式:

房屋租赁合同,不可抗力

房屋租赁合同,不可抗力 篇一:合法的房屋租赁合同 房屋租赁合同 甲方:(出租人)身份证: 乙方:(承租人)身份证: 双方经友好协商,根据《合同法》及国家、当地政府对房屋租赁的有关规定,就租赁房屋一事达成以下协议。 第一部分房屋概况 第1条甲方保证向乙方出租的房屋系_________(本人/共有)拥有完全所有权和使用权。(如果房屋是共有,则还应增加:已经共有人同意,附书面同意声明。如果是委托租赁,应有房屋所有权人与受托人的委托协议书) 第2条房屋法律概况房屋所有权证书登记人:_________ 身份证号码:_________ 房屋所有权证书编号:_________ 土地使用权证书编号:_________ 房屋所有权证书上登记的房屋建筑面积:_________ 房屋的使用面积:_________ 房屋的附属建筑物和归房屋所有权人使用的设施:_________ 第3条出租房屋概况

(包括从落地址、名称、用途、间数、建筑面积、使用面积、地面、墙壁质量、家具设备等) 第二部分租赁期限 第4条房屋租赁期限:_________自_________年_________月_________日至_________年_________月_________日止。遇以下情况应顺延: 1.发生不可抗力事由的; 2.甲方非正常原因逾期交付房屋的; 3.非乙方原因致使房屋无法居住的; 4.经双方协商一致并书面更改的。 第三部分租金条款 第5条租金每月_________元(大写:_________整)。 第6条租金按_________(月/季/半年/年)支付;自本合同生效之日起_________日内,乙方应支 清下一_________(月/季/半年/年)的租金。(也可以约定以月、年等支付租金日期) 第7条租金支付地点:_________。 第8条租金支付方式:_________(现金、支票、汇票、转帐等)。 第9条甲方收取租金时应提供合法有效的收据,否则乙方有权拒绝支付租金。 第四部分保证金和其他相关费用

各类合同中不可抗力条款

各类合同中不可抗力条款 一、建设施工合同 1. 通用条款 17. 不可抗力 17.1 不可抗力的确认 不可抗力是指合同当事人在签订合同时不可预见,在合同履行过程中不可避免且不能克服的自然灾害和社会性突发事件,如地震、海啸、瘟疫、骚乱、戒严、暴动、战争和专用合同条款中约定的其他情形。 不可抗力发生后,发包人和承包人应收集证明不可抗力发生及不可抗力造成损失的证据,并及时认真统计所造成的损失。合同当事人对是否属于不可抗力或其损失的意见不一致的,由监理人按第4.4款〔商定或确定〕的约定处理。发生争议时,按第20条〔争议解决〕的约定处理。 17.2 不可抗力的通知 合同一方当事人遇到不可抗力事件,使其履行合同义务受到阻碍时,应立即通知合同另一方当事人和监理人,书面说明不可抗力和受阻碍的详细情况,并提供必要的证明。 不可抗力持续发生的,合同一方当事人应及时向合同另一方当事人和监理人提交中间报告,说明不可抗力和履行合同受阻的

情况,并于不可抗力事件结束后28天内提交最终报告及有关资料。 17.3 不可抗力后果的承担 17.3.1 不可抗力引起的后果及造成的损失由合同当事人按照法律规定及合同约定各自承担。不可抗力发生前已完成的工程应当按照合同约定进行计量支付。 17.3.2 不可抗力导致的人员伤亡、财产损失、费用增加和(或)工期延误等后果,由合同当事人按以下原则承担:及因工程损坏造成的第三人人员伤亡和财产损失由发包人承担; (2)承包人施工设备的损坏由承包人承担; (3)发包人和承包人承担各自人员伤亡和财产的损失; (4)因不可抗力影响承包人履行合同约定的义务,已经引起或将引起工期延误的,应当顺延工期,由此导致承包人停工的费用损失由发包人和承包人合理分担,停工期间必须支付的工人工资由发包人承担; (5)因不可抗力引起或将引起工期延误,发包人要求赶工的,由此增加的赶工费用由发包人承担; (6)承包人在停工期间按照发包人要求照管、清理和修复工程的费用由发包人承担。 不可抗力发生后,合同当事人均应采取措施尽量避免和减少损失的扩大,任何一方当事人没有采取有效措施导致损失扩大

合同法上的不可抗力与意外事件

合同法上的不可抗力与意外事件 不可抗力是指合同订立时不能预见、不能避免并不能克服的客观情况 构成要件: A.不可预见的偶然性。不可抗力所指的事件必须是当事人在订立合同时不可预见的事件,它在合同订立后的发生纯属偶然。当然,这种预料之外的偶然事件,并非是当事人完全不能想象的事件,有些偶然事件并非当事人完全不能预见。但是由于它出现的概率极小,而被当事人忽略不计,把它排除在正常情况之外,但结果这种偶然事件真的出现了,这类事件仍然属于不可预见的事件。在正常情况下,判断其能否预见到某一事件的发生有两个不同的标准:一是客观标准,即在某种具体情况下,一般理智正常的人能够预见到的,该合同当事人就应当预见到。如果对该种事件的预见需要一定的专门知识,那么只要具有这种专业知识的一般正常水平的人所能预见到的事件则该合同当事人就应当预见。二是主观标准,就是在某种具体情况下,根据行为人的主观条件,如当事人的年龄、发育状况、知识水平、职业状况、受教育程度以及综合能力等因素来判断合同当事人是否应该预见到。 B.不可避免(控制)的客观性。不可抗力事件必须是该事件的发生是因为债务人不可控制的客观原因所导致的,债务人对事件的发生在主观上既无故意,也无过失,主观上也不能阻它发生。债务人对于非因为可归责于自己的原因而产生的事件,如果能够通过主观努力克服它,就必须努力去做,否则就不足以免除其债务。 C.不可克服,指当事人对该事件的后果无法加以克服,即毫无办法加以阻止这是不可抗力的延伸。 根据我国实践、国际贸易惯例和多数国家有关法律的解释,不可抗力事件的范围主要由两部分构成:一是由自然原因引起的自然现象,如,火灾、旱灾、地震、风灾、大雪、山崩等;二是由社会原因引起的社会现象,如,战争、动乱、政府干预、罢工、禁运、市场行情等。一般来说,把自然现象及战争、严重的动乱看成不可抗力事件各国是一致的,而对上述事件以外的人为障碍,如政府干预、不颁发许可证、罢工、市场行情的剧烈波动,以及政府禁令、禁运及政府行为等归入不可抗力事件常引起争议。因此,当事人在签订合同时应具体约定不可抗力的范围。事实上,各国都允许当事人在签订合同时自行约定不可抗力的范围。自行约定不可抗力的范围实际上等于自订免责条款。当事人订立这类条款的方法一般有三种:一种是概括式。即在合同中只概括地规定不可抗力事件的含义,不具体罗列可能发生的事件。如果合同签订后,客观情况发生了变化,双方对其含义发生争执,则由受理案件的仲裁机关或法院根据合同的含义解释发生的客观情况是否构成成不可抗力;另一种是列举式。即在合同中把属于不可抗力的事件一一罗列出来,凡是发生了所罗列的事件即构成不可抗力,凡是发生了合同中未列举的事件,即不构成不可抗力事件;第三种是综合式,即在合同中既概括不可抗力的具体含义,又列举属于不可抗力范围的事件。 我们国家对不可抗力的理解:

英文合同中不可抗力条目的约定

英文合同中不可抗力条款的约定 一、什么是不可抗力条款(Force Majeure Clause ) 合同一经制定,合约双方都希望能够按照合同规定顺利履行合同。但是有时因情势变更,往往会出现一些出乎当事人意料的事情发生,而导致当事人无法履行合同。这种由于当事人所不能控制的事故而导致合同不能履行的,即是不可抗力(Force Majeure ),合同中关于这一事项的约定的条款就是不可抗力条款(Force Majeure Clause )[①]。该条款实际上也是一项免责条款。在合同签订后,不是由于当事人的过失或疏忽,而是由于发生了当事人所不能预见的、无法避免和无法预防的意外事故,以致不能履行或不能如期履行合同, 遭受意外事故的一方可以免除履行合同的责任或可以延期履行合同,另一方无权要求损害赔偿。 “Force Majeure”一词来自于《法国民法典》第1148条,英文译为:“There is no occasion for damages where, in consequence of force majure or accident the debtor has been prevented from conveying or doing that to which he has obliged or has done what he was debarred from doing.”[②]《牛津法律词典》是这样解释的:“Irresistible compulsion or coercion. The phrase is used particularly in commercial contracts to describe events possibly affecting the contract and that are completely outside the parties’ control. Such events are normally listed in full to ensure their enforceability; their may be include *acts of God, fires, failure of suppliers or subcontractors to supply the suppliers under the agreement, and strikes and other labour disputes that interfere with the suppliers’ performance of an agreement. An express clause would normally excuse both delay and a total failure to perform the agreement.”[③]二、不可抗力条款的基本内容 一般来说,不可抗力条款中应当包括以下几个方面的内容:1. 不可抗力发生的原因(种类); 2. 不可抗力发生后通知对方的期限、通知的方法以及应当提交的证明文件; 3. 不可抗力发生的免责事项及善后处理事项。(一)不可抗力发生的原因(种类) 对于不可抗力条款,约定的越详细越好,有些合同,为了省事,往往只是笼统地规定“This contract is subject to force majeure clause”(合同根据不可抗力条款订定),这是相当粗糙的。因为对于什么是“不可抗力”,哪些情况属于不可抗力,不同的人理解是不一样的,有些情况对于处于不同法律地位的当事人来说,并不认为是不可抗力,所以不可抗力发生后,一旦有纠纷就会无所适从。 并非所有的意外事故都可以视为不可抗力而免除当事人的履行合同的义务,所以对于哪些事故足以构成不可抗力,从而免除当事人履行合同的义务,自然而然地就有必要加以明确 、管路敷设技术通过管线不仅可以解决吊顶层配置不规范高中资料试卷问题,而且可保障各类管路习题到位。在管路敷设过程中,要加强看护关于管路高中资料试卷连接管口处理高中资料试卷弯扁度固定盒位置保护层防腐跨接地线弯曲半径标等,要求技术交底。管线敷设技术中包含线槽、管架等多项方式,为解决高中语文电气课件中管壁薄、接口不严等问题,合理利用管线敷设技术。线缆敷设原则:在分线盒处,当不同电压回路交叉时,应采用金属隔板进行隔开处理;同一线槽内强电回路须同时切断习题电源,线缆敷设完毕,要进行检查和检测处理。、电气课件中调试对全部高中资料试卷电气设备,在安装过程中以及安装结束后进行 高中资料试卷调整试验;通电检查所有设备高中资料试卷相互作用与相互关系,根据生产工艺高中资料试卷要求,对电气设备进行空载与带负荷下高中资料试卷调控试验;对设备进行调整使其在正常工况下与过度工作下都可以正常工作;对于继电保护进行整核对定值,审核与校对图纸,编写复杂设备与装置高中资料试卷调试方案,编写重要设备高中资料试卷试验方案以及系统启动方案;对整套启动过程中高中资料试卷电气设备进行调试工作并且进行过关运行高中资料试卷技术指导。对于调试过程中高中资料试卷技术问题,作为调试人员,需要在事前掌握图纸资料、设备制造厂家出具高中资料试卷试验报告与相关技术资料,并且了解现场设备高中资料试卷布置情况与有关高中资料试卷电气系统接线等情况 ,然后根据规范与规程规定,制定设备调试高中资料试卷方案。 、电气设备调试高中资料试卷技术电力保护装置调试技术,电力保护高中资料试卷配置技术是指机组在进行继电保护高中资料试卷总体配置时,需要在最大限度内来确保机组高中资料试卷安全,并且尽可能地缩小故障高中资料试卷破坏范围,或者对某些异常高中资料试卷工况进行自动处理,尤其要避免错误高中资料试卷保护装置动作,并且拒绝动作,来避免不必要高中资料试卷突然停机。因此,电力高中资料试卷保护装置调试技术,要求电力保护装置做到准确灵活。对于差动保护装置高中资料试卷调试技术是指发电机一变压器组在发生内部故障时,需要进行外部电源高中资料试卷切除从而采用高中资料试卷主要保护装置。

第八讲 索赔、不可抗力和仲裁

第八讲索赔、不可抗力和仲裁 学习目标 通过本讲的学习,理解索赔和理赔的含义,掌握如何规定异议和索赔条款以及违约金条款;理解不可抗力的含义及不可抗力条款的规定,正确判断和处理不可抗力事故;认识仲裁的意义和仲裁协议的作用,理解仲裁条款的主要内容,掌握仲裁的含义及特点。 第一节索赔 第二节不可抗力 第三节仲裁 █ 本讲小结 █ 典型案例 █ 经贸英语撷英 █ 自测题 █ 作业题 学习单元内容概述 第一节索赔 一、异议与索赔条款(一般掌握) 二、罚金条款(一般掌握) 第二节不可抗力 一、不可抗力的含义(一般掌握) 二、不可抗力条款的规定(一般掌握) 三、援引不可抗力条款应注意的事项(重点掌握) 第三节仲裁 一、对外贸易仲裁的意义和特点(一般了解) 二、仲裁协议的形式和作用(一般掌握) 三、仲裁条款(重点掌握) 第一节索赔 一、异议与索赔条款 (一)索赔的含义 索赔(Claim)是指履行国际货物买卖合同的受损方向违约方提出损害赔偿的要求。违约方对受损方所提出的赔偿要求予以受理并进行处理,称为理赔(Settlement of Claim)。可见,索赔与理赔是一个问题的两个方面。对受损方而言,称作索赔;对违约方而言,称作理赔。 (二)索赔的类型 涉及国际货物买卖的索赔,一般有三种情况: 1.贸易索赔。 它是以买卖合同为基础的,当一方当事人违反买卖合同规定时,受损方可依据买卖合同规定和违约事实提出索赔。属于卖方违约的,主要是交货的时间、品质、数量、包装等不符合合同的规定;

属于买方违约的,主要是不按时接货、付款、办理租船订舱等。 2.运输索赔。 它是以运输合同(或契约)为基础的,当一方当事人违反运输合同(或契约)规定时,受损人可以依据运输合同(或契约)规定和违约事实提出索赔。如收货人持有清洁提单而收到的货物发生残损短缺,这与发货人(卖方)无关,收货人只能凭运输合同(或契约)向承运人索赔。 3.保险索赔。 它是以保险合同为基础的,当发生保险合同承保范围内的风险并由此造成损失,被保险人可向保险公司索赔。例如,按CIP条件成交的货物,在运输途中遭遇暴雨而水浸损坏。由于投保了水渍险,买方可凭保险合同向保险公司索赔。 (三)约定索赔条款的意义 索赔事件多发生在交货期、交货品质、数量等问题上,一般地说,买方向卖方提出索赔的情况较多。当然,买方不按期接运货物或无理拒付货款的情况也时有发生,因此,也有卖方向买方索赔的情况。为了便于处理这类问题,买卖双方商订合同时,一般都应订立索赔条款,对索赔条件作出明确具体的规定。 (四)索赔条款的规定办法 国际货物买卖合同中的索赔条款,通常有两种规定办法:一种是异议与索赔条款,多数合同采用这种办法,有的还同检验条款合订在一起。另一种是罚金条款,多用于大宗商品和机器设备的买卖场合。 1.异议与索赔条款(Discrepancy and Claim Clause)。 一般是针对卖方交货品质、数量或包装不符合同规定而订立的,主要包括: (1)索赔依据 (2)索赔期限 (3)索赔处理办法和索赔金额 2.罚金条款(Penalty Clause)。 又称为违约金条款,多见于卖方延期交货或买方延期接货的场合,它的特点是预先在合同中规定罚金的数额或罚金的百分率。 (五)异议与索赔条款的规定 国际货物买卖合同中的异议与索赔条款的主要内容有: 1.索赔依据 索赔的证据就索赔情形、对象而定。向贸易对方索赔,销售合同为主要依据;向承运人索赔须提供运输合同;向保险公司索赔,保险单据为主要凭证,而检验证书则是任何索赔均须出具的。关于检验证书的出具机构,买卖双方也须事先在合同中约定。对于规定买方有复验权的出口合同,则应在合同中规定,要以卖方同意的检验机构出具的检验报告作为索赔的依据。 2.索赔期限 是指索赔的一方向违约方提出索赔要求的有效期。索赔期限的长短应结合不同商品的特性而定。对于易变质的商品,索赔的期限应规定得短一些;一般商品的索赔期限可定得长一些,大约30天—45天;成套设备的索赔期则可更长一些,按照 全套设备安装、调试所需时间而定。索赔期限一经约定,索赔就须在期限内提出,逾期则索赔无效。 3.索赔处理办法和索赔金额 关于索赔的处理办法,因为事先无法预测违约的后果,因此,合同中不做具体规定,一般只做笼统规定,如整修、换货、退货、还款等。有时与商品检验条款合订在一起,称为“检验与索赔条款”。(Inspection and Claim Clause)

合同法不可抗力条款

合同法不可抗力条款 不可抗力条款是规定在合同订立后发生当事人在订合同时不能预见、不能避免、不可控制的意外事故,以致不能履行合同或不能如期履行合同时,遭受不可抗力的一方可以免除履行合同的责任的条款。 自然灾害导致死亡的事件屡见不鲜,不管是生活还是工作中一般情况下不可抗力因素所导致的后果都是得不到赔偿的。通常情况下在合同中也应该对不可抗力有所说明,那在合同中我们应该说明哪些不可抗力的因素呢?比如台风、洪水、罢工等自然灾害和社会异常等都属于不可抗力因素,那么大家知不知道合同法不可抗力条款是怎样的呢?合同法不可抗力条款成立具备哪些条件呢? 一、合同法不可抗力条款 不可抗力条款是指合同中订明如当事人一方因不可抗力不能履行合同的全部或部分义务的,免除其全部或部分的责任。另一方当事人不得对此要求损害赔偿。因此,不可抗力条款是一种免责条款。

不可抗力条款是规定在合同订立后发生当事人在订合同时 不能预见、不能避免、不可控制的意外事故,以致不能履行合同或不能如期履行合同时,遭受不可抗力的一方可以免除履行合同的责任的条款。在合同的撰写中不可抗力条款会因为实际客观条件不同而有所不同。 二、不可抗力的条款成立具备哪些条件 1、意外事故是在签订合同以后发生的; 2、意外事故是当事人所不能预见、不能避免和不可控制的。不可抗力的事故主要包括两种情况,一种是由于自然力量引起的,如水灾、风灾、旱灾、地震等;另一种是社会原因引起的,如战争、封锁、政府禁令等; 3、意外事故的引起没有当事人疏忽或过失等主观因素。 不可抗力的法律后果与结果 依1980年《联合国国际货物销售合同公约》的规定,遭受不可抗力的一方可解除合同或延迟履行而不承担责任。只有在不可抗力因素与当事人的过失同时存在的情况下,当事人才承担相应的赔偿责任。遭受不可抗力后合同的结果主要为下列: 1、解除合同。一般来说,如果不可抗力事故使合同的履行成为不可能,则可解除合同。如在买卖特种粮食的交易中,该特种粮食的产地因水灾而失收,在这种情况下,可以解除合同。

各类合同协议书中不可抗力条款

各类合同协议书中不可 抗力条款 文件编号TT-00-PPS-GGB-USP-UYY-0089

各类合同中不可抗力条款 一、建设施工合同 1. 通用条款 17. 不可抗力 17.1 不可抗力的确认 不可抗力是指合同当事人在签订合同时不可预见,在合同履行过程中不可避免且不能克服的自然灾害和社会性突发事件,如地震、海啸、瘟疫、骚乱、戒严、暴动、战争和专用合同条款中约定的其他情形。 不可抗力发生后,发包人和承包人应收集证明不可抗力发生及不可抗力造成损失的证据,并及时认真统计所造成的损失。合同当事人对是否属于不可抗力或其损失的意见不一致的,由监理人按第4.4款〔商定或确定〕的约定处理。发生争议时,按第20条〔争议解决〕的约定处理。 17.2 不可抗力的通知

合同一方当事人遇到不可抗力事件,使其履行合同义务受到阻碍时,应立即通知合同另一方当事人和监理人,书面说明不可抗力和受阻碍的详细情况,并提供必要的证明。 不可抗力持续发生的,合同一方当事人应及时向合同另一方当事人和监理人提交中间报告,说明不可抗力和履行合同受阻的情况,并于不可抗力事件结束后28天内提交最终报告及有关资料。 17.3 不可抗力后果的承担 17.3.1 不可抗力引起的后果及造成的损失由合同当事人按照法律规定及合同约定各自承担。不可抗力发生前已完成的工程应当按照合同约定进行计量支付。 17.3.2 不可抗力导致的人员伤亡、财产损失、费用增加和(或)工期延误等后果,由合同当事人按以下原则承担: 及因工程损坏造成的第三人人员伤亡和财产损失由发包人承担; (2)承包人施工设备的损坏由承包人承担; (3)发包人和承包人承担各自人员伤亡和财产的损失;

第七章 检验索赔不可抗力和仲裁

第七章商品的检验、索赔、不可抗力和仲裁 [教学目的和要求] 要求学生掌握国际货物买卖合同中,检验、索赔、不可抗力和仲裁条款的规定方法和有关的知识。 [内容提要] 7.1 货物的检验 7.2 索赔 7.3 不可抗力 7.4 仲裁 [本章的重点和难点] 检验时间和地点的选择;索赔对象的确定;索赔条款的拟订;不可抗力事件的判断;仲裁协议的形式和作用;仲裁裁决的效力。 [教学内容] 第一节:货物的检验检疫 (Commodity Inspection and Quarantine) 一、约定商品检验的意义 1. 商品检验是双方交接货物中必不可少的重要环节。商检机构出具的相应的检验证书,是双方货物交接、支付货款和进行索赔和理赔的重要依据。 2.要严把进口和出口商品的质量关,必须以商品的检验为前提和基础。 3.货物的检验是国际货物买卖合同中的一个重要内容。 各国法律规定:买方收到货物并不等于他已经接受了货物。除双方另有约定外,买方有权对自己所购买的货物进行检验。如果买方收到货物后,经检验认为与合同不符,而且确属卖方责任,买方有权要求给予损坏赔偿等补救措施,直至拒收货物。 《公约》38条及英国《1893年货物买卖法》: 在我国商品检验检疫的法律依据概括为“四法三条例”即: 1。《中国人民共和国进出口商品检验法》,《商检法实施条例》; 2。《中国人民共和国进出境动植物检疫法》,《进出境动植物检疫法实施条例》

3。《中国人民共和国国境卫生检疫法》,《国境卫生检疫法实施细则》 4。《中华人民共和国食品卫生法》 案例分析1:我方售货给加拿大的甲商,甲商又将货物转售给英国的乙商。货抵甲国后,甲商已发现货物存在质量问题,但仍将原货运往英国,乙商收到货物后,除发现货物质量问题外,还发现有80包货物包装破损,货物短少严重,因而向甲商索赔,甲商又向我方提出索赔。问:我方是否应负责赔偿?为什么? 案例分析2:我A公司与美国B公司以CIF价格出口一批农产品,订约时,我A公司已知货物将被转销加拿大。货物到达纽约后,立即转运加拿大。其后,美国B公司凭加拿大商检机构签发的证书,向我方索赔。问:对此,我方应如何处理? 合同中的检验条款一般包括:检验时间和地点、检验机构、检验证书以及货物与合同不符时买方索赔的时限等内容。 二、商品检验检疫的时间和地点 (确定检验时间和地点,实际是确定买卖双方中的哪一方行使对货物的检验权,即确定以哪一方提供的检验证书为准。) 检验权:买方或卖方有权对所交易的货物进行检验,其检验结果作为交付与接受的依据。(一)在出口国检验 1.产地(工厂)检验: 在货物离开产地或工厂之前进行检验为止的责任,由卖方负责,对于运输途中的一切变化,卖方概不负责。 2.装运港(地)检验:(shipping quality and weight): 注:以上两种方法否定了买方的复验权,对买方不利。 (二)在进口国检验 1.目的港(地)检验Laded quality and weight) 2.买方营业处所(最终用户所在地)检验: 适用于使用前不便拆开包装或因不具备检验条件而不能在目的港或目的地进行检验的货物,如密封包装的货物、精密仪器,需要安装调试的机器设备等。 采取以上两种方法时,卖方须承担到货品质或数量的责任,对卖方不利。 (三)出口国检验,进口国复验 该方法兼顾了买卖双方的利益,公平合理,是目前我国进出口业务中最常用的一种方法。(四)装运港(地)检验重量,目的港(地)检验品质(shipping quantity and landed quality)近年来,国际上出现了一些新的做法和变化。如出口国装运前预检验,在进口国最终检验。 三、检验、检疫机构 (一)我国的检验检疫机构 1.1949年成立中华人民共和国商品检验局→1982中华人民共和国进出口商品检验局”→1998

中国合同法——不可抗力

免责事由的涵义 第四节免责事由 免责事由又称为免责条件,它是指法律规定的或者当事人约定的免除当事人承担违约责任的情况。一旦免责事由出现,当事人对于不履行或不适当履行合同不承担民事责任。 免责事由具有以下特点: 第一,免责事由分为法定的免责事由和约定的免责事由,如既无法定的免责事由又无约定的免责事由出现而导致合同不能履行,则不能免责。 第二,免责事由适用的效果是导致债务人被免除责任。即由于免责事由的出现而导致债务人不能履行债务,债务人则可不承担违约责任。 第三,免除责由出现,只有导致合同不能履行时,才能被免责。如虽然免责事由出现,但合同仍然能履行,当事人不履行时,不能免责。 二、违约责任免责事由的样态 违约责任免责事由包括两种,一是法定的免责事由,二是约定的免责事由。约定的免责事由即免责条款,已在前文作丁说明,此处不再赘言。 法定免责事由,又称为法定免责条件,它是指由法律直接规定而不是由当事人约定的免责条件。法定的免责事由,当事人可以约定排除其适用。根据我国法律规定,法定的免责事由包括以下几种情况: 1.不可抗力不可抗力是指不能预见、不能避免并不能克服的客观情况。所谓“不能预见”是指以一般人的预见能力为标准而不能预见。“不能避免”是指当事人已尽了最大努力仍然不能避免某种事件的发生。“不能克服”是指当事人在事件发生以后,已尽到了最大的努力,仍不能克服事件所造成的后果使合同不能得以履行。不可抗力最主要、最根本的特征是不能避免并不能克服。也就是说,在某些情况下,即使能够预见也是无法避免、无法克服的。 不可抗力可以分为两类,一是自然事件,二是社会事件。前者如地震、台风、洪水、干旱、蝗虫、海啸、冰雹、雷电等;后者如战争、动乱等。对于不可抗力的范围,各国理解也不完全相同,我国法律对此无具体规定,因此,当事人可以在合同中约定。如果当事人在合同中有约定时,则根据当事人的约定来确定不可抗力的范围。 不可抗力作为法定免责事由,在我国合同法等117条中有所体现。该条规定:“因不可抗力不能履行合同的,根据不可抗力的影响,部分或者全部免除责任,但法律另有165规定的除外。”山根据该条规定,因不可抗力导致合同不能履行,应根据其影响程度来确定其免责范围,即当不可抗力导致合同全部不能履行,则免除其全部不履行的责任,如果不可抗力致使合同部分不能履行,则免除其部分不履行的责任。 同时应当注意,发生不可抗力并非必然免责,当事人必须依法定程序办理有关手续。我国合同法第118条规定:“当事人一方因不可抗力不能履行合同的,应当及时通知对方,以减轻可能给对方造成的损失,并应当在合理期限内提供证明。”⑦因此,因不可抗力而免责还应具备两个程序上的条件:一是及时通知对方,二是在合理期限内提供发生不可抗力及导致合同不能履行的证明。 二、预期违约 (一)预期违约的概念预期违约也称为先期违约,是指在履行期限到来之前+当事人一方无正当理由而明确表示其在履行期到来后将不履行合同,或者其行为表明其在履行期到来以后将不可能履行合同。我国合同法第108条规定:“当事人一方明确表示或者以自己的行为表明不履行合同义务的,对方可以在履行期限届满之前要求其承担违约责任。,,① ①有关我国合同法第108条的典型判例,参见内蒙古自治区高级人民法院民事判决书

第九章 检验、索赔、不可抗力和仲裁

第九章检验、索赔、不可抗力和仲裁 一、名词解释 法定检验不可抗力索赔罚金条款仲裁根本性违约 二、填空 1、( )是检验条款的核心。 2、发生索赔情况的主要原因有三:一是( );二是( );三是( )。 3、不可抗力事故引起的后果/处理办法主要有( )和( )。 4、在对外贸易发生争议时,最常用的解决方式是( )。 5、不可抗力是指当事人在订立合同时不能预见,对其发生和后果( ),( )。 6、合同中规定的检验机构签发的检验鉴定证书对当事人具有()。 7、我国在进口()和()时,一般采取工厂检验。 8、定金是作为()而存在的。 9、2万件羊毛衫在储存中由于不可抗力事件发生损失了1万件,若羊毛衫分别售于两个货主,而未对羊毛衫作()处理,则卖方对两个买主都无法引用不可抗力条款免责。 10、我国常设的仲裁机构主要是()和( ). 三、单项选择题 1、关于买卖合同中检验时间和地点的规定方法,当前使用最为广泛的一种是()。 A.在装运港检验 B.在目的港检验 C.在装运港检验重量,目的港检验品质 D. 装运地检验,目的地复检 2、在出口国检验、进口国复验这种检验条款的规定方法()。 A.对卖方有利 B. 对买方有利 C.比较公平合理,它照顾了买卖双方的利益 D. 对保险公司有利 3、根据《公约》的规定,买方向卖方提出索赔的最后期限是()。 A.货物在装运港装运完毕即提单签发日期后两年 B.货物到达目的港协力海轮后两年 C. 经出口商品检验机构检验的出结果后两年 D. 买方实际收到货物起两年 4、我方与的商签订一笔进口机器零件的合同。合同签订以后,德商安排两间工厂同时投入生产。在生产过程中,其中一间工厂由于意外事故遭致火灾,完全丧失了生产能力,德商()。 A.因遇不可抗力事故,可要求解除合同 B. 因遇不可抗力事故,可要求延期履行合同 C. 因遇不可抗力事故,可要求延期履行合同,但我方有索赔的权利 D. 不属于不可抗力事故,我方应要求按期履行合同 5、在国际货物买卖中,较常采用的不可抗力事故范围的规定方法是()。 A.概括规定 B.不规定 C.具体规定 D.综合规定 6、多数国家的法律都规定,仲裁的裁决是()。 A.终局性的 B.可以上诉的 C.可以更改的 D.无约束力的 7、以下()不是检验证书的作用。 A.作为证明买方所交货物的品质、重量(数量)、包装及卫生条件等是否符合合同规定及索赔、理赔依据 B.确定检验标准和检验方法的依据 C.作为卖方向银行议付货款的单据之一

相关文档
相关文档 最新文档