Talking about the project

claim the prevention and treatment

Abstract:In project management, construction claim is a complex business management. Today's domestic project contracting market is becoming more competitive, successful low-cost has become a regular operation, the operating contractor for the construction of the claim is very important to achieve the goal. The significance of the claim and described the concept for today's domestic construction projects in claims management problems were analyzed and the corresponding countermeasures and suggestions of the project and counter-claims both sides claim the contract is an indispensable business component. Based on the analysis of the factors that claims the project, discussed the contract on the implementation of the project claim the deal with the principles and specific treatment.

Key words: engineering claim prevention deal with

1. The definition and classification of claims

Claim the project is the fulfillment of the contract, the contract due to the other party did not fulfill its obligations under the contract and this led to losses, other demands for compensation or the right to compensation. The incidence of claims is a two-way, as long as the contract side of the responsibility and obligation not to achieve contract, or to provide the conditions inconsistent with the contractual status, there are claims that may arise. It is also a kind of a right, under normal circumstances, the claim refers to the contractor in the implementation of the contract process, the reasons for their non-extension of the project, and require owners to increase the cost of compensation for the loss of a claim. The owners belong to the construction unit should bear the responsibility for the cause, and the actual loss to the construction of requests for compensation, known as the anti-claim.

1.1 The purpose of their claims can be divided into two categories: construction claims and claims costs.

Claim Construction Engineering refers to, as a result of non-responsibility of the contractor causes delay in the construction process for approval of the contract extended period of the claim. Construction units of the purpose of the claim period is usually two: first, removed or have been shirking its responsibility to extend the duration of the contract responsibility, so

1

that they do not pay as much as possible or not to extend the time limit to pay fines; II is due to extension of the period and The cost of damage caused by the claim. If the project is not the responsibility of delay caused by the construction, and construction units have been approved construction project claim, the construction units can be made as a result of measures taken to speed up and increase the cost of claims. The cost of claims is based on the principle of compensation for actual losses, and its purpose is to require financial compensation. When the reality of the conditions of the contract and inconsistent, leading to increase in contractor expenses in excess of the requirements of the plan's cost of the additional compensation expenses, in order to save his commitment should not be economic losses.

2. The cause of the project claim

2.1 Engineering design arising from claims.

As the construction drawings in error or defective, working drawings and the actual construction site in geology, environment, or the difference between the design drawings and specifications does not match the description of expression is not tight construction, equipment, materials, the name of the model specifications that Or the wrong amount of work is not clear and many other aspects of the flaws and omissions, resulting in rework. Inevitable in order to produce in the period, the labor, materials, and other aspects of the claims.

2.2 Do not close the signing of the contract arising from claims

The contract is a contract agreement, the tender documents, tender, contract-specific provisions, general provisions of the contract, drawings, BOQ and to fulfill the contract in the course of a series of supplementary agreements such as the composition of the document, the contracts signed between the two sides in accordance with the law The entry into force, legally binding, either party may change or dissolve the non-performance of the contract or the powers and duties. However, due to construction projects and the complexity of the construction period, as well as the natural environment, climate, such as long-term factors, together with the terms of the contract in terms of security is not strong, between the conflicting documents, are likely to make the parties enter into the Construction contracts can not take full account of all factors and a clear impact on the project, which led to the construction of the claim.

2.3 The risk of accidents and unforeseen factors such as changes in the conditions of the claim

During the construction process, changes in the conditions of the construction site of the project cost and impact, such as earthquakes, typhoons, war, rebellion, radioactive pollution and nuclear hazards, such as force majeure risks and natural disasters as well as the construction of sand mud emerged, geological Fault, natural cave, subsidence and underground structures or

2

objects on the ground floor, and other unknown obstacles, often leading to the changes caused by the construction claim. If excavation works due to the discovery of underground structures and cultural relics, and so on, the drawings did not say construction indeed difficult to foresee a reasonable man-made obstacles, such as the deal is bound to lead to an increase in the cost of the project, the construction units can claim.

2.4 Project construction contracts management changes in the claim.

The current construction market, the project construction contracts have a total package, sub-, sub-designate, contract labor, equipment, materials supply contract and a series of contract, so as to enable the project construction contracts and management has become complicated by the difficulty Great. When any of the contracts can not perform well or poorly managed, will affect the project construction period, the quality and quantity, sparking the project, quality, quantity and economic aspects of the claim. Such as equipment, material suppliers, according to the project's design and construction schedule on time in accordance with the provision of quality equipment, materials, engineering, can not by the owners of the requirements and design specifications and the specifications for the construction, so as to affect the project construction The progress and quality, leading to the owners, with a total package side, the sub-side, the equipment and materials suppliers mutual claims.

3 Works to prevent and deal with the claims.

3.1 The project Prevention claims

Of the above factors in the analysis of the project claim, the claim works, as owners of the management of the main square in the prevention and treatment efforts must be dealt with the principles and specific ways to deal with, making a reasonable claim for compensation evidence to ensure the progress of the construction project, quality, the cost of a virtuous circle. Should do the following specific areas:

3.1.1 To strengthen the claim of forward-looking prevention. As owners, supervision engineers and contractors must use their experience and the relevant regulations, to take active measures to prevent foreseeable claims the incident occurred. Such as strengthening the management of the contract, to strengthen preparatory work to strengthen the design review, and so on. However, if the claim is indeed taken place, should take active measures to control claims costs to a minimum.

3.1.2 In market economy conditions, the contract is binding both A and B criterion of economic behavior. As the owner's managers should pay attention to fully and strictly carry out the contract. Before signing the contract should be repeated, as appropriate, the terms of the

3

contract, pay attention to the strict letter of the contract documents, in order to prevent the implementation of the contract process as a result of loopholes in the text caused by the opportunity to claim, resulting in additional investment.

In the design of management should strive to obtain the contract by design drawings, data, and units designed to improve the quality of design, conditions permitting the introduction of the design competition, designed to improve the quality of service. 〖JP2〗through the design of the credibility of the tender selection, design, management capacity in areas such as better design of the unit, designed to reduce as much as possible the reasons for increase in the risk of project cost, the latter designed to improve the quality of service.

3.1.3 In the supply of materials, equipment and materials should be done on time and the supply, quality volume. As far as possible to avoid the supply of material specifications of the type, variety and not caused by the drawings of alternative materials.

3.1.4 The price may rise to the claim by the construction tender will be taken to increase the risk of a package as a death order to guard against the practice, that is, in business contracts, according to the length of period, the market price trend forecast, the two sides to agree on a cost risk To the contractors and contract during the construction of national and local government policy documents are no longer the implementation of price adjustment.

3.2 Engineering claims.

3.2.1 Should be based on a contract basis to deal with claims must be reasonable; have to pay attention to data collection, information truthfulness, reliability, and after that must deal with claims in a timely manner; in dealing with the specific claims process, we must A close examination of the period when the claims should be given, should be given when the cost of claims. For example: an extremely bad weather conditions, we have exceeded the expected normal rain and snow, seriously hampering the progress of projects at this time, the construction units may be required, the owner can grant an extension period, that is, the establishment of the claim period, but the cost should not be Claim. For instance, in the works in full swing during part of the project changes, construction has been finished on the part of the change and wait for the drawings when part of the construction and mechanical requirements of the claim, this time, to have been part of the End of the claim, it should benefit all, Including the costs and profits, but stagnation and machinery, due to the time when the construction season, it is entirely possible that this first part of the personnel, machinery to use elsewhere, to be paid should be the only change of duty and the types of work efficiency to lower costs.

4

3.2.2 To deal with claims in the event of limitations should be carried out inspection, the building of China's construction contracts (GF-1999-2001) in the light of international common FIDIC conditions of contract claim against the statute of limitations provides as follows: "The claim occurred within 28 days of Engineers to issue a claim Notice; issued a notice of claim within 28 days to raise additional engineers to extend the duration of the contract price or the claims report and related information; engineers sent to the contractor received the report and claims information after the 28 days given to sign rehabilitation, Or ask the contractor to add further grounds for the claim and evidence. Engineers in 28 days or did not respond to the contractor for further requirements, as the claims have been approved. " Excess of the limitation period for claims, as the case may have the right to refuse. At the same time, the claim should be effective to deal with in a timely manner.

3.2.3 Should clearly define the responsibilities, strict examination fees. The claim of actual events are often responsible for both contracts, which should identify the reasons, clearly define responsibilities and in accordance with the terms of the contract's pricing review to determine the contract that both sides should bear the cost.

3.2.4 Should work to strengthen the control of the initiative, works to reduce the claim. This requires the owners in project management, as far as possible the work should be made in advance, to reduce the incidence of claims. This will enable the project to carry out more smoothly, reducing investment projects to reduce the construction period. To sum up, the claim for the prevention and management of investment projects to control play an important role in the international engineering construction in general will be designed to claim the contract price of 10-15% in individual cases even more. In order to better handle the construction of the claims the problem from the project to strengthen the construction plans and construction contract management, strengthen personnel training to start, actively explore and practice. References

[1] Wu Yuan, Wu Yin, China's construction industry, claims the status quo and countermeasures [J]. Economist, 2006, (3).

[2] Xu Wei, Jin Fu, Chen Lianjie. Standardize the implementation of the construction project supervision Manual [M]. Beijing: China Building Industry Press, 2001.

[3] Dong Cheng Hai, Zhang Jiansheng. Analysis of Construction Contract Management Problems and Solutions [J]. Modernization construction management, 2001, (1).

[4] Cheng Hu. Encyclopedia of Practical construction contract management [M]. Beijing: China Building Industry Press, 2000, (1).

5

安全工程专业英语部分翻译

Unit 1 safety management system Accident causation models 事故致因理论 Safety management 安全管理Physical conditions 物质条件 Machine guarding 机械保护装置 House-keeping 工作场所管理 Top management 高层管理人员 Human errors 人因失误Accident-proneness models 事故倾向模型 Munitions factory 军工厂Causal factors 起因Risking taking 冒险行为Corporate culture 企业文化Loss prevention 损失预防Process industry 制造工业Hazard control 危险控制Intensive study 广泛研究Organizational performance 企业绩效 Mutual trust 相互信任Safety officer 安全官员 Safety committee 安全委员会Shop-floor 生产区Unionized company 集团公司Seniority 资历、工龄Local culture 当地文化 Absenteeism rate 缺勤率Power relations 权力关系Status review 状态审查 Lower-level management 低层管理者 Business performance 组织绩

效 Most senior executive 高级主管 Supervisory level 监督层Safety principle 安全规则Wall-board 公告栏Implement plan 执行计划Hazard identification 危险辨识 Safety performance 安全性能 One comprehensive definition for an organizational culture has been presented by Schein who has said the organizational culture is “a pattern of basic assumptions – invented, discovered, or developed by a given group as it learns to cope with its problems of external adaptation and internal integration –that has worked well enough to be considered valid and, therefore, to be taught to new members as the correct way to perceive, think, and feel in relation to those problems” 译文:Schein给出了组织文化的广泛定义,他认为组织文化是由若干基本假设组成的一种模式,这些假设是由某个特定团体在处理外部适应问题与内部整合问题的过程中发明、发现或完善的。由于以这种模式工作的有效性得到了认可,因此将它作为一种正确的方法传授给新成员,让他们以此来认识、思考和解决问题[指适应外部与整合内部的过程中的问题]。 The safety culture of an organization is the product of individual and group values, attitudes, perceptions, competencies, and patterns of behavior that determine the commitment to, and the style and proficiency of , an organization’s health and safety management. 译文:组织的安全文化由以下几项内容组成:个人和群体的价值观、态度、观念、能力和行为方式。这种行为方式决定了个人或团体对组织健康安全管理的责任,以及组织健康安全管理的形式和熟练程度。 Unit 2 System Safety Engineering System safety engineering 系统安全工程By-product 附带产生的结果

工程成本预算 毕业论文外文文献翻译

外文翻译 Construction projects, private and public alike, have a long history of cost escalation. Transportation projects, which typically have long lead times between planning and construction, are historically underestimated, as shown through a review of the cost growth experienced with the Holland Tunnel. Approximately 50% of the active large transportation projects in the United States have overrun their initial budgets. A large number of studies and research projects have identified individual factors that lead to increased project cost. Although the factors identified can influence privately funded projects the effects are particularly detrimental to publicly funded projects. The public funds available for a pool of projects are limited and there is a backlog of critical infrastructure needs. Therefore, if any project exceeds its budget other projects are dropped from the program or the scope is reduced to provide the funds necessary to cover the cost growth. Such actions exacerbate the deterioration of a state’s transportation infrastructure. This study is an anthology and categorization of individual cost increase factors that were identified through an in-depth literature review. This categorization of 18 primary factors which impact the cost of all types of construction projects was verified by interviews with over 20 state highway agencies. These factors represent documented causes behind cost escalation problems. Engineers who address these escalation factors when assessing future project cost and who seek to mitigate the influence of these factors can improve the accuracy of their cost estimates and program budgets Historically large construction projects have been plagued by cost and schedule overruns Flyvbjerg et al. 2002. In too many cases, the final project cost has been higher than the cost estimates prepared and released during initial planning, preliminary engineering, final design, or even at the start of construction “Mega projects need more study up front to avoid cost overruns.” The ramifica tions of differences between early project cost estimates and bid prices or the final cost of a project can be significant. Over the time span between project initiation concept development and the completion of construction many factors may influence the final project costs. This time span is normally several years in duration but for the highly

工程管理专业毕业设计外文翻译(外文+翻译)

Study on Project Cost Control of Construction Enterprises By: R. Max Wideman Abstract With the increasing maturity of construction market, the competition between construction enterprises is becoming fierce. The project profit is gradually decreasing. It demands that all construction enterprises enhance their cost control, lower costs, improve management efficiency and gain maximal profits. This paper analyses the existing problems on project cost control of Chinese construction enterprises, and proposes some suggestions to improve project cost control system. Key Words :Construction enterprises, Project management, Cost control After joining the WTO, with Chinese construction market becoming integrated, the competition among architectural enterprises is turning more intense. Construction enterprises must continually enhance the overall competitiveness if they want to develop further at home and abroad construction market. Construction Enterprises basically adopt the "project management-centered" model, therefore, it is particularly important to strengthen project cost control. 1.The Current Domestic Project Cost Classification and Control Methods Cost refers to the consumption from producing and selling of certain products, with the performance of various monetary standing for materialized labor and labor-consuming. Direct and indirect costs constitute the total cost, also known as production cost or manufacturing cost. Enterprise product cost is the comprehensive indicator to measure enterprise quality of all aspects. It is not only the fund compensation scale, but also the basis to examine the implementation of cost plan. Besides, it can provide reference for product pricing According to the above-mentioned definition and current domestic cost classification, construction project cost can be divided into direct costs and indirect costs. Direct costs include material cost, personnel cost, construction machinery cost, material transportation cost, temporarily facility cost, engineering cost and other direct cost. Indirect costs mainly result from project management and company's cost-sharing, covering project operating costs (covering the commission of foreign projects), project's management costs (including exchange losses of

超越边界的bim工程管理毕业论文外文文献翻译

本科毕业论文 外文文献及译文 文献、资料题目:BIM Beyond Boundaries 文献、资料来源:Design Intelligence 文献、资料发表(出版)日期:2012.12.10院(部):管理工程学院 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期:2015.2.10

外文文献: BIM Beyond Boundaries September 10, 2012 · by Randy Deutsch Abstract: Opting for depth over breadth of expertise is a false choice that will lead individuals, organizations, the profession, and industry in the wrong direction. Keywords: BIM, expertise, anti-learning, master builder Several forces are converging to create an unprecedented and timely opportunity for organizations that have embraced building information modeling (BIM). These forces —including the rise of the expert, the growing complexity and speed of projects, and BIM’s increasing recognition as an enabler, catalyst, and facilitator of team collaboration — also present significant challenges that can be overcome with the right approach and mindset. At one time, being an expert meant knowi ng more than one’s competitors in a particular field. Firms that reinforced their expert culture hoarded information, which resulted in silos of expertise. Today, many firms are looking to hire people perceived as building and software technology experts, shortsightedly addressing today’s needs at the expense of tomorrow’s. While architects have always been trees with many branches, our current economic climate has discouraged them from being anything but palm trees: all trunk, no branches. And yet things change so quickly that those who went to bed experts are unlikely to wake up experts in the morning. Due to the speed and complexity of projects, we do not have time to acquire knowledge the old way — slowly, over time, through traditional means. Even when we supplement our book learning with conferences, webinars, and continuing education, it is impossible to keep up with the flow of new information in our industry. Expertise today is a much more social, fluid, and iterative process than it used to be. Being an expert is no longer about telling people what you know so much as understanding what questions to ask, who to ask, and applying knowledge flexibly and contextually to the specific situation at hand. Expertise has often been associated with teaching and mentoring. Today it’s more concerned with learning than knowing: less to do with continuing education and more with practicing and engaging in continuous education. Social media presents the would-be expert with both opportunities and challenges. Working

安全工程专业英语词汇及翻译(司鹄版)

Unit6 Industry hygiene工业卫生physical hazard物理危害、物质危害nonionizing radiation非电离辐射adverse effects副作用loud noise嘈杂的声音chemical bum化学烧伤live electrical circuits 带电电路confined space密闭空间hearing loss听力丧失physical or mental disturbance身体或精神障碍annoyance烦恼power tools电动工具impulse脉冲sound level meter噪声计jet engine喷气式发动机time-weighted average时间加权平均heat stress热应力、热威胁shivering 颤抖hard labor辛苦工作fatigued疲劳的living tissue活组织plastic sealer塑料密封机biological hazard生物危害potable water饮用水sewage污水physical contact身体接触allergic reaction 过敏反应severe pain剧烈疼痛manual handing手工处理airborne空中的on a daily basis每天hazard communication standard危害通识规定stipulation规定、条款trade name商标名 工业卫生被定义为:“致力于预测、识别、评估和控制环境因素或压力的科学与技术,这些压力产生或来自与工作场所,能够造成疾病、损害人们的幸福安康、或是工程或社区居民的工作效率不高,并使他们感觉到很不舒服。(P67) 当噪音导致暂时或永久的听力丧失,使身体或精神发生紊乱,对语言交流产生干扰,或对工作、休息、放松、睡觉产生干扰时,它是一种非常严重的危害。噪音是任何不被期望的声音,它通常是一种强度变化但不包括任何信息的声音。他干扰人们对正常声音的辨别,可能是有害的,能使人烦恼,并干扰人们说话。(P68) Unit9 Accident investigation事故调查after-the-fact事实背后的take an investigation进行调查fact-finding process寻找事实的过程insurance carrier保险公司/承保人plance blame推卸责任permanent total disability永久全部劳动力丧失for simplicity为简单起见accident prevention 事故预防investigation procedures调查过程fact finding寻找事实operating procedures flow diagrams操作过程流程图maintenance chart维修图表bound notebook活页笔记本physical or chemical law物理或化学定律table of contens 目录narrative叙事的counter-measure干预措施 调查人员在调查过程中从各方面收集证据,从证人、旁观者及一些相关报道中得到信息,在事故发生后尽快的找目击证人谈话,在事故现场遭到改变前进行检查,对事故场景进行拍照并绘制草图,记录与地形相关的所有数据,并将所有的报道复印保存。记录常规的操作流程图、维修图表或对困难、异常现象的报告等非常有用。在活页笔记本中完整准确地记录。记录事故发生前的环境、事故顺序及事故发生后的环境情况等。另外,记录伤者、证人、机械能量来源和危害物质的位置。(P119) Unit10 Safety electricity安全用电electrical equipment电力设备fuse puller保险丝夹break contact断开接点/触电hot side高压端load side 负荷端line side线路/火线端groundfault circuit Interrupt 漏电保护器ground fault接地故障receptacle电源插座hot bubs热水澡桶underwater lighting水底照明fountains 人工喷泉ungrounded(hot)conductor 未接地(高压)单体/火线neutral conductor中性导体fault current载荷中心panelboard 配电板branch-circuit分支电路CB一种多功能插座plug-in插入式 上锁/挂牌成套设备也是可用的。上锁/挂牌套件中包含有必须满足OSHA上锁/挂牌标准的组件。上锁/挂牌套件中包含有可重复使用的危险标签、临时悬挂标志、各种闭锁、锁、磁性标志、及与上锁/挂牌相关的信息。无论什么原因停下工作或当天不能完成工作时,在返回

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

工程管理中英文对照外文翻译文献

中英文对照外文翻译文献 中英文对照外文翻译 The Internet is Applicated in Real Estate The Real Estate Industry and the World Wide Web: Changing Technology, Changing Location.The Internet, in its Web based graphics version, has captured the imagination of both consumers and businesses. Its convenience, speed, low cost and versatility are being exploited on a daily basis in ever-changing ways. Together with its capacity to transform existing businesses, promote new businesses and facilitate exchange of information and data, its other striking attribute has been the speed with which this new technology has spread throughout the global economy. Keywords:The internet;Real Estate;Applicated The number of computer hosts grew by more than ten-fold between 1995 and early 1999. The number of Web sites increased almost 100-fold, to over two million, between 1995 and 1998.By the year 2000, there will be approximately 400-500 million Internet users in the world, and the total number of Web sites will exceed five million. This new technology has the potential for affecting the real estate industry directly and indirectly. Directly, it may become a tool that allows a real estate business to expand its information and sales network. Indirectly, it may change the location equation where and how firms do business which in turn will affect the role of firms involved in real estate development, investment and transactions. Measuring the Spread of the Web

工程管理工程造价中英文对照外文翻译文献

中英文资料对照外文翻译 Design phase of the project cost management Abstract Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives. Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy, Even under the WTO and China's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.

安全工程专业外语翻译

The major contributors in component technology have been the semi-conductor components. (译为“起主要作用”,不译“主要贡献者”。) There are three steps which must be taken before we graduate from the integrated circuit technology. (译为“完全掌握”,不译“毕业于”。) The purpose of a driller is to holes. (译为“钻孔”) A single-point cutting tool is used to cut threads on engine lathes. (译为“车”) The major contributors in component technology have been the semi-conductor components. (译为“起主要作用”,不译“主要贡献者”。) There are three steps which must be taken before we graduate from the integrated circuit technology. (译为“完全掌握”,不译“毕业于”。) The iron ore used to make steel comes from open-pit and underground mines. (译为“炼钢”,不译“制造刚”。) An insulator offers a very high resistance to the passage through which electric current goes. (译为“很大阻力”,不译“高阻力”) Mater can be changed into energy, and energy into mater. 物质可以转换为能,能也可以转化为物质。 The best conductor has the least resistance and the poorest has the greatest. 最好的导体电阻最小,最差的导体电阻最大。 If A is equal to D, A plus B equals D plus B. 若A=D,则A+B=D+B。 The first electronic computers used vacuum tubes and other components, and this made the equipment very large and bulky. 第一代电子计算机使用真空管和其他元件,这使得设备又大又笨。 Oxidation will make iron and steel rusty. 氧化作用会使钢铁生锈。 The cost of such a power plant is a relatively small portion of the total cost of the development. 这样一个发电站的修建费用仅占该开发工程总费用的一小部分。 The resistance of the pipe to the flow of water through it depends upon the length of the pipe, the diameter of the pipe, and the feature of the inside walls(rough or smooth)。 水管对通过的水流的阻力取决于下列三个因素:管道长度、管道直径、管道内壁的特性(粗糙或光滑)。Heat from the sun stirs up the atmosphere, generating winds. 太阳发出的热能搅动大气,于是产生了风。 In general, all the metals are good conductors, with silver the best and copper the second. 一般来说,金属都是良导体,其中以银为最好,铜次之。 The world of work injury insurance is complex. 工伤保险是复杂的。 Any substance is made of atoms whether it is a solid, a liquid, or a gas. 任何物质,不论是固体、液体或是气体,都是有原子组成的。 In the absence of force, a body will either remain at rest, or continue to move with constant speed in a straight line. 无外力作用,物体则保持静止状态,或作匀速直线运动。 A wire lengthens while it is heated. 金属丝受热则伸长。 Practically all substances expand when heated and contract when cooled. 几乎所有的物质都是热胀冷缩的。

工程造价毕业设计参考文献

参考文献 [1]中华人民共和国住房和城乡建设部.GB50500-2008,建设工程工程量清单计价 规范[S].北京:中国计划出版社,2008. [2]福建省建设工程造价管理总站.FJYD-101-2005,福建省建筑工程消耗量定额 [S].北京:中国计划出版社,2005. [3]福建省建设工程造价管理总站.FJYD-201-2005,福建省建筑装饰装修工程消 耗量定额[S].北京:中国计划出版社,2005. [4]中华人民共和国建设部.GB/T50353-2005,建筑工程建筑面积计算规范[S].北 京:中国计划出版社,2005. [5]刘元芳.建筑工程计量与计价[M].北京:中国建材工业出版社,2009. [6]刘元芳.建设工程造价管理[M].北京:中国电力出版社,2005. [7]幸伟.我国政府采购招标投标问题研究[D].东北师范大学,2009. [8]杨平.工程合同管理[M].北京:人民交通出版社,2007. [9]陈慧玲.建设工程招标投标实务[M].南京:江苏科学技术出版社,2004年. [10]邹伟,论施工企业投标报价策略与技巧[J],建筑经济,2007年. [11]陈娟,杨泽华,谢智明,浅谈工程投标报价的策略[J],招投标研究,2004 年. [12]徐学东主编.《工程量清单的编制与投标报价》中国计划出版社.2005年. [13]田满霞,浅谈建设项目的工程造价控制[J].技术市场,2013,(9):188-188. [14]王雪青,国际工程投标报价决策系统研究[J],天津大学博士论文,2003年. [15]Online Computer Library Center, Inc. History of OCLC[EB/OL],2009. [16]Gray,C.,& Hughes,W.(2001).Building design management.Oxford, UK:Butterworth-Heinemann.

工程管理开题报告文献综述范文

工程管理开题报告文献综述范文 宝宝们是不是都在为论文烦恼呢?开题报告、文献综述、外文翻译、抄袭检测软件,都在这啦...快点用起来吧~ 开题报告主要包括以下几个方面: (一)论文名称 论文名称就是课题的名字 第一,名称要准确、规范。准确就是论文的名称要把论文研究的问题是什么,研究的对象是什么交待清楚,论文的名称一定要和研究的内容相一致,不能太大,也不能太小,要准确地把你研究的对象、问题概括出来。 第二,名称要简洁,不能太长。不管是论文或者课题,名称都不能太长,能不要的字就尽量不要,一般不要超过20个字。 (二)论文研究的目的、意义 研究的目的、意义也就是为什么要研究、研究它有什么价值。这一般可以先从现实需要方面去论述,指出现实当中存在这个问题,

需要去研究,去解决,本论文的研究有什么实际作用,然后,再写论文的理论和学术价值。这些都要写得具体一点,有针对性一点,不能漫无边际地空喊口号。主要内容包括: (1)研究的有关背景(课题的提出):即根据什么、受什么启发而搞这项研究。 (2)通过分析本地(校)的教育教学实际,指出为什么要研究该课题,研究的价值,要解决的问题。 (三)本论文国内外研究的历史和现状(文献综述)。 规范些应该有,如果是小课题可以省略。一般包括:掌握其研究的广度、深度、已取得的成果;寻找有待进一步研究的问题,从而确定本课题研究的平台(起点)、研究的特色或突破点。 (四)论文研究的指导思想 指导思想就是在宏观上应坚持什么方向,符合什么要求等,这个方向或要求可以是哲学、政治理论,也可以是政府的教育发展规划,也可以是有关研究问题的指导性意见等。

(五)论文写作的目标 论文写作的目标也就是课题最后要达到的具体目的,要解决哪些具体问题,也就是本论文研究要达到的预定目标:即本论文写作的目标定位,确定目标时要紧扣课题,用词要准确、精练、明了。 常见存在问题是:不写研究目标;目标扣题不紧;目标用词不准确;目标定得过高, 对预定的目标没有进行研究或无法进行研究。 确定论文写作目标时,一方面要考虑课题本身的要求,另一方面要考率实际的工作条件与工作水平。 (六)论文的基本内容 研究内容要更具体、明确。并且一个目标可能要通过几方面的研究内容来实现,他们不一定是一一对应的关系。大家在确定研究内容的时候,往往考虑的不是很具体,写出来的研究内容特别笼统、模糊,把写作的目的、意义当作研究内容。 基本内容一般包括:①对论文名称的界说。应尽可能明确三点:研究的对象、研究的问题、研究的方法。②本论文写作有关的理论、名词、术语、概念的界说。

相关文档
相关文档 最新文档